Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.

Legend:

unplanned

planned

April 2021

Jump to today
1 Apr - Thursday
Water and sewerage

Unplanned - Water Interruption - Paradise Point

5.40am - 1.00pm

Streets affected: Seaspray Street

Cause: Repair water main

W/O: 20669272

Notif: 1000761098

north

Water and sewerage

Unplanned - Water Interruption Worongary

9.30am - 10.00am

Streets affected: Random Way, Walcoy Place

Cause: Repair water main

W/O. 20669003

Notif. 1000760797

hinterland

Water and sewerage

Unplanned - Water Interruption Labrador

9.45am - 1.45pm

Streets affected: Imperial Parade

Cause: Repair water main

W/O. 20669360

Notif. 1000761159

north

Water and sewerage

Unplanned - Water Interruption Worongary

10.15am - 3.15pm

Streets affected: Random Way, Walcoy Place

Cause: Repair water main

W/O. 20669033

Notif. 1000760797

 

south

Water and sewerage

Unplanned - Water Interruption - Tugun

12.40pm - 5.00pm

Streets affected: Morsehead Street

Cause: Repair water main

W/O: 20669316

Notif: 1000761154

south

Water and sewerage

Unplanned - Water Interruption Robina

1.15pm - 4.15pm

Streets affected: Newport Drive, Oleander Place, Narrabeen Court

Cause: Repair water main

W/O. 20669475

Notif. 1000761342

south

Water and sewerage

Unplanned - Water Interruption - Mudgeeraba / Bonogin

Day 1 of 2

Streets Affected: Hardys Road, Palomino Drive, Idolou Court, Gunsynd Drive, Warrambeen Place, Glenmore Drive, Clansman Court, Stirling Court, Windemere Drive, Saunders Drive, Leyshon Court.

Cause: Water Main Break

W/O 20669526

Notif 1000761414

Show more

Start time and date: 2.15pm, 1 April 2021

End time and date: 3.00am, 2 April 2021

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 88 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 88 of 88

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 4 January 2021

End date: 1 April 2021

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 74 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 71 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 70 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 65 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 63 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 60 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 60 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 53 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 53 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 51 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 46 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 45 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 44 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 42 of 42

Streets affected: Reserve Road (half road closure with traffic control – expect delays) between Heathwood Drive and Weir Drive

Show more

Start date: 18 February 2021

End date: 1 April 2021

Duration: 7pm – 5am

Reason: Undertake falling weight deflectometer (FWD) and ground penetrating radar (GPR) testing under mobile works closure and Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 38 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 38 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Gaven

Day 34 of 35

Streets affected: Smith Street (half road closure with traffic control – expect delays) between Hymix Road overpass and Banyula Drive

Show more

Start date: 26 February 2021

End date: 2 April 2021

Duration: 7pm – 5am

Reason: Undertake geotechnical investigations including drilling and sampling of boreholes by 4WD rig, backfilling and capping to reinstate the road surface.

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 33 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 32 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 25 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 25 of 25

Streets affected: Tweed Street Access Road Only (full road closure local traffic access only) between Miles Street and Garrick Street

Show more

Start date: 8 March 2021

End date: 1 April 2021

Duration: 7am – 5pm

Reason: Installation of new water main

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 25 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 23 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 21 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 18 of 25

Streets affected: Lawrence Drive (full road closure local traffic access only) between Spencer Road and Brendan Drive

Show more

Start date: 14 March 2021

End date: 8 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 17 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 18 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 17 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 15 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 15 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 14 of 14

Streets affected: Cheltenham Drive (Reduced lanes) between Woody Views Way and Botanique Terrace

Show more

Also affected: Robina Town Centre Drive

Start date: 18 March 2021

End date: 1 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Robina

Day 13 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 12 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 11 of 19

Streets affected: Railway Street (half road closure with detour - traffic control on site) between School Street and Link Road

Show more

Also affected: Swan Lane

Start date: 22 March 2021

End date: 1 April 2021

(Contingency dates): 6 April 2021 - 9 April 2021

Duration: 6:30am – 5:30pm

Reason: To facilitate the installation of AGI drains

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 11 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 10 of 11

Streets affected: Armrick Avenue (full road closure local traffic access only) between Surf Parade and roundabout

