Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's Emergencies, disasters & outages information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'.

City Alerts now on our new website

View our new City Alerts page for the latest information on outages and interruptions to key City services and facilities.

The below list was current up to 2 December 2021. Updates from that date are available on our new website.

Legend:

unplanned

planned

December 2021

Jump to today
1 Dec - Wednesday
Beach closures and water quality issues

Unplanned - Caution - Rainfall affects recreational water quality

Day 6 of 7

Swimming areas have been affected from stormwater run-off due to recent heavy rainfall across the Gold Coast.

 

As a precaution always avoid swimming:

·         One (1) day after heavy rainfall at open beaches

·         Three (3) days after heavy rainfall at rivers, lakes and estuarine locations

·         In water that looks discoloured, murky or smells unpleasant

·         Near stormwater drains.

 

Stormwater run-off can increase pathogen levels in the water and make it unsafe for swimming.  Popular swimming locations, such as swimming enclosures, rivers, lakes, creeks, and beaches - particularly those near stormwater outlets – are sometimes affected.

 

The City will continue to monitor sites across the City

 

For more information please contact 1300 GOLDCOAST (1300 465 326).

all regions

Water and sewerage

Unplanned - Water Interruption - Currumbin Valley

10.00am - 11.00am

Streets affected: Tallebudgera Connection road

Cause: Repair water service

Ref: 1000827595

south

Water and sewerage

Unplanned - Water Interruption - Palm Beach

Day 1 of 2

Streets affected: Cypress Terrace

Cause: Repair water main

Ref: 1000730001

Start time and date:  9.50pm 1 December 2021

Finish time and date: 1.50am 2 December 2021

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 318 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 196 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 163 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 108 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 98 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 94 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 79 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 79 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 69 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 63 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 62 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 59 of 61

Streets affected: Main Beach Parade (Traffic control onsite – expect delays) between Stafford Avenue and Beulah Lane

 

Also affected: John Kemp Street

 

Start date: 4 October 2021

 

End date:  3 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate the unloading of pipes for the sand back pass project into the adjacent park.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 55 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 49 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 49 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 47 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 35 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 31 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Tugun

Day 31 of 31

Streets affected: Teemangum Street (traffic control onsite – expect delays) between Tomewin Street and Wyberba Street

 

Start date: 1 November 2021

 

End date: 1 December 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate the installation of a new watermain pipe along the footpath and divert sewer main for future bridge construction works.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 29 of 31

Streets affected: Laguna Avenue (full road closure local traffic access only) between Tahiti Ave and Manila Avenue

Start date: 3 November 2021

End date: 3 December 2021

Duration: Midnight – 11.59 pm

Reason: Facilitate electrical crossing works for the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 18 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Worongary

Day 17 of 23

Streets affected: Charles Kurz Drive (full road closure with traffic control onsite – expect delays) between Vince Hinde Drive and Vince Hinde Drive

 

Also affected: Margaret Bruce Court, Frank Burg Court

Start date: 15 November 2021

 

End date: 7 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the excavation and resurcing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 14 of 20

Streets affected: Coolibah Street (half road closure with detour and traffic control onsite – expect delays) between Myall Street and Cotlew Street

 

Also affected: Loweana Street, Myall Street

 

 

 

 

Start date 1: 18 November 2021 (Loweana Street, Myall Street)

 

End date 1: 7 December 2021

 

Start date 2:  23 November 2021 (Coolibah Street)

 

End date 2: 7 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Varsity Lakes

Day 13 of 21

Streets affected: Scottsdale Drive (half road closure with traffic control onsite) between Reedy Creek Road and Stapley Drive

 

Start date: 18 November 2021

 

End date: 9 December 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 13 of 21

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Abraham Road and Heathwood Drive

 

Start date: 19 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 10 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 10 of 15

Streets affected: Tulloch Crescent (full road closure with traffic control onsite – expect delays) between Todman Drive and Gunsynd Drive

 

Also affected: Todman Drive, Gunsynd Drive

 

 

Start date: 22 November 2021

 

End date: 6 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 10 of 17

Streets affected: Imperial Road (lane closure with QPS traffic control onsite – expect delays) between Government Road and Coral Avenue

 

Start date: 22 November 2021

 

End date: 8 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To allow workers to undertake the upgrade of signal lanterns. Lane closure will allow adequate space for workers and vehicles.  

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 9 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 7 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Merrimac

Day 7 of 9

Streets affected: Bowaggan Road (half road closure with traffic control onsite – expect delays) between Gooding Drive and Service Road

 

Start date: 25 November 2021

 

End date: 3 December 2021

 

Duration 1: 9.00am - 2.30pm (During School Term)

 

Duration 2: 6.30am - 6.30pm (Outside of School Term)

 

Reason: To facilitate excavation works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bundall

Day 7 of 15

Streets affected: Ashmore Road and Tiwi Street (lane closure with traffic control onsite – expect delays) between Racecourse Drive and Unton Street

 

Start date: 25 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 5 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 3 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 3 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 3 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 3 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 3 of 10

Streets affected: Central Street (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Ahern Street

 

Also affected: Gold Coast Highway (Partial verge/footpath)

 

Start date 1: 23 November 2021 (Gold Coast Highway)

 

End date 1: 8 December 2021

 

Duration: 12.00am - 11.30pm

 

Start date 2:  29 November 2021 (Central Street)

 

End date: 8 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road crossing for stormwater connection.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 3 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 2 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 2 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 1 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Oxenford, Pacific Pines, Studio Village

4.00am - 6.00am

Areas affected: Oxenford, Pacific Pines, Studio Village

 

Mosquito/biting midge spraying will be undertaken in these areas on Wednesday 1 December 2021 from 4am to 6am for control of mosquitos and biting midges (weather permitting).

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 1 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach

Day 1 of 3

Streets affected: Peerless Avenue (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Hedges Avenue

 

Start date: 1 December 2021

 

End date: 3 December 2021

 

Duration: 5.30am - 6.30pm

 

Reason: To safely position a mobile crane to lift an excavator out of the site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 1 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Water and sewerage

Planned - Water interruption - Pimpama

9.00am - 12.00pm

Streets affected: Tamarind Place

Cause: Meter replacement

Ref: 1000825611 / A72183410

north

Water and sewerage

Planned - Water interruption - Paradise Point

9.00am - 2.00pm

Streets affected: Milton Avenue

Cause: Repair water main

Ref: 1000821807

north

Water and sewerage

Planned - Water interruption - Palm Beach

9.00am - 2.00pm

Streets affected: Spindle Street, View Court

Cause: Upgrade water services and replace hydrants

Ref: 1000811087 / A72237451

south

Water and sewerage

Planned - Water interruption - Tallebudgera

9.00am - 2.00pm

Streets affected: Mary Bale Drive, Tally Springs Drive, Tallebudgera Connection Road

Cause: Hydrant replacement

Ref: 1000818713 / A71525907

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 1 of 3

Streets affected: Fifteenth Avenue (full road closure with traffic control onsite) between Gold Coast Highway and End of Road

 

Start date: 1 December 2021

 

End date: 3 December 2021

 

Duration: 6.00pm -2.00pm

 

Reason: To facilitate filming.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 1 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

 
2 Dec - Thursday
Beach closures and water quality issues

Unplanned - Caution - Rainfall affects recreational water quality

Day 7 of 7

Swimming areas have been affected from stormwater run-off due to recent heavy rainfall across the Gold Coast.

