Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.

Legend:

unplanned

planned

June 2021

Jump to today
1 Jun - Tuesday
Water and sewerage

Unplanned - Water Interruption - Worongary

9.40am - 12.40pm

Streets affected: San Fernando Drive

Cause: Water Leak

Ref:  1000776848

south

Water and sewerage

Unplanned - Water Interruption - Burleigh Waters

10.30am - 1.30pm

Streets affected: Mackay Place

Cause: Repair water main

Ref: 1000777856

south

Water and sewerage

Unplanned - Water Interruption - Burleigh Heads

11.40am - 1.40pm

Streets affected: Cowell drive

Cause: Water Leak

Ref: 1000694575

south

Water and sewerage

Unplanned - Water Interruption - Paradise Point

12.25pm - 12.55pm

Streets affected: Thrush Avenue

Cause: Repair hydrant

Ref: 100076036

 

 

north

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 149 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 135 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 131 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 121 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 121 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 114 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 112 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 107 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 99 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 94 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 79 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 76 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 74 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 72 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 65 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 54 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 44 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 44 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 36 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 35 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 28 of 32

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Yawalpah Road Overpass and Foxwell Road

Show more

Start date: 5 May 2021

End date: 5 June 2021

Duration: 6:30am – 3pm

Reason: To facilitate construction of turning lane into depot - including tree clearing

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 28 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 23 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 23 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 20 of 24

Streets affected: Ascot Court (full road closure local traffic access only) between Racecourse Drive and End of road

Show more

Start date: 13 May 2021

End date: 5 June 2021

Duration: 6am – 6pm

Reason: To facilitate delivery of horses / livestock for the Magic Millions sales

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 20 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 19 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 16 of 22

Streets affected: Petrie Street (half road closure with traffic control – expect delays) between Marine Parade and Eden Avenue

 

 

Show more

Start date: 17 May 2021

 

End date: 7 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Energex works

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 15 of 15

Streets affected: Halfway Drive (half road closure with traffic control – expect delays) between Karall Street and Conebush Circuit

 

Also affected: Rosella Court, Carallia Court

Show more

Start Date: 18 May 2021

 

End Date: 1 June 2021

 

Duration: 9.00am - 2.30pm (Mond-Fri), 6.30am - 6.30pm (Sat)

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 15 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 14 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 14 of 15

Streets affected: Jefferson Lane (full road closure with traffic control – expect delays) between Fifteenth Avenue and Seventeenth Avenue

 

 

Show more

Start date: 19 May 2021

 

End date: 2 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate large concrete pours

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 14 of 18

Streets affected: Halfway Drive (Half road closure with traffic control – expect delays) between Citrinus Court and Conebush Circuit

 

Also affected: Doolan Street

 

Show more

Start date: 19 May 2021

 

End date: 5 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday) 

 

Reason: Install coloured surfacing works on behalf of CoGC

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 13 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 13 of 17

Streets affected: Upper Ormeau Road (Half road closure – expect delays) between Cliff Barrons Road and Hideaway Road

 

Show more

Start date: 20 May 2021

 

End date: 5 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Laying of stormwater pipe across the road.

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 13 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 9 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 8 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 9 of 12

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Archer Street and Musgrave Street

 

Also affected: Lang Street

 

Show more

Start date: 24 May 2021

 

End date: 4 June 2021

 

Duration: 6.30am - 3.00pm

 

Reason: Installation of pram ramps for new pedestrian crossing.

 

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 8 of 15

Streets affected: Observatory Drive (half road closure with traffic control – expect delays) between Golden Grove Boulevard and Gordonia Drive

 

 

Show more

Start date: 25 May 2021

 

End date: 8 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Excavation and resurfacing works

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 8 of 16

Streets affected: Moana Park Avenue (half road closure with traffic control – expect delays) between Kalimna Drive and End of road

 

 

Show more

Start date: 25 May 2021

 

End date: 9 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate works to sewer main and stormwater.

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 8 of 8

Streets affected: Weedons Road (reduced lanes with traffic control - expect delays) between Gilston Road and Coltrene Drive

 

Show more

Start date: 25 May 2021

 

End date: 1 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the installation of new loops.

 

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 7 of 8

Streets affected: Langport Parade (half road closure with traffic control – expect delays) between Wiltshire Drive and Gemvale Drive

 

Show more

Start date: 26 May 2021

End date: 2 June 2021

Duration: 9.00am - 3.30pm

Reason: Installation of new loops 

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 6 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 5 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 5 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 5 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 5 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 5 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 3 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 2 of 5

Streets affected: Dutton Street (half road closure with detour - traffic control on site) between Lanham Street and Tweed Street

Show more

Start date: 31 May 2021

End date: 4 June 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate dismantling of Tower Crane

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 2 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 2 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 2 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 1 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Bushfires

Planned - Bushfire hazard reduction burn - Kirribilli Park Gilston

Day 1 of 3

Streets/area affected: Worley Drive Gilston

Show more

Start: 6am Tuesday 1 June 2021 (weather permitting)
End: 6pm Thursday 3 June 2021
Duration: Three days

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

north

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

 
2 Jun - Wednesday
Water and sewerage

Unplanned - Water Interruption - Biggera Waters

9.00am - 10.00am

Streets affected: Ashbourne Terrace

Cause: Water Leak

Ref: 1000777495

north

Water and sewerage

Unplanned - Water Interruption - Robina

10.00am - 12.00pm

Streets affected: Thorngate Drive, Wattle Glen Place

Cause: Water Leak

Ref: 1000777639

south

Water and sewerage

Unplanned - Water Interruption - Currumbin

12.30pm - 2.30pm

Streets affected: Chippendale Crescent

Cause: Water Leak

Ref: 11000777665

 

south

Water and sewerage

Unplanned - Water Interruption - Tallebudgera

12.30pm - 2.30pm

Streets affected:Tallebudgera Creek Road, Plaza Street

Cause: Water Leak

Ref: 1000778987

south

Water and sewerage

Unplanned - Water Interruption - Elanora

2.45pm - 11.00pm

Streets affected: Taproot Place

Cause: Repair broken main

Ref: 1000779049

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 150 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 136 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 132 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 122 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 122 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 115 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 113 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 108 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 100 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 95 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 80 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 77 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 75 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 73 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 66 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 55 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 45 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 45 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 37 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 36 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 29 of 32

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Yawalpah Road Overpass and Foxwell Road

Show more

Start date: 5 May 2021

End date: 5 June 2021

Duration: 6:30am – 3pm

Reason: To facilitate construction of turning lane into depot - including tree clearing

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 29 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 24 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 24 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 21 of 24

Streets affected: Ascot Court (full road closure local traffic access only) between Racecourse Drive and End of road

Show more

Start date: 13 May 2021

End date: 5 June 2021

Duration: 6am – 6pm

Reason: To facilitate delivery of horses / livestock for the Magic Millions sales

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 21 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 20 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 17 of 22

Streets affected: Petrie Street (half road closure with traffic control – expect delays) between Marine Parade and Eden Avenue

 

 

Show more

Start date: 17 May 2021

 

End date: 7 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Energex works

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 16 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 15 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 15 of 15

Streets affected: Jefferson Lane (full road closure with traffic control – expect delays) between Fifteenth Avenue and Seventeenth Avenue

 

 

Show more

Start date: 19 May 2021

 

End date: 2 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate large concrete pours

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 15 of 18

Streets affected: Halfway Drive (Half road closure with traffic control – expect delays) between Citrinus Court and Conebush Circuit

 

Also affected: Doolan Street

 

Show more

Start date: 19 May 2021

 

End date: 5 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday) 

 

Reason: Install coloured surfacing works on behalf of CoGC

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 14 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 14 of 17

Streets affected: Upper Ormeau Road (Half road closure – expect delays) between Cliff Barrons Road and Hideaway Road

 

Show more

Start date: 20 May 2021

 

End date: 5 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Laying of stormwater pipe across the road.

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 14 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 10 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 9 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 10 of 12

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Archer Street and Musgrave Street

 

Also affected: Lang Street

 

Show more

Start date: 24 May 2021

 

End date: 4 June 2021

 

Duration: 6.30am - 3.00pm

 

Reason: Installation of pram ramps for new pedestrian crossing.