Show more

Start date: 22 March 2021

End date: 2 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 15

Streets affected: Stanhill Drive (full road closure local traffic access only) between Thomas Drive and Darrambal Street

Show more

Also affected: Tarcoola Crescent

Start date: 26 March 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and road resurfacing works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 7 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 7 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 6 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 5 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 4 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 4 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 3

Streets affected: Old Burleigh Road (footpath/partial lane closure with traffic control – expect delays) between Wharf Road and Fern Street

 

Show more

Start date: 29 March 2021

 

End date: 1 April 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely conduct investigations for the installation of future water meters.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 4 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 9

Streets affected: Via Roma (Reduced lanes) between Remembrance Drive and St Peters Place

Show more

Start date: 30 March 2021

End date: 7 April 2021

Duration 1: Midnight – 5am

Duration 2: 9:30am - 2pm

Reason: To facilitate delivery of girders, unloading and placement of girders on the Western span of the new bridge

south

Road closures

Planned - Temporary Road Closure - Coombabah

Day 3 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 3 of 3

Streets affected: Petrie Street (full road closure local traffic access only) between Eden Avenue and Marine Parade

Show more

Start date: 30 March 2021

End date: 1 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate the crane installation

south

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Carrara, Merrimac, Robina

Day 2 of 2

Areas affected: Carrara, Merrimac, Robina

 

Mosquito/biting midge spraying will be undertaken in these areas on Wednesday 31st March 2021 and Thursday 1st April 2021 from 4am to 6am for control of mosquitos and biting midges (weather permitting).

all regions

Road closures

Planned - Temporary Road Closure - Bilinga

6.30am - 6.30pm

Streets affected: Lang Street (half road closure with detour - traffic control on site) between Golden Four Drive and Pacific Parade

Show more

Start date: 1 April 2021

End date: 1 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a large concrete pour

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

9.00am - 2.00pm

Streets Affected : Hardys Road, Palomino Drive, Idolou Court, Gunsynd Drive, Warrambeen Place, Glenmore Drive, Clansman Court, Stirling Court, Windemere Drive, Saunders Drive, Leyshon Court.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000751843

south

Water and sewerage

Planned - Water Interruption - Surfers Paradise

9.00am - 2.00pm

Streets affected: Old Burleigh Road.

Cause: Water maintenance work

Notification no: 1000745216

Work Order No: 20655851

Objective No: A65082826

 

 

central

 
2 Apr - Friday
Water and sewerage

Unplanned - Water Interruption - Mudgeeraba / Bonogin

Day 2 of 2

Streets Affected: Hardys Road, Palomino Drive, Idolou Court, Gunsynd Drive, Warrambeen Place, Glenmore Drive, Clansman Court, Stirling Court, Windemere Drive, Saunders Drive, Leyshon Court.

Cause: Water Main Break

W/O 20669526

Notif 1000761414

Show more

Start time and date: 2.15pm, 1 April 2021

End time and date: 3.00am, 2 April 2021

south

Water and sewerage

Unplanned - Water Interruption - Tallai

11.40am - 12.40pm

Streets affected: Veronica Drive, Tolhurst Court, Coastview Crescent, Avondale Place, Baileys Road

Cause: Repair water main

W/O: 20667059

Notif: 1000758377

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 89 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 75 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 72 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 71 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 66 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 64 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 61 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 61 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 54 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 54 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 52 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 47 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 46 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 45 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 39 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 39 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Gaven

Day 35 of 35

Streets affected: Smith Street (half road closure with traffic control – expect delays) between Hymix Road overpass and Banyula Drive

Show more

Start date: 26 February 2021

End date: 2 April 2021

Duration: 7pm – 5am

Reason: Undertake geotechnical investigations including drilling and sampling of boreholes by 4WD rig, backfilling and capping to reinstate the road surface.