 

As a precaution always avoid swimming:

·         One (1) day after heavy rainfall at open beaches

·         Three (3) days after heavy rainfall at rivers, lakes and estuarine locations

·         In water that looks discoloured, murky or smells unpleasant

·         Near stormwater drains.

 

Stormwater run-off can increase pathogen levels in the water and make it unsafe for swimming.  Popular swimming locations, such as swimming enclosures, rivers, lakes, creeks, and beaches - particularly those near stormwater outlets – are sometimes affected.

 

The City will continue to monitor sites across the City

 

For more information please contact 1300 GOLDCOAST (1300 465 326).

all regions

Water and sewerage

Unplanned - Water Interruption - Palm Beach

Day 2 of 2

Streets affected: Cypress Terrace

Cause: Repair water main

Ref: 1000730001

Start time and date:  9.50pm 1 December 2021

Finish time and date: 1.50am 2 December 2021

south

Water and sewerage

Unplanned - Water Interruption - Tallai

7.45am - 12.00pm

Streets affected: Mudgeeraba Road 

Cause: Repair water main

Ref.1000828027

hinterland

Water and sewerage

Unplanned - Water Interruption - Nerang

9.00am - 1.00pm

Streets affected: Eden Court, Paradise Street, Riverview Road

Cause: Repair water main

Ref: 1000828020

all regions

Water and sewerage

Unplanned - Water Interruption - Southport

9.10am - 10.10am

Streets affected: Lilli Pilli Drive

Cause: Renew water service

Ref. 1000822179

all regions

Water and sewerage

Unplanned - Water Interruption - Currumbin Waters

9.20am - 9.50am

Streets affected: Cyclades Crescent, Paros Place

Cause: Repair water hydrant

Ref: 1000826904

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 319 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 197 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 164 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 109 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 99 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 95 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 80 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 80 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 70 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 64 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 63 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 60 of 61

Streets affected: Main Beach Parade (Traffic control onsite – expect delays) between Stafford Avenue and Beulah Lane

 

Also affected: John Kemp Street

 

Start date: 4 October 2021

 

End date:  3 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate the unloading of pipes for the sand back pass project into the adjacent park.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 56 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 50 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 50 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 48 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 36 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 32 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 30 of 31

Streets affected: Laguna Avenue (full road closure local traffic access only) between Tahiti Ave and Manila Avenue

Start date: 3 November 2021

End date: 3 December 2021

Duration: Midnight – 11.59 pm

Reason: Facilitate electrical crossing works for the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 19 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Worongary

Day 18 of 23

Streets affected: Charles Kurz Drive (full road closure with traffic control onsite – expect delays) between Vince Hinde Drive and Vince Hinde Drive

 

Also affected: Margaret Bruce Court, Frank Burg Court

Start date: 15 November 2021

 

End date: 7 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the excavation and resurcing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 15 of 20

Streets affected: Coolibah Street (half road closure with detour and traffic control onsite – expect delays) between Myall Street and Cotlew Street

 

Also affected: Loweana Street, Myall Street

 

 

 

 

Start date 1: 18 November 2021 (Loweana Street, Myall Street)

 

End date 1: 7 December 2021

 

Start date 2:  23 November 2021 (Coolibah Street)

 

End date 2: 7 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Varsity Lakes

Day 14 of 21

Streets affected: Scottsdale Drive (half road closure with traffic control onsite) between Reedy Creek Road and Stapley Drive

 

Start date: 18 November 2021

 

End date: 9 December 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 14 of 21

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Abraham Road and Heathwood Drive

 

Start date: 19 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 11 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 11 of 15

Streets affected: Tulloch Crescent (full road closure with traffic control onsite – expect delays) between Todman Drive and Gunsynd Drive

 

Also affected: Todman Drive, Gunsynd Drive

 

 

Start date: 22 November 2021

 

End date: 6 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 11 of 17

Streets affected: Imperial Road (lane closure with QPS traffic control onsite – expect delays) between Government Road and Coral Avenue

 

Start date: 22 November 2021

 

End date: 8 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To allow workers to undertake the upgrade of signal lanterns. Lane closure will allow adequate space for workers and vehicles.  

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 10 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 8 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Merrimac

Day 8 of 9

Streets affected: Bowaggan Road (half road closure with traffic control onsite – expect delays) between Gooding Drive and Service Road

 

Start date: 25 November 2021

 

End date: 3 December 2021

 

Duration 1: 9.00am - 2.30pm (During School Term)

 

Duration 2: 6.30am - 6.30pm (Outside of School Term)

 

Reason: To facilitate excavation works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bundall

Day 8 of 15

Streets affected: Ashmore Road and Tiwi Street (lane closure with traffic control onsite – expect delays) between Racecourse Drive and Unton Street

 

Start date: 25 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 6 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 4 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 4 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 4 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 4 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 4 of 10

Streets affected: Central Street (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Ahern Street

 

Also affected: Gold Coast Highway (Partial verge/footpath)

 

Start date 1: 23 November 2021 (Gold Coast Highway)

 

End date 1: 8 December 2021

 

Duration: 12.00am - 11.30pm

 

Start date 2:  29 November 2021 (Central Street)

 

End date: 8 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road crossing for stormwater connection.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 4 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 3 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 3 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 2 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 2 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach

Day 2 of 3

Streets affected: Peerless Avenue (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Hedges Avenue

 

Start date: 1 December 2021

 

End date: 3 December 2021

 

Duration: 5.30am - 6.30pm

 

Reason: To safely position a mobile crane to lift an excavator out of the site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 2 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 2 of 3

Streets affected: Fifteenth Avenue (full road closure with traffic control onsite) between Gold Coast Highway and End of Road

 

Start date: 1 December 2021

 

End date: 3 December 2021

 

Duration: 6.00pm -2.00pm

 

Reason: To facilitate filming.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 2 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 1 of 7

Streets affected: Skopps Road (full road closure with traffic control onsite) between Pimpama Jacobs Well Road and Behms Road

 

Start date: 2 December 2021

 

End date: 8 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate filming.

north

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Arundel, Coombabah, Pine Ridge, Ormeau

4.00am - 6.00am

Areas affected: Arundel, Coombabah, Pine Ridge, Ormeau

 

Mosquito/biting midge spraying will be undertaken in these areas on Thursday 2nd December 2021 from 4am to 6am for control of mosquitos and biting midges (weather permitting).