 

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 9 of 15

Streets affected: Observatory Drive (half road closure with traffic control – expect delays) between Golden Grove Boulevard and Gordonia Drive

 

 

Show more

Start date: 25 May 2021

 

End date: 8 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Excavation and resurfacing works

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 9 of 16

Streets affected: Moana Park Avenue (half road closure with traffic control – expect delays) between Kalimna Drive and End of road

 

 

Show more

Start date: 25 May 2021

 

End date: 9 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate works to sewer main and stormwater.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 8 of 8

Streets affected: Langport Parade (half road closure with traffic control – expect delays) between Wiltshire Drive and Gemvale Drive

 

Show more

Start date: 26 May 2021

End date: 2 June 2021

Duration: 9.00am - 3.30pm

Reason: Installation of new loops 

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 7 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 6 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 6 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 6 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 6 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 6 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 4 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 3 of 5

Streets affected: Dutton Street (half road closure with detour - traffic control on site) between Lanham Street and Tweed Street

Show more

Start date: 31 May 2021

End date: 4 June 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate dismantling of Tower Crane

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 3 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 3 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 3 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 2 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Bushfires

Planned - Bushfire hazard reduction burn - Kirribilli Park Gilston

Day 2 of 3

Streets/area affected: Worley Drive Gilston

Show more

Start: 6am Tuesday 1 June 2021 (weather permitting)
End: 6pm Thursday 3 June 2021
Duration: Three days

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

north

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 10

Streets affected: Kumbari Avenue (half road closure with traffic control – expect delays) between Nakina Street and Musgrave Avenue

 

Also affected: Nakina Street

Show more

Start date: 2 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of coloured surfacing works.

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 1 of 22

Streets affected: Helensvale Road (half road closure with traffic control, verge/footpath – expect delays) between Siganto Drive and Shepparton Road

 

Also affected: Siganto Drive

 

 

Show more

Start date: 2 June 2021

 

End date: 23 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: Install a new signal pole.

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 1 of 8

Streets affected: Allied Drive (half road closure with detour and traffic control – expect delays) between Napper Road and Muiriefield Place

 

Show more

Start date: 2 June 2021

 

End date: 9 June 2021

 

Duration: 8.00pm - 5.00am

 

Reason: To facilitate CCTV Manhole camera inspections

north

Water and sewerage

Planned - Water Interruption - Helensvale

Day 1 of 2

Streets affected: HOPE ISLAND ROAD

Cause: Meter replacement

Ref: 1000778145/A66829170

Show more

Start time and date: 10.00pm 2 June 2021
End time and date: 01.00am 3 June 2021

north

 
3 Jun - Thursday
Water and sewerage

Unplanned - Water Interruption - Southport

5.00am - 6.00am

Streets affected: Benowa Road

Cause: Repair fire hydrant

Ref: 1000772091

north

Beach closures and water quality issues

Unplanned - Currumbin Rock Pools - temporary closure

5.46am

  • The City is aware of a potential recreational water quality concern at the Currumbin Rock Pools.
  • At this stage the swimming area at the Currumbin Rock Pools is closed to the public and signage has been erected on site.
  • Daily water sampling will be carried out.
  • The area will not be re-opened until values return to acceptable levels.
  • The safety of our staff, residents and visitors is our number one priority.
  • We apologise for any inconvenience and thank all Customer’s/Residents/Visitors for their patience and assistance.

south

Water and sewerage

Unplanned - Water Interruption - Burleigh Waters

11.50am - 12.15pm

Streets affected: Shearwater Street

 

Cause: Repair water service 

 

Ref: 1000772771

south

Water and sewerage

Unplanned - Water Interruption - Southport

12.50pm - 3.30pm

Streets affected: Kumbari Avenue

 

Cause: Repair water service

 

Ref: 1000772091 

north

Water and sewerage

Unplanned - Water Interruption - Elanora

1.55pm - 3.00pm

Streets affected: Fatsia Court

 

Cause: Repair water service

 

Ref: 1000777604

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 151 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 137 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 133 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 123 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 123 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 116 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 114 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 109 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 101 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 96 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 81 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 78 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 76 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 74 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 67 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 56 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 46 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 46 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 38 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 37 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 30 of 32

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Yawalpah Road Overpass and Foxwell Road

Show more

Start date: 5 May 2021

End date: 5 June 2021

Duration: 6:30am – 3pm

Reason: To facilitate construction of turning lane into depot - including tree clearing

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 30 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 25 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 25 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 22 of 24

Streets affected: Ascot Court (full road closure local traffic access only) between Racecourse Drive and End of road

Show more

Start date: 13 May 2021

End date: 5 June 2021

Duration: 6am – 6pm

Reason: To facilitate delivery of horses / livestock for the Magic Millions sales

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 22 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 21 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 18 of 22

Streets affected: Petrie Street (half road closure with traffic control – expect delays) between Marine Parade and Eden Avenue

 

 

Show more

Start date: 17 May 2021

 

End date: 7 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Energex works

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 17 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 16 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 16 of 18

Streets affected: Halfway Drive (Half road closure with traffic control – expect delays) between Citrinus Court and Conebush Circuit

 

Also affected: Doolan Street

 

Show more

Start date: 19 May 2021

 

End date: 5 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday) 

 

Reason: Install coloured surfacing works on behalf of CoGC

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 15 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 15 of 17

Streets affected: Upper Ormeau Road (Half road closure – expect delays) between Cliff Barrons Road and Hideaway Road

 

Show more

Start date: 20 May 2021

 

End date: 5 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Laying of stormwater pipe across the road.

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 15 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 11 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 10 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 11 of 12

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Archer Street and Musgrave Street

 

Also affected: Lang Street

 

Show more

Start date: 24 May 2021

 

End date: 4 June 2021

 

Duration: 6.30am - 3.00pm

 

Reason: Installation of pram ramps for new pedestrian crossing.

 

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 10 of 15

Streets affected: Observatory Drive (half road closure with traffic control – expect delays) between Golden Grove Boulevard and Gordonia Drive

 

 

Show more

Start date: 25 May 2021

 

End date: 8 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Excavation and resurfacing works

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 10 of 16

Streets affected: Moana Park Avenue (half road closure with traffic control – expect delays) between Kalimna Drive and End of road

 

 

Show more

Start date: 25 May 2021

 

End date: 9 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate works to sewer main and stormwater.

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 8 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 7 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 7 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 7 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 7 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 7 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 7 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 5 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 4 of 5

Streets affected: Dutton Street (half road closure with detour - traffic control on site) between Lanham Street and Tweed Street

Show more

Start date: 31 May 2021

End date: 4 June 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate dismantling of Tower Crane

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 4 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 4 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 4 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 3 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Bushfires

Planned - Bushfire hazard reduction burn - Kirribilli Park Gilston

Day 3 of 3

Streets/area affected: Worley Drive Gilston

Show more

Start: 6am Tuesday 1 June 2021 (weather permitting)
End: 6pm Thursday 3 June 2021
Duration: Three days

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

north

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 10

Streets affected: Kumbari Avenue (half road closure with traffic control – expect delays) between Nakina Street and Musgrave Avenue

 

Also affected: Nakina Street

Show more

Start date: 2 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of coloured surfacing works.

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 2 of 22

Streets affected: Helensvale Road (half road closure with traffic control, verge/footpath – expect delays) between Siganto Drive and Shepparton Road

 

Also affected: Siganto Drive

 

 

Show more

Start date: 2 June 2021

 

End date: 23 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: Install a new signal pole.

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 2 of 8

Streets affected: Allied Drive (half road closure with detour and traffic control – expect delays) between Napper Road and Muiriefield Place

 

Show more

Start date: 2 June 2021

 

End date: 9 June 2021

 

Duration: 8.00pm - 5.00am

 

Reason: To facilitate CCTV Manhole camera inspections

north

Water and sewerage

Planned - Water Interruption - Helensvale

Day 2 of 2

Streets affected: HOPE ISLAND ROAD

Cause: Meter replacement

Ref: 1000778145/A66829170

Show more

Start time and date: 10.00pm 2 June 2021
End time and date: 01.00am 3 June 2021

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 1 of 7

Streets affected: Marine Parade (Reduced lanes, bike lane, verge/footpath with traffic control - expect delays) between Rutledge Street and Miles Street

 

 

Show more

Start date: 3 June 2021 

 

End date: 9 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.00pm

 

Reason: To facilitate the installation of a new street light and traffic signal power connection.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 9

Streets affected: Surfers Paradise Boulevard (full road closure with detour/local traffic access only - traffic control onsite) between Ocean Avenue and Pandanus Avenue

 

 

Show more

Start date: 3 June 2021

 

End date: 11 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.30pm

 

Reason: To safely undertake the installation of new loops for traffic signals.

south

Water and sewerage

Planned - Water Interruption - Biggera Waters

9.00am - 2.00pm

Streets affected:  Loder Street

Cause: Replace service valve

Ref: 20672955 /A3791503

north

Water and sewerage

Planned - Water Interruption - Currumbin

9.00am - 2.00pm

Streets affected: Michel Drive

Cause: Watermain connection works

Ref:   60008876/A66784515

all regions

Water and sewerage

Planned - Water Interruption - Luscombe

6.00pm - 11.00pm

Streets affected: Aliciajay Circuit and Stephens Way

 

Cause: Watermain Sutdown

W/O: 52013177

Notif: 1000767013

Objective No: WWS/2021/154

north

 
4 Jun - Friday
Water and sewerage

Unplanned - Water Interruption - Broadbeach Waters

4.30am - 5.30am

Streets affected: Hoy Street

Cause: Repair fire hydrant

Ref: 1000776191

south

Water and sewerage

Unplanned - Water Interruption - Coombabah

5.30am - 7.30am

Streets affected: Shelter Road

Cause: Repair fire hydrant

Ref: 1000778728

north

Water and sewerage

Unplanned - Water Interruption - Mermaid Waters

10.00am - 4.00pm

Streets affected: Helm Court

 