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 34 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 33 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 26 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 26 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 24 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 22 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 19 of 25

Streets affected: Lawrence Drive (full road closure local traffic access only) between Spencer Road and Brendan Drive

Show more

Start date: 14 March 2021

End date: 8 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 18 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 19 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 18 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 16 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 16 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 14 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 13 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 12 of 19

Streets affected: Railway Street (half road closure with detour - traffic control on site) between School Street and Link Road

Show more

Also affected: Swan Lane

Start date: 22 March 2021

End date: 1 April 2021

(Contingency dates): 6 April 2021 - 9 April 2021

Duration: 6:30am – 5:30pm

Reason: To facilitate the installation of AGI drains

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 12 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 11 of 11

Streets affected: Armrick Avenue (full road closure local traffic access only) between Surf Parade and roundabout

Show more

Start date: 22 March 2021

End date: 2 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 15

Streets affected: Stanhill Drive (full road closure local traffic access only) between Thomas Drive and Darrambal Street

Show more

Also affected: Tarcoola Crescent

Start date: 26 March 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and road resurfacing works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 8 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 8 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 7 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 6 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 5 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 5 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 5 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 9

Streets affected: Via Roma (Reduced lanes) between Remembrance Drive and St Peters Place

Show more

Start date: 30 March 2021

End date: 7 April 2021

Duration 1: Midnight – 5am

Duration 2: 9:30am - 2pm

Reason: To facilitate delivery of girders, unloading and placement of girders on the Western span of the new bridge

south

Road closures

Planned - Temporary Road Closure - Coombabah

Day 4 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Water and sewerage

Planned - Water Interruption - Tallai

9.03am - 2.00pm

Streets Affected : Charles Kurz Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000751845

 

south

 
3 Apr - Saturday
Water and sewerage

Unplanned - Water Interruption - Southport

6.09am - 10.30am

Streets affected: Kindra Avenue, Lara Avenue, Nyora Sreet

Cause: Water Leak

W/O: 20669628

Notif: 1000761514

north

Water and sewerage

Unplanned - Water Interruption - Elanora

9.15am - 10.15am

Streets affected: Nineteenth Avenue

Cause: Water Leak

W/O: 20668167

Notif: 1000759924

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 90 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 76 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 73 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 72 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 67 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 65 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 62 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 62 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 55 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 55 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 53 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 48 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 47 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 46 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 40 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 40 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 35 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 34 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 27 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 27 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 25 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 23 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 20 of 25

Streets affected: Lawrence Drive (full road closure local traffic access only) between Spencer Road and Brendan Drive

Show more

Start date: 14 March 2021

End date: 8 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 19 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 20 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 19 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 17 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 17 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 15 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 14 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 13 of 19

Streets affected: Railway Street (half road closure with detour - traffic control on site) between School Street and Link Road

Show more

Also affected: Swan Lane

Start date: 22 March 2021

End date: 1 April 2021

(Contingency dates): 6 April 2021 - 9 April 2021

Duration: 6:30am – 5:30pm

Reason: To facilitate the installation of AGI drains

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 13 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 15

Streets affected: Stanhill Drive (full road closure local traffic access only) between Thomas Drive and Darrambal Street

Show more

Also affected: Tarcoola Crescent

Start date: 26 March 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and road resurfacing works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 9 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 9 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 8 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 7 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 6 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 6 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 6 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 9

Streets affected: Via Roma (Reduced lanes) between Remembrance Drive and St Peters Place

Show more

Start date: 30 March 2021

End date: 7 April 2021

Duration 1: Midnight – 5am

Duration 2: 9:30am - 2pm

Reason: To facilitate delivery of girders, unloading and placement of girders on the Western span of the new bridge

south

Road closures

Planned - Temporary Road Closure - Coombabah

Day 5 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

 
4 Apr - Sunday
Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 91 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 77 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 74 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 73 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 68 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 66 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 63 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 63 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 56 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 56 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 54 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 49 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 48 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 47 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 41 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 41 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 36 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 35 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 28 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 28 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 26 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 24 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 21 of 25

Streets affected: Lawrence Drive (full road closure local traffic access only) between Spencer Road and Brendan Drive

Show more

Start date: 14 March 2021

End date: 8 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 20 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 21 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 20 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 18 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 18 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 16 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 15 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 14 of 19

Streets affected: Railway Street (half road closure with detour - traffic control on site) between School Street and Link Road

Show more

Also affected: Swan Lane

Start date: 22 March 2021

End date: 1 April 2021

(Contingency dates): 6 April 2021 - 9 April 2021

Duration: 6:30am – 5:30pm

Reason: To facilitate the installation of AGI drains

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 14 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 10 of 15

Streets affected: Stanhill Drive (full road closure local traffic access only) between Thomas Drive and Darrambal Street