all regions

Water and sewerage

Planned - Water interruption - Palm Beach

9.00am - 2.00pm

Streets affected: Melaleuca Drive, Hakea Court, Kingfish Court

Cause: Upgrade water services and replace hydrants

Ref: 1000811257 / A72237661

south

Water and sewerage

Planned - Water interruption - Tallebudgera

9.00am - 2.00pm

Streets affected: Coorabin Court, Yandala Place

Cause: Hydrant replacement

Ref: 1000818716 / A71525907

south

Water and sewerage

Planned - Water interruption - Molendinar

6.00pm - 11.00pm

Streets affected: Industrial Avenue

Cause: Repair water main

Ref: 1000810711

north

Water and sewerage

Planned - Water interruption - Mudgeeraba

Day 1 of 2

Streets affected: Mudgeeraba Road

Cause: Repair water main

Ref: 1000819141

Start time and date: 08:00pm, 2 December 2021

End time and date: 12.00pm, 3 December 2021

south

 
3 Dec - Friday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 320 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 198 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 165 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 110 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 100 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 96 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 81 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 81 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 71 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 65 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 64 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 61 of 61

Streets affected: Main Beach Parade (Traffic control onsite – expect delays) between Stafford Avenue and Beulah Lane

 

Also affected: John Kemp Street

 

Start date: 4 October 2021

 

End date:  3 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate the unloading of pipes for the sand back pass project into the adjacent park.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 57 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 51 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 51 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 49 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 37 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 33 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 31 of 31

Streets affected: Laguna Avenue (full road closure local traffic access only) between Tahiti Ave and Manila Avenue

Start date: 3 November 2021

End date: 3 December 2021

Duration: Midnight – 11.59 pm

Reason: Facilitate electrical crossing works for the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 20 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Worongary

Day 19 of 23

Streets affected: Charles Kurz Drive (full road closure with traffic control onsite – expect delays) between Vince Hinde Drive and Vince Hinde Drive

 

Also affected: Margaret Bruce Court, Frank Burg Court

Start date: 15 November 2021

 

End date: 7 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the excavation and resurcing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 16 of 20

Streets affected: Coolibah Street (half road closure with detour and traffic control onsite – expect delays) between Myall Street and Cotlew Street

 

Also affected: Loweana Street, Myall Street

 

 

 

 

Start date 1: 18 November 2021 (Loweana Street, Myall Street)

 

End date 1: 7 December 2021

 

Start date 2:  23 November 2021 (Coolibah Street)

 

End date 2: 7 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Varsity Lakes

Day 15 of 21

Streets affected: Scottsdale Drive (half road closure with traffic control onsite) between Reedy Creek Road and Stapley Drive

 

Start date: 18 November 2021

 

End date: 9 December 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 15 of 21

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Abraham Road and Heathwood Drive

 

Start date: 19 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 12 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 12 of 15

Streets affected: Tulloch Crescent (full road closure with traffic control onsite – expect delays) between Todman Drive and Gunsynd Drive

 

Also affected: Todman Drive, Gunsynd Drive

 

 

Start date: 22 November 2021

 

End date: 6 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 12 of 17

Streets affected: Imperial Road (lane closure with QPS traffic control onsite – expect delays) between Government Road and Coral Avenue

 

Start date: 22 November 2021

 

End date: 8 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To allow workers to undertake the upgrade of signal lanterns. Lane closure will allow adequate space for workers and vehicles.  

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 11 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 9 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Merrimac

Day 9 of 9

Streets affected: Bowaggan Road (half road closure with traffic control onsite – expect delays) between Gooding Drive and Service Road

 

Start date: 25 November 2021

 

End date: 3 December 2021

 

Duration 1: 9.00am - 2.30pm (During School Term)

 

Duration 2: 6.30am - 6.30pm (Outside of School Term)

 

Reason: To facilitate excavation works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bundall

Day 9 of 15

Streets affected: Ashmore Road and Tiwi Street (lane closure with traffic control onsite – expect delays) between Racecourse Drive and Unton Street

 

Start date: 25 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 7 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 5 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 5 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 5 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 5 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 5 of 10

Streets affected: Central Street (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Ahern Street

 

Also affected: Gold Coast Highway (Partial verge/footpath)

 

Start date 1: 23 November 2021 (Gold Coast Highway)

 

End date 1: 8 December 2021

 

Duration: 12.00am - 11.30pm

 

Start date 2:  29 November 2021 (Central Street)

 

End date: 8 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road crossing for stormwater connection.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 5 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 4 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 4 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 3 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 3 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach

Day 3 of 3

Streets affected: Peerless Avenue (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Hedges Avenue

 

Start date: 1 December 2021

 

End date: 3 December 2021

 

Duration: 5.30am - 6.30pm

 

Reason: To safely position a mobile crane to lift an excavator out of the site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 3 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 3 of 3

Streets affected: Fifteenth Avenue (full road closure with traffic control onsite) between Gold Coast Highway and End of Road

 

Start date: 1 December 2021

 

End date: 3 December 2021

 

Duration: 6.00pm -2.00pm

 

Reason: To facilitate filming.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 3 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 2 of 7

Streets affected: Skopps Road (full road closure with traffic control onsite) between Pimpama Jacobs Well Road and Behms Road

 

Start date: 2 December 2021

 

End date: 8 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate filming.

north

Water and sewerage

Planned - Water interruption - Mudgeeraba

Day 2 of 2

Streets affected: Mudgeeraba Road

Cause: Repair water main

Ref: 1000819141

Start time and date: 08:00pm, 2 December 2021

End time and date: 12.00pm, 3 December 2021

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 1 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Water and sewerage

Planned - Water interruption - Palm Beach

9.00am - 2.00pm

Streets affected: Cassia Court

Cause: Upgrade water services and replace hydrants

Ref: 1000811081 / A72237807

south

Water and sewerage

Planned - Water interruption - Tallebudgera

9.00am - 2.00pm

Streets affected: Karragata Court

Cause: Hydrant replacement

Ref: 1000818719 / A71525907

south

Water and sewerage

Planned - Water interruption - Southport

5.30pm - 7.30pm

Streets affected: Nerang Street

Cause: Meter replacement

Ref: 1000827848 / A72413235

north

 
4 Dec - Saturday
Water and sewerage

Unplanned - Water Interruption - Highland Park

Day 1 of 2

Streets affected: Alexander Drive, Kahlua Court

Cause: Repair broken main

Ref: 1000828814

Start time and date: 4.30pm, 4 December 2021

End time and date: 4.00am, 5 December 2021

south

Water and sewerage

Unplanned - Water Interruption - Maudsland

9.20pm - 10.20pm

Streets affected: Lowe Court

Cause: Repair water service

Ref: 1000828867

north

Road closures

Planned - Temporary Road Closure - Ormeau

Day 321 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 199 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 166 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 111 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 101 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 82 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 82 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 72 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 66 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 65 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 58 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 52 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 52 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 50 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 38 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 34 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 21 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Worongary