Cause: Repair water service

 

Ref: 1000779458

south

Water and sewerage

Unplanned - Water Interruption - Tallebudgera

11.00am - 1.00pm

Streets affected: Tallabudgera Creek Road, Golden Valley Road, Plaza Street

 

Cause: Repair water service

 

Ref: 1000777761

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 152 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 138 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 134 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 124 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 124 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 117 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 115 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 110 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 102 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 97 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 82 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 79 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 77 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 75 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 68 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 57 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 47 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 47 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 39 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 38 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 31 of 32

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Yawalpah Road Overpass and Foxwell Road

Show more

Start date: 5 May 2021

End date: 5 June 2021

Duration: 6:30am – 3pm

Reason: To facilitate construction of turning lane into depot - including tree clearing

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 31 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 26 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 26 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 23 of 24

Streets affected: Ascot Court (full road closure local traffic access only) between Racecourse Drive and End of road

Show more

Start date: 13 May 2021

End date: 5 June 2021

Duration: 6am – 6pm

Reason: To facilitate delivery of horses / livestock for the Magic Millions sales

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 23 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 22 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 19 of 22

Streets affected: Petrie Street (half road closure with traffic control – expect delays) between Marine Parade and Eden Avenue

 

 

Show more

Start date: 17 May 2021

 

End date: 7 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Energex works

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 18 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 17 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 17 of 18

Streets affected: Halfway Drive (Half road closure with traffic control – expect delays) between Citrinus Court and Conebush Circuit

 

Also affected: Doolan Street

 

Show more

Start date: 19 May 2021

 

End date: 5 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday) 

 

Reason: Install coloured surfacing works on behalf of CoGC

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 16 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 16 of 17

Streets affected: Upper Ormeau Road (Half road closure – expect delays) between Cliff Barrons Road and Hideaway Road

 

Show more

Start date: 20 May 2021

 

End date: 5 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Laying of stormwater pipe across the road.

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 16 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 12 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 11 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 12 of 12

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Archer Street and Musgrave Street

 

Also affected: Lang Street

 

Show more

Start date: 24 May 2021

 

End date: 4 June 2021

 

Duration: 6.30am - 3.00pm

 

Reason: Installation of pram ramps for new pedestrian crossing.

 

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 11 of 15

Streets affected: Observatory Drive (half road closure with traffic control – expect delays) between Golden Grove Boulevard and Gordonia Drive

 

 

Show more

Start date: 25 May 2021

 

End date: 8 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Excavation and resurfacing works

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 11 of 16

Streets affected: Moana Park Avenue (half road closure with traffic control – expect delays) between Kalimna Drive and End of road

 

 

Show more

Start date: 25 May 2021

 

End date: 9 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate works to sewer main and stormwater.

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 9 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 8 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 8 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 8 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 8 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 8 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 8 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 6 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 5 of 5

Streets affected: Dutton Street (half road closure with detour - traffic control on site) between Lanham Street and Tweed Street

Show more

Start date: 31 May 2021

End date: 4 June 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate dismantling of Tower Crane

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 5 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 5 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 5 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 4 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 10

Streets affected: Kumbari Avenue (half road closure with traffic control – expect delays) between Nakina Street and Musgrave Avenue

 

Also affected: Nakina Street

Show more

Start date: 2 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of coloured surfacing works.

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 3 of 22

Streets affected: Helensvale Road (half road closure with traffic control, verge/footpath – expect delays) between Siganto Drive and Shepparton Road

 

Also affected: Siganto Drive

 

 

Show more

Start date: 2 June 2021

 

End date: 23 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: Install a new signal pole.

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 3 of 8

Streets affected: Allied Drive (half road closure with detour and traffic control – expect delays) between Napper Road and Muiriefield Place

 

Show more

Start date: 2 June 2021

 

End date: 9 June 2021

 

Duration: 8.00pm - 5.00am

 

Reason: To facilitate CCTV Manhole camera inspections

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 2 of 7

Streets affected: Marine Parade (Reduced lanes, bike lane, verge/footpath with traffic control - expect delays) between Rutledge Street and Miles Street

 

 

Show more

Start date: 3 June 2021 

 

End date: 9 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.00pm

 

Reason: To facilitate the installation of a new street light and traffic signal power connection.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 9

Streets affected: Surfers Paradise Boulevard (full road closure with detour/local traffic access only - traffic control onsite) between Ocean Avenue and Pandanus Avenue

 

 

Show more

Start date: 3 June 2021

 

End date: 11 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.30pm

 

Reason: To safely undertake the installation of new loops for traffic signals.

south

Water and sewerage

Planned - Water Interruption - Ashmore

1.00am - 5.00am

Streets affected:  EDMUND RICE DRIVE

Cause: Meter replacement

Ref: 20663794 /A3791503

north

Road closures

Planned - Temporary Road Closure - Coolangatta

6.30am - 4.00pm

Streets affected: Lord Street (full road closure with traffic control – expect delays) between Winston Street and Musgrave Street

 

Show more

Start date: 4 June 2021

 

End date: 4 June 2021

 

Duration: 6.30am - 4.00pm

 

Reason: Facilitate the crane dismantle.

 

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 1 of 4

Streets affected: Heathwood Drive (shoulder closure with speed reduced) near Koala Town Road

 

Show more

Start date: 4 June 2021

 

End date: 7 June 2021

 

Duration: 7.00am - 4.10pm

 

Reason: Emergency works due to a water leak.  Please drive to conditions and be alert for workers adjacent to the road.

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 1 of 15

Streets affected: Nielsens Road (reduced lanes with traffic control - expect delays) between Hickey Way and Nerang Broadbeach Road

 

Also affected: Meadow View Drive

 

Show more

Start date: 4 June 2021

 

End date: 18 June 2021

 

Duration: 9.00am - 2.00pm

 

Reason: Pavement crack sealing works.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 0 of 62

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Show more

Start date:4 June 2021

End date: 5 August 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 1 of 27

Streets affected: Ashmore Road (half road closure with detour and traffic control, parking lane, bike lane – expect delays) between Currumburra Road and Carrara Street

 

Also affected: Willamulka Avenue (half road) / Boree Street, Heeb Street, Tambourah Drive, Mediterranean Drive (full road) / Benowa Road (reduced lane) - local traffic access only

Show more

Start date: 4 June 2021

 

End date: 30 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation, road resurfacing- asphalting.

 

north

 
5 Jun - Saturday
Water and sewerage

Unplanned - Water Interruption - Palm Beach

5.15pm - 6.15pm

Streets affected: Laguna Avenue

Cause: Repair water service

Ref: 1000779902

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 153 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 139 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 135 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 125 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 125 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 118 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 116 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 111 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 103 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 98 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 83 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 80 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 78 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 76 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 69 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 58 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 48 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 48 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 40 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 39 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 32 of 32

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Yawalpah Road Overpass and Foxwell Road

Show more

Start date: 5 May 2021

End date: 5 June 2021

Duration: 6:30am – 3pm

Reason: To facilitate construction of turning lane into depot - including tree clearing

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 32 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 27 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 27 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 24 of 24

Streets affected: Ascot Court (full road closure local traffic access only) between Racecourse Drive and End of road

Show more

Start date: 13 May 2021

End date: 5 June 2021

Duration: 6am – 6pm

Reason: To facilitate delivery of horses / livestock for the Magic Millions sales

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 24 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 23 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 20 of 22

Streets affected: Petrie Street (half road closure with traffic control – expect delays) between Marine Parade and Eden Avenue

 

 

Show more

Start date: 17 May 2021

 

End date: 7 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Energex works

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 19 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 18 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 18 of 18

Streets affected: Halfway Drive (Half road closure with traffic control – expect delays) between Citrinus Court and Conebush Circuit

 

Also affected: Doolan Street

 

Show more

Start date: 19 May 2021

 

End date: 5 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday) 

 

Reason: Install coloured surfacing works on behalf of CoGC

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 17 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 17 of 17

Streets affected: Upper Ormeau Road (Half road closure – expect delays) between Cliff Barrons Road and Hideaway Road

 

Show more

Start date: 20 May 2021

 

End date: 5 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Laying of stormwater pipe across the road.

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 17 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 13 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 12 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 12 of 15

Streets affected: Observatory Drive (half road closure with traffic control – expect delays) between Golden Grove Boulevard and Gordonia Drive

 

 

Show more

Start date: 25 May 2021

 

End date: 8 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Excavation and resurfacing works

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 12 of 16

Streets affected: Moana Park Avenue (half road closure with traffic control – expect delays) between Kalimna Drive and End of road

 

 

Show more

Start date: 25 May 2021

 

End date: 9 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate works to sewer main and stormwater.