Day 20 of 23

Streets affected: Charles Kurz Drive (full road closure with traffic control onsite – expect delays) between Vince Hinde Drive and Vince Hinde Drive

 

Also affected: Margaret Bruce Court, Frank Burg Court

Start date: 15 November 2021

 

End date: 7 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the excavation and resurcing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 17 of 20

Streets affected: Coolibah Street (half road closure with detour and traffic control onsite – expect delays) between Myall Street and Cotlew Street

 

Also affected: Loweana Street, Myall Street

 

 

 

 

Start date 1: 18 November 2021 (Loweana Street, Myall Street)

 

End date 1: 7 December 2021

 

Start date 2:  23 November 2021 (Coolibah Street)

 

End date 2: 7 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Varsity Lakes

Day 16 of 21

Streets affected: Scottsdale Drive (half road closure with traffic control onsite) between Reedy Creek Road and Stapley Drive

 

Start date: 18 November 2021

 

End date: 9 December 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 16 of 21

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Abraham Road and Heathwood Drive

 

Start date: 19 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 13 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 13 of 15

Streets affected: Tulloch Crescent (full road closure with traffic control onsite – expect delays) between Todman Drive and Gunsynd Drive

 

Also affected: Todman Drive, Gunsynd Drive

 

 

Start date: 22 November 2021

 

End date: 6 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 13 of 17

Streets affected: Imperial Road (lane closure with QPS traffic control onsite – expect delays) between Government Road and Coral Avenue

 

Start date: 22 November 2021

 

End date: 8 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To allow workers to undertake the upgrade of signal lanterns. Lane closure will allow adequate space for workers and vehicles.  

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 12 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 10 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bundall

Day 10 of 15

Streets affected: Ashmore Road and Tiwi Street (lane closure with traffic control onsite – expect delays) between Racecourse Drive and Unton Street

 

Start date: 25 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 8 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 6 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 6 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 6 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 6 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 6 of 10

Streets affected: Central Street (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Ahern Street

 

Also affected: Gold Coast Highway (Partial verge/footpath)

 

Start date 1: 23 November 2021 (Gold Coast Highway)

 

End date 1: 8 December 2021

 

Duration: 12.00am - 11.30pm

 

Start date 2:  29 November 2021 (Central Street)

 

End date: 8 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road crossing for stormwater connection.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 6 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 5 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 5 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 4 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 4 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 4 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 4 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 3 of 7

Streets affected: Skopps Road (full road closure with traffic control onsite) between Pimpama Jacobs Well Road and Behms Road

 

Start date: 2 December 2021

 

End date: 8 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate filming.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 2 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Tugun

7.00am - 10.30pm

Streets affected: Toolona Street (full road closure with traffic control onsite) between Golden Four Drive and O'Conner Street

 

Also affected: O'Connor Street 

 

Start date: 4 December 2021

 

End date: 4 December 2021

 

Duration: 7.00am - 10.30pm

 

Reason: EVENT - Tugun Lights Up 2021 (O'Connor Street Car Park reserved from 5.00pm 3/12/21) 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

2.00pm - 10.00pm

Streets affected: Inga Avenue (traffic control onsite – expect delays) between Crombie Avenue and Tima Avenue

 

Start date: 4 December 2021

 

End date: 4 December 2021

 

Duration: 2.00pm - 10.00pm

 

Reason: To Prevent Event Parking within resident area.

south

 
5 Dec - Sunday
Water and sewerage

Unplanned - Water Interruption - Highland Park

Day 2 of 2

Streets affected: Alexander Drive, Kahlua Court

Cause: Repair broken main

Ref: 1000828814

Start time and date: 4.30pm, 4 December 2021

End time and date: 4.00am, 5 December 2021

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 322 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 200 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 167 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 112 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 102 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 83 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 83 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 73 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 67 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 66 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 59 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 53 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 53 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 51 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 39 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 35 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 22 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Worongary

Day 21 of 23

Streets affected: Charles Kurz Drive (full road closure with traffic control onsite – expect delays) between Vince Hinde Drive and Vince Hinde Drive

 

Also affected: Margaret Bruce Court, Frank Burg Court

Start date: 15 November 2021

 

End date: 7 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the excavation and resurcing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 18 of 20

Streets affected: Coolibah Street (half road closure with detour and traffic control onsite – expect delays) between Myall Street and Cotlew Street

 

Also affected: Loweana Street, Myall Street

 

 

 

 

Start date 1: 18 November 2021 (Loweana Street, Myall Street)

 

End date 1: 7 December 2021

 

Start date 2:  23 November 2021 (Coolibah Street)

 

End date 2: 7 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Varsity Lakes

Day 17 of 21

Streets affected: Scottsdale Drive (half road closure with traffic control onsite) between Reedy Creek Road and Stapley Drive

 

Start date: 18 November 2021

 

End date: 9 December 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 17 of 21

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Abraham Road and Heathwood Drive

 

Start date: 19 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 14 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 14 of 15

Streets affected: Tulloch Crescent (full road closure with traffic control onsite – expect delays) between Todman Drive and Gunsynd Drive

 

Also affected: Todman Drive, Gunsynd Drive

 

 

Start date: 22 November 2021

 

End date: 6 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 14 of 17

Streets affected: Imperial Road (lane closure with QPS traffic control onsite – expect delays) between Government Road and Coral Avenue

 

Start date: 22 November 2021

 

End date: 8 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To allow workers to undertake the upgrade of signal lanterns. Lane closure will allow adequate space for workers and vehicles.  

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 13 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 11 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bundall

Day 11 of 15

Streets affected: Ashmore Road and Tiwi Street (lane closure with traffic control onsite – expect delays) between Racecourse Drive and Unton Street

 

Start date: 25 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 9 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 7 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 7 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 7 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 7 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 7 of 10

Streets affected: Central Street (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Ahern Street

 

Also affected: Gold Coast Highway (Partial verge/footpath)

 

Start date 1: 23 November 2021 (Gold Coast Highway)

 

End date 1: 8 December 2021

 

Duration: 12.00am - 11.30pm

 

Start date 2:  29 November 2021 (Central Street)

 

End date: 8 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road crossing for stormwater connection.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 7 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 6 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 6 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 5 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 5 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 5 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 5 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 4 of 7

Streets affected: Skopps Road (full road closure with traffic control onsite) between Pimpama Jacobs Well Road and Behms Road

 

Start date: 2 December 2021

 

End date: 8 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate filming.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 3 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

 
6 Dec - Monday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 323 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 201 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 168 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 113 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 103 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 84 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 84 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 74 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 68 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 67 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 60 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 54 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 54 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 52 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 40 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 36 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 23 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Worongary

Day 22 of 23

Streets affected: Charles Kurz Drive (full road closure with traffic control onsite – expect delays) between Vince Hinde Drive and Vince Hinde Drive

 

Also affected: Margaret Bruce Court, Frank Burg Court

Start date: 15 November 2021

 

End date: 7 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the excavation and resurcing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 19 of 20

Streets affected: Coolibah Street (half road closure with detour and traffic control onsite – expect delays) between Myall Street and Cotlew Street

 

Also affected: Loweana Street, Myall Street

 

 

 

 

Start date 1: 18 November 2021 (Loweana Street, Myall Street)

 

End date 1: 7 December 2021

 

Start date 2:  23 November 2021 (Coolibah Street)

 

End date 2: 7 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Varsity Lakes

Day 18 of 21

Streets affected: Scottsdale Drive (half road closure with traffic control onsite) between Reedy Creek Road and Stapley Drive

 

Start date: 18 November 2021

 

End date: 9 December 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 18 of 21

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Abraham Road and Heathwood Drive

 

Start date: 19 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 15 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 15 of 15

Streets affected: Tulloch Crescent (full road closure with traffic control onsite – expect delays) between Todman Drive and Gunsynd Drive

 

Also affected: Todman Drive, Gunsynd Drive

 

 

Start date: 22 November 2021

 

End date: 6 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 15 of 17

Streets affected: Imperial Road (lane closure with QPS traffic control onsite – expect delays) between Government Road and Coral Avenue

 

Start date: 22 November 2021

 

End date: 8 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To allow workers to undertake the upgrade of signal lanterns. Lane closure will allow adequate space for workers and vehicles.  

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 14 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 12 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bundall

Day 12 of 15

Streets affected: Ashmore Road and Tiwi Street (lane closure with traffic control onsite – expect delays) between Racecourse Drive and Unton Street

 

Start date: 25 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 10 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 8 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 8 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 8 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 8 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 8 of 10

Streets affected: Central Street (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Ahern Street

 

Also affected: Gold Coast Highway (Partial verge/footpath)

 

Start date 1: 23 November 2021 (Gold Coast Highway)

 

End date 1: 8 December 2021

 

Duration: 12.00am - 11.30pm

 

Start date 2:  29 November 2021 (Central Street)

 

End date: 8 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road crossing for stormwater connection.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 8 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 7 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 7 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 6 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 6 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 6 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 6 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 5 of 7

Streets affected: Skopps Road (full road closure with traffic control onsite) between Pimpama Jacobs Well Road and Behms Road

 

Start date: 2 December 2021

 

End date: 8 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate filming.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 4 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Water and sewerage

Planned - Water interruption - Ormeau

3.00am - 4.30am

Streets affected: Lahrs Road, Mark Porter Place

Cause: Hydrant maintenance

Ref: 1000825483 / A72189226

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 1 of 5

Streets affected: Clarke Street (full road closure with detour) between Boundary Street and Marine Parade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 5.00am - 6.00pm

 

Reason: To faciliate filming.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Heads

Day 1 of 5

Streets affected: Second Avenue (full road closure with traffic control onsite – expect delays) between Gold coast Highway and The Esplanade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate concrete pours for development site.

south

Water and sewerage

Planned - Water interruption - Runaway Bay

9.00am - 12.00pm

Streets affected: Pine Ridge Road

Cause: Meter replacement

Ref: 1000825896 / A71925070

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Molendinar

Day 1 of 5

Streets affected: Macquarie Avenue (half road closure with traffic control onsite) between Blaxland Avenue and Sturt Street

 

Also affected: Dampier Court, Sturt Street, Darling Crescent

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate CCTV condition assessment of existing stormwater network.

north

Water and sewerage

Planned - Water interruption - Parkwood

12.00pm - 5.00pm

Streets affected: Greenacre Drive

Cause: Meter replacement

Ref: 1000827431 / A71924893

north

Water and sewerage

Planned - Water interruption - Advancetown

2.00pm - 7.00pm

Streets affected: Gilston Road

Cause: Meter replacement

Ref: 1000827459 / A72199479

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 1 of 5

Streets affected: Musgrave Street (half road closure with detour and traffic control onsite – expect delays) between Coolangatta Road and Winston Street

 

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate asphalt works.

 

south

 
7 Dec - Today
Road closures

Planned - Temporary Road Closure - Ormeau

Day 324 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 202 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 169 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 114 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 104 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 85 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 85 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 75 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 69 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 68 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 61 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 55 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 55 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 53 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 41 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 37 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 24 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Worongary

Day 23 of 23

Streets affected: Charles Kurz Drive (full road closure with traffic control onsite – expect delays) between Vince Hinde Drive and Vince Hinde Drive

 

Also affected: Margaret Bruce Court, Frank Burg Court

Start date: 15 November 2021

 

End date: 7 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the excavation and resurcing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 20 of 20

Streets affected: Coolibah Street (half road closure with detour and traffic control onsite – expect delays) between Myall Street and Cotlew Street

 

Also affected: Loweana Street, Myall Street

 

 

 

 

Start date 1: 18 November 2021 (Loweana Street, Myall Street)

 

End date 1: 7 December 2021

 

Start date 2:  23 November 2021 (Coolibah Street)

 

End date 2: 7 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Varsity Lakes

Day 19 of 21

Streets affected: Scottsdale Drive (half road closure with traffic control onsite) between Reedy Creek Road and Stapley Drive

 

Start date: 18 November 2021

 

End date: 9 December 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 19 of 21

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Abraham Road and Heathwood Drive

 

Start date: 19 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 16 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 16 of 17

Streets affected: Imperial Road (lane closure with QPS traffic control onsite – expect delays) between Government Road and Coral Avenue

 

Start date: 22 November 2021

 

End date: 8 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To allow workers to undertake the upgrade of signal lanterns. Lane closure will allow adequate space for workers and vehicles.  

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 15 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 13 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bundall

Day 13 of 15

Streets affected: Ashmore Road and Tiwi Street (lane closure with traffic control onsite – expect delays) between Racecourse Drive and Unton Street

 

Start date: 25 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 11 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 9 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 9 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 9 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 9 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 9 of 10

Streets affected: Central Street (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Ahern Street

 

Also affected: Gold Coast Highway (Partial verge/footpath)

 

Start date 1: 23 November 2021 (Gold Coast Highway)

 

End date 1: 8 December 2021

 

Duration: 12.00am - 11.30pm

 

Start date 2:  29 November 2021 (Central Street)

 

End date: 8 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road crossing for stormwater connection.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 9 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 8 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 8 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 7 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 7 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 7 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 7 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 6 of 7

Streets affected: Skopps Road (full road closure with traffic control onsite) between Pimpama Jacobs Well Road and Behms Road

 

Start date: 2 December 2021

 

End date: 8 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate filming.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 5 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 2 of 5

Streets affected: Clarke Street (full road closure with detour) between Boundary Street and Marine Parade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 5.00am - 6.00pm

 

Reason: To faciliate filming.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Heads

Day 2 of 5

Streets affected: Second Avenue (full road closure with traffic control onsite – expect delays) between Gold coast Highway and The Esplanade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate concrete pours for development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Molendinar

Day 2 of 5

Streets affected: Macquarie Avenue (half road closure with traffic control onsite) between Blaxland Avenue and Sturt Street

 

Also affected: Dampier Court, Sturt Street, Darling Crescent

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate CCTV condition assessment of existing stormwater network.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 2 of 5

Streets affected: Musgrave Street (half road closure with detour and traffic control onsite – expect delays) between Coolangatta Road and Winston Street

 

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate asphalt works.