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 10 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 9 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 9 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 9 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 9 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 9 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 9 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 7 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 6 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 6 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 6 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 5 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 10

Streets affected: Kumbari Avenue (half road closure with traffic control – expect delays) between Nakina Street and Musgrave Avenue

 

Also affected: Nakina Street

Show more

Start date: 2 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of coloured surfacing works.

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 4 of 22

Streets affected: Helensvale Road (half road closure with traffic control, verge/footpath – expect delays) between Siganto Drive and Shepparton Road

 

Also affected: Siganto Drive

 

 

Show more

Start date: 2 June 2021

 

End date: 23 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: Install a new signal pole.

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 4 of 8

Streets affected: Allied Drive (half road closure with detour and traffic control – expect delays) between Napper Road and Muiriefield Place

 

Show more

Start date: 2 June 2021

 

End date: 9 June 2021

 

Duration: 8.00pm - 5.00am

 

Reason: To facilitate CCTV Manhole camera inspections

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 3 of 7

Streets affected: Marine Parade (Reduced lanes, bike lane, verge/footpath with traffic control - expect delays) between Rutledge Street and Miles Street

 

 

Show more

Start date: 3 June 2021 

 

End date: 9 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.00pm

 

Reason: To facilitate the installation of a new street light and traffic signal power connection.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 9

Streets affected: Surfers Paradise Boulevard (full road closure with detour/local traffic access only - traffic control onsite) between Ocean Avenue and Pandanus Avenue

 

 

Show more

Start date: 3 June 2021

 

End date: 11 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.30pm

 

Reason: To safely undertake the installation of new loops for traffic signals.

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 2 of 4

Streets affected: Heathwood Drive (shoulder closure with speed reduced) near Koala Town Road

 

Show more

Start date: 4 June 2021

 

End date: 7 June 2021

 

Duration: 7.00am - 4.10pm

 

Reason: Emergency works due to a water leak.  Please drive to conditions and be alert for workers adjacent to the road.

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 2 of 15

Streets affected: Nielsens Road (reduced lanes with traffic control - expect delays) between Hickey Way and Nerang Broadbeach Road

 

Also affected: Meadow View Drive

 

Show more

Start date: 4 June 2021

 

End date: 18 June 2021

 

Duration: 9.00am - 2.00pm

 

Reason: Pavement crack sealing works.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 1 of 62

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Show more

Start date:4 June 2021

End date: 5 August 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 2 of 27

Streets affected: Ashmore Road (half road closure with detour and traffic control, parking lane, bike lane – expect delays) between Currumburra Road and Carrara Street

 

Also affected: Willamulka Avenue (half road) / Boree Street, Heeb Street, Tambourah Drive, Mediterranean Drive (full road) / Benowa Road (reduced lane) - local traffic access only

Show more

Start date: 4 June 2021

 

End date: 30 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation, road resurfacing- asphalting.

 

north

 
6 Jun - Sunday
Water and sewerage

Unplanned - Water Interruption - Highland Park

9.45am - 1.45pm

Streets affected: Lytham Court

Cause: Repair water main

Ref: 1000779912

south

Water and sewerage

Unplanned - Water Interruption - Mermaid Waters

10.00am - 12.00pm

Streets affected: Helm Court

Cause: Repair water service

Ref: 1000779918

south

Water and sewerage

Unplanned - Water Interruption - Burleigh Heads

12.00pm - 1.00pm

Streets affected: Greg Chappell Drive

Cause: Repair water service

Ref: 1000773932

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 154 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 140 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 136 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 126 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 126 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 119 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 117 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 112 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 104 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 99 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 84 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 81 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 79 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 77 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 70 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 59 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 49 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 49 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 41 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 40 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 33 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 28 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 28 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 25 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 24 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 21 of 22

Streets affected: Petrie Street (half road closure with traffic control – expect delays) between Marine Parade and Eden Avenue

 

 

Show more

Start date: 17 May 2021

 

End date: 7 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Energex works

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 20 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 19 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 18 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 18 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 14 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 13 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 13 of 15

Streets affected: Observatory Drive (half road closure with traffic control – expect delays) between Golden Grove Boulevard and Gordonia Drive

 

 

Show more

Start date: 25 May 2021

 

End date: 8 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Excavation and resurfacing works

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 13 of 16

Streets affected: Moana Park Avenue (half road closure with traffic control – expect delays) between Kalimna Drive and End of road

 

 

Show more

Start date: 25 May 2021

 

End date: 9 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate works to sewer main and stormwater.

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 11 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 10 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 10 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 10 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 10 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 10 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 10 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 8 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 7 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 7 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 7 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 6 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 10

Streets affected: Kumbari Avenue (half road closure with traffic control – expect delays) between Nakina Street and Musgrave Avenue

 

Also affected: Nakina Street

Show more

Start date: 2 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of coloured surfacing works.

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 5 of 22

Streets affected: Helensvale Road (half road closure with traffic control, verge/footpath – expect delays) between Siganto Drive and Shepparton Road

 

Also affected: Siganto Drive

 

 

Show more

Start date: 2 June 2021

 

End date: 23 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: Install a new signal pole.

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 5 of 8

Streets affected: Allied Drive (half road closure with detour and traffic control – expect delays) between Napper Road and Muiriefield Place

 

Show more

Start date: 2 June 2021

 

End date: 9 June 2021

 

Duration: 8.00pm - 5.00am

 

Reason: To facilitate CCTV Manhole camera inspections

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 4 of 7

Streets affected: Marine Parade (Reduced lanes, bike lane, verge/footpath with traffic control - expect delays) between Rutledge Street and Miles Street

 

 

Show more

Start date: 3 June 2021 

 

End date: 9 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.00pm

 

Reason: To facilitate the installation of a new street light and traffic signal power connection.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 9

Streets affected: Surfers Paradise Boulevard (full road closure with detour/local traffic access only - traffic control onsite) between Ocean Avenue and Pandanus Avenue

 

 

Show more

Start date: 3 June 2021

 

End date: 11 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.30pm

 

Reason: To safely undertake the installation of new loops for traffic signals.

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 3 of 4

Streets affected: Heathwood Drive (shoulder closure with speed reduced) near Koala Town Road

 

Show more

Start date: 4 June 2021

 

End date: 7 June 2021

 

Duration: 7.00am - 4.10pm

 

Reason: Emergency works due to a water leak.  Please drive to conditions and be alert for workers adjacent to the road.

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 3 of 15

Streets affected: Nielsens Road (reduced lanes with traffic control - expect delays) between Hickey Way and Nerang Broadbeach Road

 

Also affected: Meadow View Drive

 

Show more

Start date: 4 June 2021

 

End date: 18 June 2021

 

Duration: 9.00am - 2.00pm

 

Reason: Pavement crack sealing works.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 2 of 62

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Show more

Start date:4 June 2021

End date: 5 August 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 3 of 27

Streets affected: Ashmore Road (half road closure with detour and traffic control, parking lane, bike lane – expect delays) between Currumburra Road and Carrara Street

 

Also affected: Willamulka Avenue (half road) / Boree Street, Heeb Street, Tambourah Drive, Mediterranean Drive (full road) / Benowa Road (reduced lane) - local traffic access only

Show more

Start date: 4 June 2021

 

End date: 30 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation, road resurfacing- asphalting.

 

north

 
7 Jun - Monday
Water and sewerage

Unplanned - Water Interruption - Currumbin Waters

8.55am - 10.00am

Streets affected: Elizabeth Street

 

Cause: Repair water service

 

Ref: 1000778344

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 155 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 141 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 137 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 127 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 127 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 120 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 118 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 113 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 105 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 100 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 85 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 82 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 80 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 78 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 71 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 60 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 50 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 50 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 42 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 41 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 34 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 29 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 29 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 26 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 25 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 22 of 22

Streets affected: Petrie Street (half road closure with traffic control – expect delays) between Marine Parade and Eden Avenue

 

 

Show more

Start date: 17 May 2021

 

End date: 7 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Energex works

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 21 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 20 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 19 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 19 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 15 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 14 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 14 of 15

Streets affected: Observatory Drive (half road closure with traffic control – expect delays) between Golden Grove Boulevard and Gordonia Drive

 

 

Show more

Start date: 25 May 2021

 

End date: 8 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Excavation and resurfacing works

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 14 of 16

Streets affected: Moana Park Avenue (half road closure with traffic control – expect delays) between Kalimna Drive and End of road

 

 

Show more

Start date: 25 May 2021

 

End date: 9 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate works to sewer main and stormwater.

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 12 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 11 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 11 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 11 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 11 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 11 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 11 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 9 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 8 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 8 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 8 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 7 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Road closures

Planned - Temporary Road Closure - Southport

Day 7 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 10

Streets affected: Kumbari Avenue (half road closure with traffic control – expect delays) between Nakina Street and Musgrave Avenue

 

Also affected: Nakina Street

Show more

Start date: 2 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of coloured surfacing works.

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 6 of 22

Streets affected: Helensvale Road (half road closure with traffic control, verge/footpath – expect delays) between Siganto Drive and Shepparton Road

 

Also affected: Siganto Drive

 

 

Show more

Start date: 2 June 2021

 

End date: 23 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: Install a new signal pole.