 

south

Water and sewerage

Planned - Water interruption - Currumbin

9.00am - 2.00pm

Streets affected:  Duringan Street, Hooper Drive, Fielding Street, Weeumba Street

Cause: Hydrant replacement

Ref: 1000825766 / A72192362

south

Water and sewerage

Planned - Water interruption - Mudgeeraba

9.00am - 2.00pm

Streets affected: Franklin Drive

Cause: Meter replacement

Ref: 1000825802 / A72199303

south

Water and sewerage

Planned - Water interruption - Miami

9.00am - 2.00pm

Streets affected: Miami Shore Parade, Nobby Parade

Cause: Installation of valves

Ref: 1000826141 / A72240568

south

Water and sewerage

Planned - Water interruption - Southport

9.00am - 12.00pm

Streets affected: Marine Parade

Cause: Meter replacement 

Ref: 1000827489 / A71924534

north

Water and sewerage

Planned - Water interruption - Ashmore

12.00pm - 3.00pm

Streets affected: Galloway Drive

Cause: Meter replacement

Ref: 1000827524 / A71924158

north

 
8 Dec - Wednesday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 325 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 203 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 170 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 115 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 105 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 86 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 86 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 76 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 70 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 69 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 62 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 56 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 56 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 54 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 42 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 38 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 25 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Varsity Lakes

Day 20 of 21

Streets affected: Scottsdale Drive (half road closure with traffic control onsite) between Reedy Creek Road and Stapley Drive

 

Start date: 18 November 2021

 

End date: 9 December 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 20 of 21

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Abraham Road and Heathwood Drive

 

Start date: 19 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 17 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 17 of 17

Streets affected: Imperial Road (lane closure with QPS traffic control onsite – expect delays) between Government Road and Coral Avenue

 

Start date: 22 November 2021

 

End date: 8 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To allow workers to undertake the upgrade of signal lanterns. Lane closure will allow adequate space for workers and vehicles.  

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 16 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 14 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bundall

Day 14 of 15

Streets affected: Ashmore Road and Tiwi Street (lane closure with traffic control onsite – expect delays) between Racecourse Drive and Unton Street

 

Start date: 25 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 12 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 10 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 10 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 10 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 10 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 10 of 10

Streets affected: Central Street (full road closure with traffic control onsite – expect delays) between Gold Coast Highway and Ahern Street

 

Also affected: Gold Coast Highway (Partial verge/footpath)

 

Start date 1: 23 November 2021 (Gold Coast Highway)

 

End date 1: 8 December 2021

 

Duration: 12.00am - 11.30pm

 

Start date 2:  29 November 2021 (Central Street)

 

End date: 8 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road crossing for stormwater connection.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 10 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 9 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 9 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 8 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 8 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 8 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 8 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 7 of 7

Streets affected: Skopps Road (full road closure with traffic control onsite) between Pimpama Jacobs Well Road and Behms Road

 

Start date: 2 December 2021

 

End date: 8 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate filming.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 6 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 3 of 5

Streets affected: Clarke Street (full road closure with detour) between Boundary Street and Marine Parade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 5.00am - 6.00pm

 

Reason: To faciliate filming.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Heads

Day 3 of 5

Streets affected: Second Avenue (full road closure with traffic control onsite – expect delays) between Gold coast Highway and The Esplanade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate concrete pours for development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Molendinar

Day 3 of 5

Streets affected: Macquarie Avenue (half road closure with traffic control onsite) between Blaxland Avenue and Sturt Street

 

Also affected: Dampier Court, Sturt Street, Darling Crescent

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate CCTV condition assessment of existing stormwater network.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 3 of 5

Streets affected: Musgrave Street (half road closure with detour and traffic control onsite – expect delays) between Coolangatta Road and Winston Street

 

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate asphalt works.

 

south

Water and sewerage

Planned - Water interruption - Tallebudgera

9.00am - 2.00pm

Streets affected: Westminster Boulevarde, Doreset Place

Cause: Hydrant replacement

Ref: 1000825782 / A72192362

south

Water and sewerage

Planned - Water interruption - Surfers Paradise

9.00am - 2.00pm

Streets affected: Salerno Street

Cause: Meter replacement

Ref: 1000827618 / A71943945

north

Water and sewerage

Planned - Water interruption - Ashmore

9.00am - 12.00pm

Streets affected: Girraween Grove

Cause: Meter replacement

Ref: 1000827652 / A71923695

north

Water and sewerage

Planned - Water interruption - Mermaid Waters

9.00am - 2.00pm

Streets affected: Albicore Street, Toorak Park Avenue, Constance Avenue

Cause: Installation of valves

Ref: 1000817532 / A71967495

south

 
9 Dec - Thursday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 326 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 204 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 171 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 116 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 106 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 87 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 87 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 77 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 71 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 70 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 63 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 57 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 57 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 55 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 43 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 39 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 26 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Varsity Lakes

Day 21 of 21

Streets affected: Scottsdale Drive (half road closure with traffic control onsite) between Reedy Creek Road and Stapley Drive

 

Start date: 18 November 2021

 

End date: 9 December 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 21 of 21

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Abraham Road and Heathwood Drive

 

Start date: 19 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 18 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 17 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 15 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bundall

Day 15 of 15

Streets affected: Ashmore Road and Tiwi Street (lane closure with traffic control onsite – expect delays) between Racecourse Drive and Unton Street

 

Start date: 25 November 2021

 

End date: 9 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the replacement of signal post and footing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 13 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 11 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 11 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 11 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 11 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 11 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 10 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 10 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 9 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 9 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 9 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 9 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 7 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 4 of 5

Streets affected: Clarke Street (full road closure with detour) between Boundary Street and Marine Parade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 5.00am - 6.00pm

 

Reason: To faciliate filming.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Heads

Day 4 of 5

Streets affected: Second Avenue (full road closure with traffic control onsite – expect delays) between Gold coast Highway and The Esplanade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate concrete pours for development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Molendinar

Day 4 of 5

Streets affected: Macquarie Avenue (half road closure with traffic control onsite) between Blaxland Avenue and Sturt Street

 

Also affected: Dampier Court, Sturt Street, Darling Crescent

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate CCTV condition assessment of existing stormwater network.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 4 of 5

Streets affected: Musgrave Street (half road closure with detour and traffic control onsite – expect delays) between Coolangatta Road and Winston Street

 

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate asphalt works.

 

south

Water and sewerage

Planned - Water interruption - Elanora

9.00am - 2.00pm

Streets affected:  Cornwall Drive

Cause: Hydrant replacement

Ref: 1000825786 / A72192362

south

Water and sewerage

Planned - Water interruption - Labrador

9.00am - 2.00pm

Streets affected: Harley Street

Cause: Meter replacement

Ref: 1000827709 / A71943833

north

 
10 Dec - Friday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 327 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 205 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 172 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 117 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 107 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 88 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 88 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 78 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 72 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 71 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin Waters

Day 64 of 64

Streets affected: Guineas Creek Road (half/full road closure with traffic control onsite)between Double View Drive and Numida Street

 

Start date: 8 October 2021

 

End date: 10 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To safely construct a retaining wall adjacent to the roadway. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 58 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 58 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 56 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 44 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 40 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 27 of 27

Streets affected: Christine Avenue (full road closure with traffic control onsite – expect delays) between Cassowary Drive and Lemana Lane

 

Also affected: Tattler Way, Seriema Street, Galeen Drive, Dunline Drive, Barbet Place

Start date: 13 November 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 19 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 18 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD LCOSURE - Coomera

Day 16 of 16

Streets affected: Foxwell Road (lane closure with traffic control onsite – expect delays) between Old Pacific Highway and George Alexander Way

 

Start date: 25 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 2.30pm

 

Reason: To facilitate the removal of temporary bollards.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 14 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 12 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 12 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 12 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 12 of 12

Streets affected: Eden Avenue (full road closure with traffic control onsite – expect delays) between Ward Street and Hill Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate the excavation for Storm Water works. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 12 of 12

Streets affected: Nineteenth Avenue (lane closure with traffic control onsite – expect delays) between Guineas Creek Road and Saffron Street

 

Start date: 29 November 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To facilitate pavement investigation of boreholes.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 11 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 11 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 10 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 10 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 10 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 10 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 8 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 5 of 5

Streets affected: Clarke Street (full road closure with detour) between Boundary Street and Marine Parade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 5.00am - 6.00pm

 

Reason: To faciliate filming.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Heads

Day 5 of 5

Streets affected: Second Avenue (full road closure with traffic control onsite – expect delays) between Gold coast Highway and The Esplanade

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate concrete pours for development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Molendinar

Day 5 of 5

Streets affected: Macquarie Avenue (half road closure with traffic control onsite) between Blaxland Avenue and Sturt Street

 

Also affected: Dampier Court, Sturt Street, Darling Crescent

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate CCTV condition assessment of existing stormwater network.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 5 of 5

Streets affected: Musgrave Street (half road closure with detour and traffic control onsite – expect delays) between Coolangatta Road and Winston Street

 

 

Start date: 6 December 2021

 

End date: 10 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate asphalt works.

 

south

Water and sewerage

Planned - Water interruption - Tallebudgera

9.00am - 2.00pm

Streets affected: Monday Drive, Tuesday Drive

Cause: Hydrant replacement

Ref: 1000825789 / A72192362

south

Water and sewerage

Planned - Water interruption - Labrador

9.00am - 2.00pm

Streets affected: Schneider Avenue

Cause: Meter replacement

Ref: 1000827735 / A71944020

north

 
11 Dec - Saturday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 328 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 206 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 173 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 118 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 108 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 89 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 89 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 79 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 73 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 72 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 59 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 59 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 57 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 45 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 41 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 20 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 19 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 15 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 13 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 13 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 13 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 12 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 12 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 11 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 11 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 11 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 11 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 9 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

 
12 Dec - Sunday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 329 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 207 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 174 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 119 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 109 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 90 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 90 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 80 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 74 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 73 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 60 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 60 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 58 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 46 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 42 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 21 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 20 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 16 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 14 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 14 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 14 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 13 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 13 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 12 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 12 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 12 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 12 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 10 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

 
13 Dec - Monday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 330 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 208 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 175 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 120 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 110 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 91 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 91 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 81 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 75 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 74 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 61 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 61 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 59 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 47 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 43 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 22 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 21 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 17 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 15 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 15 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 15 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 14 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 14 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 13 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 13 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 13 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 13 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 11 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 1 of 10

Streets affected: Finnegan Way (half road closure with traffic control onsite – expect delays) between Cirrus Way and Celestial Way

 

 

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 1 of 10

Streets affected: Gemvale Road (half road closure with traffic control onsite – expect delays) between Somerset Drive and Northampton Boulevard

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

 
14 Dec - Tuesday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 331 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 209 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 121 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 111 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 92 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 92 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 82 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 76 of 76

Streets affected: Alabaster Drive (full road closure with traffic control onsite) between Nerang - Broadbeach Road and Plateau Crescent

 

Start date: 30 September 2021

 

End date: 14 December 2021

 

Duration: 3.00pm - 11.00pm

 

Reason: To facilitate the safe ingress and egress of spectators.

all regions

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 75 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 62 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 62 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 60 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 48 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 44 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 23 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 22 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 18 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 16 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 16 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 16 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 15 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 15 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 14 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 14 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 14 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 14 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 12 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 2 of 10

Streets affected: Finnegan Way (half road closure with traffic control onsite – expect delays) between Cirrus Way and Celestial Way

 

 

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 2 of 10

Streets affected: Gemvale Road (half road closure with traffic control onsite – expect delays) between Somerset Drive and Northampton Boulevard

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

Water and sewerage

Planned - Water interruption - Broadbeach Waters

9.00am - 2.00pm

Streets affected: Monaco Street

Cause: Valve installation

Ref: 1000816693 / A771851873

south

Water and sewerage

Planned - Water interruption - Currumbin

9.00am - 2.00pm

Streets affected: Philip Street, Westview Road

Cause: Hydrant replacement

Ref: 1000826824 / A72361247

south

 
15 Dec - Wednesday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 332 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 210 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 122 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 112 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 93 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 93 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 83 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 76 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 63 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 63 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 61 of 61

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 16 October 2021

 

End date: 15 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 49 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 45 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 24 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 23 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 19 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 17 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 17 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 17 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 16 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 16 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 15 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 15 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 15 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 15 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 13 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 3 of 10

Streets affected: Finnegan Way (half road closure with traffic control onsite – expect delays) between Cirrus Way and Celestial Way

 

 

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 3 of 10

Streets affected: Gemvale Road (half road closure with traffic control onsite – expect delays) between Somerset Drive and Northampton Boulevard

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

Water and sewerage

Planned - Water interruption - Tallebudgera Valley

9.00am - 2.00pm

Streets affected: Tallebudgera Creek Road

Cause: Hydrant replacement

Ref: 1000826828 / A72361247

south

 
16 Dec - Thursday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 333 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 211 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 123 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 113 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 94 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 94 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 84 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 77 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 64 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 64 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 50 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 46 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 25 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 24 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 20 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 18 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 18 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 18 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 17 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 17 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 16 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 16 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 16 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 16 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 14 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 4 of 10

Streets affected: Finnegan Way (half road closure with traffic control onsite – expect delays) between Cirrus Way and Celestial Way