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 6 of 8

Streets affected: Allied Drive (half road closure with detour and traffic control – expect delays) between Napper Road and Muiriefield Place

 

Show more

Start date: 2 June 2021

 

End date: 9 June 2021

 

Duration: 8.00pm - 5.00am

 

Reason: To facilitate CCTV Manhole camera inspections

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 5 of 7

Streets affected: Marine Parade (Reduced lanes, bike lane, verge/footpath with traffic control - expect delays) between Rutledge Street and Miles Street

 

 

Show more

Start date: 3 June 2021 

 

End date: 9 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.00pm

 

Reason: To facilitate the installation of a new street light and traffic signal power connection.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 9

Streets affected: Surfers Paradise Boulevard (full road closure with detour/local traffic access only - traffic control onsite) between Ocean Avenue and Pandanus Avenue

 

 

Show more

Start date: 3 June 2021

 

End date: 11 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.30pm

 

Reason: To safely undertake the installation of new loops for traffic signals.

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 4 of 4

Streets affected: Heathwood Drive (shoulder closure with speed reduced) near Koala Town Road

 

Show more

Start date: 4 June 2021

 

End date: 7 June 2021

 

Duration: 7.00am - 4.10pm

 

Reason: Emergency works due to a water leak.  Please drive to conditions and be alert for workers adjacent to the road.

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 4 of 15

Streets affected: Nielsens Road (reduced lanes with traffic control - expect delays) between Hickey Way and Nerang Broadbeach Road

 

Also affected: Meadow View Drive

 

Show more

Start date: 4 June 2021

 

End date: 18 June 2021

 

Duration: 9.00am - 2.00pm

 

Reason: Pavement crack sealing works.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 3 of 62

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Show more

Start date:4 June 2021

End date: 5 August 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 4 of 27

Streets affected: Ashmore Road (half road closure with detour and traffic control, parking lane, bike lane – expect delays) between Currumburra Road and Carrara Street

 

Also affected: Willamulka Avenue (half road) / Boree Street, Heeb Street, Tambourah Drive, Mediterranean Drive (full road) / Benowa Road (reduced lane) - local traffic access only

Show more

Start date: 4 June 2021

 

End date: 30 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation, road resurfacing- asphalting.

 

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 1 of 8

Streets affected: Citron Crescent (half road closure with detour and traffic control) between Lime Street and Emerald Drive

 

Show more

Start date: 7 June 2021

 

End date: 14 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate directional drilling and trenching

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 1 of 33

Streets affected: Yellowwood Road (half road closure with traffic control) between Quinns Hill Road West and Stapylton Jacobs Well Road

 

Show more

Start date: 7 June 2021

 

End date: 9 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Replacement culvert works

 

north

Water and sewerage

Planned - Water Interruption - Mudgeeraba

7.00am - 9.00am

Streets affected: 30 Mudgeeraba Road

Cause: Meter replacement

W/O: 52013259

Notif: 1000776494

Objective No: A66733827

south

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 7

Streets affected: Drury Avenue (full road closure with traffic control – expect delays) Benowa Road and Ferry Road

 

Show more

Start date: 7 June 2021

 

End date: 13 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 5.00pm

 

Reason: Micro-surfacing treatment of the road pavement. 

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 1 of 7

Streets affected: Colman Road (half road closure with traffic control – expect delays) between Ragamuffin Drive East and End of Road

 

Also affected: Josephine Lane

 

 

Show more

Start date: 7 June 2021

 

End date: 13 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 5.00pm

 

Reason: Micro-surfacing treatment of the road pavement. 

north

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area

Day 1 of 12

Areas affected: Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Areas Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area over the period from 7.00am on Monday 7 June 2021 to 11.59pm Friday 18 June 2021.

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Water and sewerage

Planned - Water Interruption - Carrara

9.00am - 11.00am

Streets affected: 100 Eastlake Street

Cause: Watermain Shutdown

W/O: 52013234

Notif: 1000776539

Objective No: A66733386

south

Water and sewerage

Planned - Water Interruption - Carrara

11.00am - 1.00pm

Streets affected: 14 Spall Street

Cause: Water meter replacement

W/O: 52013260

Notif: 1000776518

Objective No: A66733331

south

 
8 Jun - Tuesday
Water and sewerage

Unplanned - Water Interruption - Tallai

9.15am - 10.15am

Streets affected: Valhalla Court, Xanadu Court, Coralcoast Drive, Waterfall Way, Seascape Court

Cause: Repair hydrant

Ref: 1000736287

south

Water and sewerage

Unplanned - Water Interruption - Robina

9.50am - 10.50am

Streets affected: Federal Place, Tea Gardens Place

Cause: Repair water service

Ref: 1000778346

south

Water and sewerage

Unplanned - Water Interruption - Benowa

10.00am - 10.30am

Streets affected: Canara Street

Cause: Repair water service

Ref: 1000779796

central

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 156 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 142 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 138 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 128 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 128 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 121 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 119 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 114 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 106 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 101 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 86 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 83 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 81 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 79 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 72 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 61 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 51 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 51 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 43 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 42 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 35 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 30 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 30 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 27 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 26 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 22 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 21 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 20 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 20 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 16 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 15 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 15 of 15

Streets affected: Observatory Drive (half road closure with traffic control – expect delays) between Golden Grove Boulevard and Gordonia Drive

 

 

Show more

Start date: 25 May 2021

 

End date: 8 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Excavation and resurfacing works

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 15 of 16

Streets affected: Moana Park Avenue (half road closure with traffic control – expect delays) between Kalimna Drive and End of road

 

 

Show more

Start date: 25 May 2021

 

End date: 9 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate works to sewer main and stormwater.

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 13 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 12 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 12 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 12 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 12 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 12 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 12 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 10 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 9 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 9 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 9 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 8 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Road closures

Planned - Temporary Road Closure - Southport

Day 8 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 7 of 10

Streets affected: Kumbari Avenue (half road closure with traffic control – expect delays) between Nakina Street and Musgrave Avenue

 

Also affected: Nakina Street

Show more

Start date: 2 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of coloured surfacing works.

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 7 of 22

Streets affected: Helensvale Road (half road closure with traffic control, verge/footpath – expect delays) between Siganto Drive and Shepparton Road

 

Also affected: Siganto Drive

 

 

Show more

Start date: 2 June 2021

 

End date: 23 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: Install a new signal pole.

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 7 of 8

Streets affected: Allied Drive (half road closure with detour and traffic control – expect delays) between Napper Road and Muiriefield Place

 

Show more

Start date: 2 June 2021

 

End date: 9 June 2021

 

Duration: 8.00pm - 5.00am

 

Reason: To facilitate CCTV Manhole camera inspections

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 6 of 7

Streets affected: Marine Parade (Reduced lanes, bike lane, verge/footpath with traffic control - expect delays) between Rutledge Street and Miles Street

 

 

Show more

Start date: 3 June 2021 

 

End date: 9 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.00pm

 

Reason: To facilitate the installation of a new street light and traffic signal power connection.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 9

Streets affected: Surfers Paradise Boulevard (full road closure with detour/local traffic access only - traffic control onsite) between Ocean Avenue and Pandanus Avenue

 

 

Show more

Start date: 3 June 2021

 

End date: 11 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.30pm

 

Reason: To safely undertake the installation of new loops for traffic signals.

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 5 of 15

Streets affected: Nielsens Road (reduced lanes with traffic control - expect delays) between Hickey Way and Nerang Broadbeach Road

 

Also affected: Meadow View Drive

 

Show more

Start date: 4 June 2021

 

End date: 18 June 2021

 

Duration: 9.00am - 2.00pm

 

Reason: Pavement crack sealing works.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 4 of 62

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Show more

Start date:4 June 2021

End date: 5 August 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 5 of 27

Streets affected: Ashmore Road (half road closure with detour and traffic control, parking lane, bike lane – expect delays) between Currumburra Road and Carrara Street

 

Also affected: Willamulka Avenue (half road) / Boree Street, Heeb Street, Tambourah Drive, Mediterranean Drive (full road) / Benowa Road (reduced lane) - local traffic access only

Show more

Start date: 4 June 2021

 

End date: 30 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation, road resurfacing- asphalting.

 

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 2 of 8

Streets affected: Citron Crescent (half road closure with detour and traffic control) between Lime Street and Emerald Drive

 

Show more

Start date: 7 June 2021

 

End date: 14 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate directional drilling and trenching

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 2 of 33

Streets affected: Yellowwood Road (half road closure with traffic control) between Quinns Hill Road West and Stapylton Jacobs Well Road

 

Show more

Start date: 7 June 2021

 

End date: 9 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Replacement culvert works

 

north

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 7

Streets affected: Drury Avenue (full road closure with traffic control – expect delays) Benowa Road and Ferry Road

 

Show more

Start date: 7 June 2021

 

End date: 13 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 5.00pm

 

Reason: Micro-surfacing treatment of the road pavement. 

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 2 of 7

Streets affected: Colman Road (half road closure with traffic control – expect delays) between Ragamuffin Drive East and End of Road

 

Also affected: Josephine Lane

 

 

Show more

Start date: 7 June 2021

 

End date: 13 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 5.00pm

 

Reason: Micro-surfacing treatment of the road pavement. 

north

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area

Day 2 of 12

Areas affected: Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Areas Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area over the period from 7.00am on Monday 7 June 2021 to 11.59pm Friday 18 June 2021.

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 4

Streets affected: Wharf Road (full road closure with traffic control – expect delays) between Old Burleigh Road and Beach end of Street

 

Show more

Start date: 8 June 2021

 

End date: 11 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Crane lifting works associated with the development site.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 5

Streets affected: George Street (full road closure with traffic control – expect delays) between Johnston Street and Smith Street

 

Show more

Start date: 8 June 2021

 

End date: 12 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate tower crane installation.

north

Water and sewerage

Planned - Water Interruption - Carrara

9.00am - 11.00am

Streets affected: 20 Tara Terrace

Cause: Water meter replacement

W/O: 52013261

Notif: 1000776557

Objective no: A66733617

south

Water and sewerage

Planned - Water Interruption - Carrara

11.00am - 1.00pm

Streets affected: Tara Terrace

Cause: Meter replacement

Ref: 1000776544 / A66733201

south

Water and sewerage

Planned - Water Interruption - Carrara

11.00am - 1.00pm

Streets affected: 11 Tara Terrace

Cause: Water meter replacement

W/O: 52013235

Notif: 1000776544

Objective No: A66733201

south

 
9 Jun - Wednesday
Water and sewerage

Unplanned - Water Interruption - Currumbin

9.00am - 3.00pm

Streets affected: Michel Avenue

Cause: Repair water main

Ref: 1000724635

south

Water and sewerage

Unplanned - Water Interruption - Southport

11.30am - 12.30pm

Streets affected: Woomera Crescent

Cause: Repair water service

Ref: 1000779833

north

Water and sewerage

Unplanned - Water Interruption - Palm Beach

2.30pm - 4.30pm

Streets affected: Tahiti Avenue, Calga Court

Cause: Repair water main

Ref: 1000780434

south

Water and sewerage

Unplanned - Water Interruption - Oxenfod

2.40pm - 3.40pm

Streets affected: Campaspie Court, Ruth Terraca

Cause: Repair water service

Ref: 1000768655

north

Water and sewerage

Unplanned - Water Interruption - Nerang

5.00pm - 7.00pm

Streets affected: Saxon Court

Cause: Repair water main

Ref: 1000780874

central

Water and sewerage

Unplanned - Water Interruption - Nerang

8.00pm - 10.00pm

Streets affected: Coleridge Court

Cause: Repair fire hydrant

Ref: 1000780992

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 157 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 143 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 139 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 129 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 129 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 122 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 120 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 115 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 107 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 102 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 87 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 84 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 82 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 80 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 73 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 62 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 52 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 52 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 44 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 43 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 36 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 31 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 31 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 28 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 27 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 23 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 22 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 21 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 21 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 17 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 16 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 16 of 16

Streets affected: Moana Park Avenue (half road closure with traffic control – expect delays) between Kalimna Drive and End of road

 

 

Show more

Start date: 25 May 2021

 

End date: 9 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate works to sewer main and stormwater.

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 14 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 13 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 13 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 13 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 13 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 13 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 13 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 11 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 10 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 10 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 10 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 9 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Road closures

Planned - Temporary Road Closure - Southport

Day 9 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 8 of 10

Streets affected: Kumbari Avenue (half road closure with traffic control – expect delays) between Nakina Street and Musgrave Avenue

 

Also affected: Nakina Street

Show more

Start date: 2 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of coloured surfacing works.

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 8 of 22

Streets affected: Helensvale Road (half road closure with traffic control, verge/footpath – expect delays) between Siganto Drive and Shepparton Road

 

Also affected: Siganto Drive

 

 

Show more

Start date: 2 June 2021

 

End date: 23 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: Install a new signal pole.

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 8 of 8

Streets affected: Allied Drive (half road closure with detour and traffic control – expect delays) between Napper Road and Muiriefield Place

 

Show more

Start date: 2 June 2021

 

End date: 9 June 2021

 

Duration: 8.00pm - 5.00am

 

Reason: To facilitate CCTV Manhole camera inspections

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 7 of 7

Streets affected: Marine Parade (Reduced lanes, bike lane, verge/footpath with traffic control - expect delays) between Rutledge Street and Miles Street

 

 

Show more

Start date: 3 June 2021 

 

End date: 9 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.00pm

 

Reason: To facilitate the installation of a new street light and traffic signal power connection.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 9

Streets affected: Surfers Paradise Boulevard (full road closure with detour/local traffic access only - traffic control onsite) between Ocean Avenue and Pandanus Avenue

 

 

Show more

Start date: 3 June 2021

 

End date: 11 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.30pm

 

Reason: To safely undertake the installation of new loops for traffic signals.

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 6 of 15

Streets affected: Nielsens Road (reduced lanes with traffic control - expect delays) between Hickey Way and Nerang Broadbeach Road

 

Also affected: Meadow View Drive

 

Show more

Start date: 4 June 2021

 

End date: 18 June 2021

 

Duration: 9.00am - 2.00pm

 

Reason: Pavement crack sealing works.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 5 of 62

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Show more

Start date:4 June 2021

End date: 5 August 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 6 of 27

Streets affected: Ashmore Road (half road closure with detour and traffic control, parking lane, bike lane – expect delays) between Currumburra Road and Carrara Street

 

Also affected: Willamulka Avenue (half road) / Boree Street, Heeb Street, Tambourah Drive, Mediterranean Drive (full road) / Benowa Road (reduced lane) - local traffic access only

Show more

Start date: 4 June 2021

 

End date: 30 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation, road resurfacing- asphalting.

 

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 3 of 8

Streets affected: Citron Crescent (half road closure with detour and traffic control) between Lime Street and Emerald Drive

 

Show more

Start date: 7 June 2021

 

End date: 14 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate directional drilling and trenching

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 3 of 33

Streets affected: Yellowwood Road (half road closure with traffic control) between Quinns Hill Road West and Stapylton Jacobs Well Road

 

Show more

Start date: 7 June 2021

 

End date: 9 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Replacement culvert works

 

north

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 7

Streets affected: Drury Avenue (full road closure with traffic control – expect delays) Benowa Road and Ferry Road

 

Show more

Start date: 7 June 2021

 

End date: 13 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 5.00pm

 

Reason: Micro-surfacing treatment of the road pavement. 

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 3 of 7

Streets affected: Colman Road (half road closure with traffic control – expect delays) between Ragamuffin Drive East and End of Road

 

Also affected: Josephine Lane

 

 

Show more

Start date: 7 June 2021

 

End date: 13 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 5.00pm

 

Reason: Micro-surfacing treatment of the road pavement. 

north

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area

Day 3 of 12

Areas affected: Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Areas Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area over the period from 7.00am on Monday 7 June 2021 to 11.59pm Friday 18 June 2021.

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 4

Streets affected: Wharf Road (full road closure with traffic control – expect delays) between Old Burleigh Road and Beach end of Street

 

Show more

Start date: 8 June 2021

 

End date: 11 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Crane lifting works associated with the development site.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 5

Streets affected: George Street (full road closure with traffic control – expect delays) between Johnston Street and Smith Street

 

Show more

Start date: 8 June 2021

 

End date: 12 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate tower crane installation.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

6.00am - 8.00am

Streets affected: Cavill Avenue (full road closure with detour in place - traffic control onsite) between Ferny Avenue and Orchid Avenue

 

Also affected: Surfers Paradise Boulevard (Northbound only)

 

 

 

Show more

Start date: 9 June 2021

 

End date: 9 June 2021

 

Duration: 6.00am - 8.00am

 

Reason: To facilitate removal of Exeloo Galaxy toilet.