 

 

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 4 of 10

Streets affected: Gemvale Road (half road closure with traffic control onsite – expect delays) between Somerset Drive and Northampton Boulevard

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

Water and sewerage

Planned - Water interruption - Currumbin Waters

9.00am - 2.00pm

Streets affected: Killara Street, Yatama Place

Cause: Hydrant replacement

Ref: 1000826831 / A72361247

south

 
17 Dec - Friday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 334 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 212 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 124 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 114 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 95 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 95 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 85 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 78 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 65 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 65 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 51 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 47 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021

 

End date: 23 May 2022

 

Duration 1: 6.30am - 6.30pm (Footpath, Parking, Bike lane)

 

Duration 2: 9.00am - 2.30pm (Lane)

 

Reason: To facilitate road rehabilitation.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 26 of 29

Streets affected: Village Boulevarde (full road closure with traffic control onsite) between Hamersley Street and Pimpama Jacobs Well Road

 

Also affected: Fairbourne Terrace

 

Start date 1: 22 November 2021 (Village Boulevarde)

 

End date 2:  20 December 2021

 

Duration: 12.00am - 11.59pm

 

Start date 2: 22 November 2021 (Fairbourne Terrace)

 

End date 2: 20 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate asphalt removal and replacement.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 25 of 29

Streets affected: Townson Avenue (full road closure with traffic control onsite – expect delays) between Seventh Avenue and Tenth Avenue

 

Start date: 23 November 2021

 

End date: 21 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 21 of 27

Streets affected: Thornton Street (full road closure with local traffic access only and traffic control onsite – expect delays) between Garfield Terrace and Beach end of road

 

Also affected: Garfield Terrace

Start date: 27 November 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: Northcliffe Surf Club Renovation - Safely Install a new roof, footpath rebuild, install retaining wall and landscaping.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 19 of 25

Streets affected: Riverbend Avenue (half road closure with traffic control onsite – expect delays) between Gregory Drive and Manchester Road

 

Also affected: Witt Avenue, Craig Avenue, Manchester Road, Market Street

 

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 19 of 25

Streets affected: Shilito Street (full road closure with traffic control onsite – expect delays) between George Street and Water Street

 

Also affected: Walter Street, George Street

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Miami

Day 19 of 22

Streets affected: Lutana Avenue (full road closure with traffic control onsite – expect delays) between Anthony Drive and Mountain View Avenue

 

Start date: 29 November 2021

 

End date: 20 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach/Mermaid Waters

Day 18 of 24

Streets affected: Markeri Street (half road closure with detour and traffic control onsite) between Intrepid Drive and Gold Coast Highway

 

Also affected: Sunshine Boulevard, Avanti Street, Sovereign Drive

 

Start date: 29 November 2021

 

End date: 23 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Carrara

Day 18 of 24

Streets affected: Sacha Place (full road closure with traffic control onsite – expect delays) between Riverbend Avenue and Cul de sac

 

Also affected: Riverbend Avenue

 

Start date: 30 November 2021

 

End date: 23 December 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 17 of 62

Streets affected: Moresby Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 1 December 2021

 

End date: 31 January 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new sewer connections as part of the M1 upgrade project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pacific Pines

Day 17 of 19

Streets affected: Studio Drive (lane closure - drive to conditions) between Binstead Way and Monroe Court

 

Start date: 1 December 2021

 

End date: 19 December 2021

 

Duration: 5.00am - 2.00pm

 

Reason: To facilitate the cutting of the road, removing old boxes to reset so they are level with the road and bitumen.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 17 of 17

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 1 December 2021

End date: 17 December 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 17 of 29

Streets affected: Christine Avenue (full road closure with traffic control onsite) between Mattocks Road and Seriema Street

 

Also affected: Cassowary Drive, Tattler Way

 

Start date: 1 December 2021

 

End date: 29 December 2021

 

Duration: 7.00pm - 5.00am

 

Reason: To facilitate excavation and resurfacing works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Benowa

Day 15 of 15

Streets affected: Benowa Road (half road closure with traffic control onsite – expect delays) between Dunkeith Avenue and Crista Way/Cabana Boulevard

 

Also affected: Kilbreck Street, Christa Way

Start date: 3 December 2021

 

End date: 17 December 2021

 

Duration: 6.00am - 8.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 5 of 10

Streets affected: Finnegan Way (half road closure with traffic control onsite – expect delays) between Cirrus Way and Celestial Way

 

 

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mudgeeraba

Day 5 of 10

Streets affected: Gemvale Road (half road closure with traffic control onsite – expect delays) between Somerset Drive and Northampton Boulevard

 

Start date: 13 December 2021

 

End date: 22 December 2021

 

Duration: 9.00am - 3.00pm

 

Reason: To facilitate profile and replace pavement failures (Asphalt).

north

Water and sewerage

Planned - Water interruption - Tallebudgera

9.00am - 2.00pm

Streets affected: Carapook Crescent

Cause: Hydrant replacement

Ref: 1000826835 / A72361247

south

 
18 Dec - Saturday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 335 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 213 of 508

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Remembrance Drive (Lane closure), Markwell Avenue, Amalfi Drive (North), Enderley Avenue (Full road closure)

 

Start date: 19 May 2021

 

End date: 9 October 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 125 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 96 of 160

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 14 September 2021

End date: 20 February 2022

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closures - Pimpama

Day 96 of 124

Streets affected: Dixon Drive (Reduced lanes) between Yawalpah Road and Soldier Bird Avenue

Start date: 14 September 2021

End date: 15 January 2022

Duration 1: 9am - 2:30pm

Duration 2: 6:30am – 6:30pm (school holidays)

Reason: Bus stop upgrade and bike lane closure

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 86 of 91

Streets affected: Dalpura Street (half road closure with detour and traffic control onsite – expect delays) between Purli Street and Burra Street

 

Start date: 24 September 2021

 

End date: 23 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities and safe pedestrian movement.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 79 of 273

Streets affected: Currumbin Creek Road (half road closure with detour and traffic control onsite) between Braewood Drive and Denning Road

 

Start date: 1 October 2021

 

End date: 20 June 2022

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate bridge replacement works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 66 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate new water and sewer connections as part of the M1 Upgrade Project.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Elanora

Day 66 of 71

Streets affected: Kalamunda Close (full road closure with traffic control onsite – expect delays) between K P McGrath Drive and Vista Street

 

 

Start date: 14 October 2021

 

End date: 23 December 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new water and sewer connections as part of the M1 Upgrade Project.

 

 

 

.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 52 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Also affected: Surf Avenue

Start date 1: 28 October 2021

End date 1: 23 December 2021

Start date 2: 4 January 2022

End date 2: 27 January 2022

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Waters

Day 48 of 204

Streets affected: Christine Avenue (lane closure with traffic control onsite – expect delays) between Mattocks Road and Tattler Way

 

Also affected: Cassowary Drive, Whistler Drive

Start date: 1 November 2021