 

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 1 of 3

Streets affected: Petrie Street (full road closure with traffic control – expect delays) between Eden Avenue and Marine Parade

 

 

Show more

Start date: 9 June 2021

 

End date: 11 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Placement of crane to hoist excavators from site

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

8.45am - 2.45pm

Streets affected: All streeets around Greg Cappell Drive William Banls and Calabro Way

Cause: No water suspected break in main

Ref: 1000780659

south

Water and sewerage

Planned - Water Interruption - Biggera Waters

9.00am - 3.00pm

Streets affected: Brisbane Road

Cause: Meter replacement

Ref:   1000779117/A66964812

north

Water and sewerage

Planned - Water Interruption - Nerang

9.00am - 11.00am

Streets affected:  Paradise Street

Cause: Meter replacement

Ref:   1000779172/A66965433

north

Water and sewerage

Planned - Water Interruption - Tallai

9.00am - 2.00pm

Streets affected: Tallai Road and Duchess Court

Cause: Watermain shutdown

Ref: 1000778003/A66977323

all regions

Water and sewerage

Planned - Water Interruption - Coolangatta

9.00am - 2.00pm

Streets affected: Eden Avenue

Cause: Water main works

Ref: 1000778282

 

 

south

Water and sewerage

Planned - Water Interruption - Southport

11.00am - 1.00pm

Streets affected: Pinter Drive

Cause: Meter replacement

Ref:   1000779182/A66965616

north

Water and sewerage

Planned - Water Interruption - Southport

1.00pm - 3.00pm

Streets affected: North Street

Cause: Meter replacement

Ref:   1000779162/A66965274

all regions

Water and sewerage

Planned - Water Interruption - Southport

1.00pm - 3.00pm

Streets affected: North Street

Cause: Meter replacement

Ref:   1000779162/A66965274

all regions

 
10 Jun - Thursday
Water and sewerage

Unplanned - Water Interruption - Molendinar

9.00am - 11.10am

Streets affected: Watford Crescent, Macquarie Avenue

Cause: Repair water main

Ref: 1000780487

central

Water and sewerage

Unplanned - Water Interruption - Tugun

9.30am - 12.30pm

Streets affected: Mirreen Drive, Boolara Court, Coolamon Court, Elowra Court

Cause: Repair water main

Ref: 1000781016

south

Water and sewerage

Unplanned - Water Interruption - Nerang

Day 1 of 2

Streets affected: Miskin Street, Batten Street

Cause: Repair water main

Ref: 1000781337

Show more

Start time and date: 06.00pm 10 June 2021
End time and date: 02.00am 11 June 2021

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 158 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 144 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 140 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 130 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 130 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 123 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 121 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 116 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 108 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 103 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 88 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 85 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 83 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 81 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 74 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 63 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 53 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 53 of 62

Streets affected: Golden Four Drive (Reduced lanes with traffic control/Footpath – expect delays) between Lang Street and Pacific Parade

 

Also affected:  Coolangatta Road

 

 

Show more

Start date: 19 April 2021

 

End date: 19 June 2021

 

Duration: 6.30am - 6.30pm (Footpath 12.00am-11.59pm)

 

Reason: Assembly of awning, roofing and gutters and construction of footpath for development

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 45 of 92

Streets affected: Sheehan Avenue (half road closure with traffic control – expect delays) between Sickle Avenue and Nelson Avenue

Show more

Also affected: Harbour Rise and Hammock Place

Start date: 27 April 2021

End date: 27 July 2021

Duration: 6:30am – 5pm

Reason: Required for concrete trucks / delivery trucks to stage and reverse onto site and hoisting materials into construction area

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 44 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 28 April 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 37 of 84

Streets affected: Seagull Avenue (half road closure with traffic control – expect delays) between Petrel Avenue and Albatross Avenue

Show more

Start date: 5 May 2021

End date: 27 July 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifting of materials to roof

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 32 of 75

Streets affected: Global Plaza (half road closure with detour - traffic control on site) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration 1: Midnight – 11:59pm (Westbound)

Duration 2: 6:30am – 6:30pm (Eastbound) 

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 32 of 75

Streets affected: Global Plaza (Reduced lanes) between Old Pacific Highway and Leo Graham Way

Show more

Start date: 10 May 2021

End date: 23 July 2021

Duration: 9am – 2:30pm

Reason: To facilitate construction of new right turn lane into Bunnings Warehouse

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 29 of 33

Streets affected: Sickle Avenue (Half road closure with traffic control – expect delays) Pendraat Parade/ Marina Quays Boulevard and Osmium Lane

 

Also affected: Grant Avenue

 

 

Show more

Start date: 13 May 2021

 

End date: 14 June 2021

 

Duration: 9.00am - 2.30pm (Monday to Friday), 6.30am - 6.30pm (Saturday)

 

Reason: Stormwater construction

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 28 of 58

Streets affected: Tillyroen Road (half road closure with traffic control – expect delays) between Ormeau Ridge Road and Mirambeena Drive

 

Also affected: Upper Ormeau Road

 

 

Show more

Date 1:  14 May 2021 - 25 June 2021 (Dayworks) 9.00am - 2.30pm

Date 2:  26 June 2021 - 10 July 2021 (School Holidays) 6.30am - 6.30pm

Date 3:  14 May 2021 - 10 July 2021 (Nightworks) 7.00pm - 5.30am

 

Reason: Signalised Intersection Upgrade

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 24 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Show more

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 23 of 38

Streets affected:  Pacific Parade (Full verge/footpath) between Short Street and Sea Street

 

 

Show more

Start date: 19 May 2021

 

End date: 25 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Full closure to facilitate a safe environment during sea wall construction and Oceanway rectification works.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 22 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Show more

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 22 of 32

Streets affected: Pearson Road (Parking lane/bay, verge/footpath) between Darlington Drive and Alloy Street

 

Also affected: Computer Road

 

Show more

Start date: 20 May 2021

 

End date: 20 June 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Installation of new gas line.

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 18 of 68

Streets affected: Seaworld Drive (Half road with traffic control, full verge/ footpath, parking lane/bay, shoulder, bike lane  – expect delays) between Macarthur Parade and End of Road

 

 

Show more

Start date: 24 May 2021 - Stage 1, 14 June 2021 - Stage 2, 16 June 2021 - Stage 3, 31 May 2021 - Stage 4, 12 July 2021 - Stage 5

 

End date: 15 June 2021 - Stage 1, 18 June 2021 - Stage 2, 25 June 2021 - Stage 3, 25 June 2021 - Stage 4, 30 July 2021 - Stage 5

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate the construction of the Surfers Paradise Sand Backpass Pipeline (Stages 1 to 5).

 

 

 

 

 

south

Road closures

Planned - Temporary Road Closure - Robina

Day 17 of 53

Streets affected: Laver Drive (Verge/Footpath, Reduced lanes with traffic control - expect delays) between Robina Parkway and Riverwalk Avenue

 

Show more

Start date: 24 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (Lanes), 12.00am - 12.00am (Footpath)

 

Reason: To safely install new pedestrian signals and footpath, replace kerb, reseal the road.

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 15 of 32

Streets affected: Lakes Explanade (lane/footpath closure with traffic control – expect delays) between Lakeview Boulevard and Hooker Boulevard

 

 

Show more

Start date: 27 May 2021

 

End date: 27 June 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate asphalt works inside construction site and the main gate entrance.

south

Road closures

Planned - Temporary Road Closure - Robina

Day 14 of 50

Streets affected: Cheltenham Drive (reduced lanes/footpath - expect delays) between Botanique Terrace and Robina Parkway

 

Show more

Start date: 27 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (lane), 12.00am - 12.00am (footpath)

 

Reason: To safely install new pedestrian signals, new footpath, replace kerb and channel plus reseal the road pavement.

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 14 of 17

Streets affected: Clover Hill Drive (half road closure with traffic control) between Somerset Drive and Healy Court/Wyangan Valley Way

 

Also affected: Sara Carrigan Court

Show more

Start date: 27 May 2021

 

End date: 13 June 2021

 

Duration: 6.00pm - 6.00am

 

Reason: Excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 14 of 36

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 28 May 2021

End date: 2 July 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 14 of 32

Streets affected: Brighton Parade (verge/footpath closure with traffic control) between Biggs Place and Acqua Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30 - 6.30pm

 

Reason: Concrete Pour

south

Road closures

Planned - Temporary Road Closure - Alberton

Day 14 of 37

Streets affected: Alberton Road (half road closure/footpath with traffic control – expect delays) between Marlowe Road and Zipfs Road

 

Show more

Start date: 28 May 2021

 

End date: 3 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Installation of stormwater and headwalls across Alberton Road.

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 14 of 32

Streets affected: Hill Avenue (verge/footpath) between Mount Street and West Street

 

Show more

Start date: 28 May 2021

 

End date: 28 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate excavation and construction works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 12 of 12

Streets affected: Sara Avenue and Andrew Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Sophie Avenue

 

 

Show more

Start date: 30 May 2021

 

End date: 10 June 2021 (Contingency dates in place)

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 11 of 11

Streets affected: Sara Avenue (full road closure with traffic control – expect delays) between Bermuda Street and End of Road

 

Also affected: Andrew Avenue and Sophie Avenue

Show more

Start date: 31 May 2021

 

End date: 10 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate excavation and resurfacing of the road surface.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 11 of 47

Streets affected: Hinkler Drive (reduced lanes/footpath with traffic control – expect delays) between San Fernando Drive and Elysium Drive

 

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

 

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 11 of 47

Streets affected: Mudgeeraba Road (reduced lanes/footpath/bike lane with traffic control - expect delays) between Quambone Street and Gooding Drive

 

Also affected: Hinkler Drive, Pacific Motorway (M1) off ramp

Show more

Start date: 31 May 2021

 

End date: 16 July 2021

 

Duration: 9.00am - 2.30pm (School Days), 6.30am - 5.00pm (Saturdays & School Holidays)

 

Reason: To facilitate construction of footpath and car parking bays

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 10 of 32

Streets affected 1: Noojee Street (full road closure with traffic control) between Michel Drive and Elizbeth Street

 

Streets affected 2: Michel Drive (half road with traffic control) between Station Street and End of Street

 

 

Show more

Date 1: 1 June 2021 to 1 July 2021 12.00am - 11.59pm (Noogee Street)

 

Date 2: 2 June 2021 to 2 July 2021 6.30am - 6.30pm (Michel Drive)

 

Reason: Facilitate stormwater upgrade.

 

south

Road closures

Planned - Temporary Road Closure - Southport

Day 10 of 11

Streets affected: Village Boulevard (half road closure with traffic control – expect delays) between Hill Street and Smith Street

 

Also affected: Clarke Street, Knowledge Street

 

 

 

 

Show more

Start date: 1 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of new loops.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 9 of 10

Streets affected: Kumbari Avenue (half road closure with traffic control – expect delays) between Nakina Street and Musgrave Avenue

 

Also affected: Nakina Street

Show more

Start date: 2 June 2021

 

End date: 11 June 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate installation of coloured surfacing works.

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 9 of 22

Streets affected: Helensvale Road (half road closure with traffic control, verge/footpath – expect delays) between Siganto Drive and Shepparton Road

 

Also affected: Siganto Drive

 

 

Show more

Start date: 2 June 2021

 

End date: 23 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: Install a new signal pole.

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 9

Streets affected: Surfers Paradise Boulevard (full road closure with detour/local traffic access only - traffic control onsite) between Ocean Avenue and Pandanus Avenue

 

 

Show more

Start date: 3 June 2021

 

End date: 11 June 2021 (Contingency dates in place)

 

Duration: 9.00am - 2.30pm

 

Reason: To safely undertake the installation of new loops for traffic signals.

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 7 of 15

Streets affected: Nielsens Road (reduced lanes with traffic control - expect delays) between Hickey Way and Nerang Broadbeach Road

 

Also affected: Meadow View Drive

 

Show more

Start date: 4 June 2021

 

End date: 18 June 2021

 

Duration: 9.00am - 2.00pm

 

Reason: Pavement crack sealing works.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 6 of 62

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Show more

Start date:4 June 2021

End date: 5 August 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 7 of 27

Streets affected: Ashmore Road (half road closure with detour and traffic control, parking lane, bike lane – expect delays) between Currumburra Road and Carrara Street

 

Also affected: Willamulka Avenue (half road) / Boree Street, Heeb Street, Tambourah Drive, Mediterranean Drive (full road) / Benowa Road (reduced lane) - local traffic access only

Show more

Start date: 4 June 2021

 

End date: 30 June 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation, road resurfacing- asphalting.

 

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 4 of 8

Streets affected: Citron Crescent (half road closure with detour and traffic control) between Lime Street and Emerald Drive

 

Show more

Start date: 7 June 2021

 

End date: 14 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate directional drilling and trenching

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 4 of 33

Streets affected: Yellowwood Road (half road closure with traffic control) between Quinns Hill Road West and Stapylton Jacobs Well Road

 

Show more

Start date: 7 June 2021

 

End date: 9 July 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Replacement culvert works

 

north

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 7

Streets affected: Drury Avenue (full road closure with traffic control – expect delays) Benowa Road and Ferry Road

 

Show more

Start date: 7 June 2021

 

End date: 13 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 5.00pm

 

Reason: Micro-surfacing treatment of the road pavement. 

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 4 of 7

Streets affected: Colman Road (half road closure with traffic control – expect delays) between Ragamuffin Drive East and End of Road

 

Also affected: Josephine Lane

 

 

Show more

Start date: 7 June 2021

 

End date: 13 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 5.00pm

 

Reason: Micro-surfacing treatment of the road pavement. 

north

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area

Day 4 of 12

Areas affected: Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Areas Wongawallen Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area over the period from 7.00am on Monday 7 June 2021 to 11.59pm Friday 18 June 2021.

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 4

Streets affected: Wharf Road (full road closure with traffic control – expect delays) between Old Burleigh Road and Beach end of Street

 

Show more

Start date: 8 June 2021

 

End date: 11 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Crane lifting works associated with the development site.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 5

Streets affected: George Street (full road closure with traffic control – expect delays) between Johnston Street and Smith Street

 

Show more

Start date: 8 June 2021

 

End date: 12 June 2021 (Contingency dates in place)

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate tower crane installation.

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 2 of 3

Streets affected: Petrie Street (full road closure with traffic control – expect delays) between Eden Avenue and Marine Parade

 

 

Show more

Start date: 9 June 2021

 

End date: 11 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Placement of crane to hoist excavators from site

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 1 of 4

Streets affected: Marine Parade (full road closure with traffic control – expect delays) between McLean Street and Hill Street

 

Also affected: Griffith Street between McLean Street and Wharf Street and all interconnecting Streets

 

Show more

Start date: 10 June 2021

 

End date: 13 June 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate ingress and egress of patrons for Cooly Rocks On Event.

south

Water and sewerage

Planned - Water Interruption - Southport

5.00am - 7.00am

Streets affected: Minnie Street

Cause: Meter replacement

Ref:  100780322 / A66965220

north

Road closures

Planned - Temporary Road Closure - Miami

Day 1 of 8

Streets affected: Schuster Avenue (full road closure with traffic control – expect delays) between Santa Monica Road and End of Road

 

Show more

Start date: 10 June 2021

 

End date: 17 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Facilitate maintenance on a planted green wall.

all regions

Water and sewerage

Planned - Water Interruption - Southport

7.00am - 9.00am

Streets affected: Jackman Street

Cause:  Meter replacement

Ref:  1000780305 / A6695518

north

Water and sewerage

Planned - Water Interruption - Labrador

9.00am - 11.00am

Streets affected: Bradford Street

Cause: Meter replacement

Ref:  100780364 / A67165265

 

north

Water and sewerage

Planned - Water Interruption - Southport

11.00am - 1.00pm

Streets affected: Lenneberg Street

Cause: Meter replacement

Ref:  100780348 / A67163429

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 1 of 7

Streets affected: Cnr Lindfield Road and Discovery Drive (lane/bike lane closure)

 

Show more

Start date: 10 June 2021

 

End date: 16 June 2021

 

Duration: 7.00pm - 5.00am

 

Reason: Carry out pavement restoration following recent burst water main.

 

north

Water and sewerage

Planned - Water Interruption - Reedy Creek

Day 1 of 2

Streets affected:  Bridgman Drive, Heulan Court, Ridgevista Court, Jocelyna Street, Jacob Street, Nicholas Way, Danjella Street,Peta Place

Cause: Water main replacement

Ref: 60009149 / A67139635

Show more

Start time and date: 10.00pm 10 June 2021
End time and date: 05.00am 11 June 2021

south

 
11 Jun - Friday
Water and sewerage

Unplanned - Water Interruption - Nerang

Day 2 of 2

Streets affected: Miskin Street, Batten Street

Cause: Repair water main

Ref: 1000781337

Show more

Start time and date: 06.00pm 10 June 2021
End time and date: 02.00am 11 June 2021

south

Water and sewerage

Unplanned - Water Interruption - Coomera

10.00am - 11.00am

Streets affected: Ritz Drive

Cause: Repair fire hydrant

Ref: 1000780535

north

Water and sewerage

Unplanned - Water Interruption - Ashmore

12.00pm - 1.00pm

Streets affected: Mingaletta Drive

Cause: Repair water service

Ref: 1000781391

north

Water and sewerage

Unplanned - Water Interruption - Palm Beach

1.30pm - 2.30pm

Streets affected: Townson Avenue, Kalang Street

Cause: Repair fire hydrant

Ref: 1000657374

south

Water and sewerage

Unplanned - Water Interruption - Tugun

2.15pm - 6.15pm

Streets affected: Atkin Street

Cause: Repair water main

Ref: 1000781508

south

Water and sewerage

Unplanned - Water Interruption - Runaway Bay

2.25pm - 3.25pm

Streets affected: Madang Crescent

Cause: Repair fire hydrant

Ref: 1000781069

north

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 159 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 145 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 141 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 131 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 131 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 124 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 122 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 117 of 121

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 15 June 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 109 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 104 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Southport

Day 89 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 86 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 84 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 82 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 75 of 154

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 29 May 2021

End date: 29 August 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 64 of 86

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 3 July 2021

Duration 1: 9am - 2:30pm

Duration 2: 7pm - 5am

Duration 3: 7am - 6pm (Saturdays)

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 54 of 68

Streets affected: Pacific Parade (Currumbin Oceanway only) (continuous full shared path closure) between Cooinda Avenue and Tomewin Street

Show more

Start date: 19 April 2021

End date: 25 June 2021

Duration: Midnight – 11:59pm

Reason: Continuous closure of Currumbin Oceanway shared path to facilitate sea wall construction and pavement rectification works

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 54 of 62