Show more

Also affected: Tarcoola Crescent

Start date: 26 March 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and road resurfacing works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 10 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 10 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 9 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 8 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 7 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 7 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 7 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 7 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 7 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 9

Streets affected: Via Roma (Reduced lanes) between Remembrance Drive and St Peters Place

Show more

Start date: 30 March 2021

End date: 7 April 2021

Duration 1: Midnight – 5am

Duration 2: 9:30am - 2pm

Reason: To facilitate delivery of girders, unloading and placement of girders on the Western span of the new bridge

south

Road closures

Planned - Temporary Road Closure - Coombabah

Day 6 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 1 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

 
5 Apr - Monday
Water and sewerage

Unplanned - Water Interruption - Runaway Bay

8.30am - 1.30pm

Streets affected: Joseph Street, Cassia Street

Cause: Repair water main

W/O: 20669644

Notif: 1000761573

north

Water and sewerage

Unplanned - Water Interruption - Worongary

1.30pm - 2.30pm

Streets affected: Virgil Court

Cause: Repair water service

W/O: 20669330

Notif: 1000761116

 

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 92 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 78 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 75 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 74 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 69 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 67 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 64 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 64 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 57 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 57 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 55 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 50 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 49 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 48 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 42 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 42 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 37 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 36 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 29 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 29 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 27 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 25 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 22 of 25

Streets affected: Lawrence Drive (full road closure local traffic access only) between Spencer Road and Brendan Drive

Show more

Start date: 14 March 2021

End date: 8 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 21 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 22 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 21 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 19 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 19 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 17 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 16 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 15 of 19

Streets affected: Railway Street (half road closure with detour - traffic control on site) between School Street and Link Road

Show more

Also affected: Swan Lane

Start date: 22 March 2021

End date: 1 April 2021

(Contingency dates): 6 April 2021 - 9 April 2021

Duration: 6:30am – 5:30pm

Reason: To facilitate the installation of AGI drains

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 15 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 11 of 15

Streets affected: Stanhill Drive (full road closure local traffic access only) between Thomas Drive and Darrambal Street

Show more

Also affected: Tarcoola Crescent

Start date: 26 March 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and road resurfacing works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 11 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 11 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 10 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 9 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 8 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 8 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 8 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 8 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 8 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 9

Streets affected: Via Roma (Reduced lanes) between Remembrance Drive and St Peters Place

Show more

Start date: 30 March 2021

End date: 7 April 2021

Duration 1: Midnight – 5am

Duration 2: 9:30am - 2pm

Reason: To facilitate delivery of girders, unloading and placement of girders on the Western span of the new bridge

south

Road closures

Planned - Temporary Road Closure - Coombabah

Day 7 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 2 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

 
6 Apr - Tuesday
Water and sewerage

Unplanned - Water Interruption - Oxenford

8.45am - 9.30am

Streets affected: Metro Crescent

Cause: Repair water service

W/O: 20650750

Notif: 1000739310

north

Water and sewerage

Unplanned - Water Interruption - Worongary

11.45am - 1.45pm

Streets affected: Newhaven Crescent, Curragh Court 

Cause: Water Leak

W/O: 20669748

Notif: 1000761679

south

Water and sewerage

Unplanned - Water Interruption - Mudgeeraba

4.00pm - 8.00pm

Streets affected: Narrabundah Street

Cause: Water Leak

W/O: 20669995

Notif: 1000761992

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 93 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 79 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 76 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 75 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 70 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 68 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 65 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 65 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 58 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 58 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 56 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 51 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 50 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 49 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 43 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 43 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 38 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 37 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 30 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 30 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 28 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 26 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 23 of 25

Streets affected: Lawrence Drive (full road closure local traffic access only) between Spencer Road and Brendan Drive

Show more

Start date: 14 March 2021

End date: 8 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 22 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 23 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 22 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 20 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 20 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 18 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 17 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 16 of 19

Streets affected: Railway Street (half road closure with detour - traffic control on site) between School Street and Link Road

Show more

Also affected: Swan Lane

Start date: 22 March 2021

End date: 1 April 2021

(Contingency dates): 6 April 2021 - 9 April 2021

Duration: 6:30am – 5:30pm

Reason: To facilitate the installation of AGI drains

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 16 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 12 of 15

Streets affected: Stanhill Drive (full road closure local traffic access only) between Thomas Drive and Darrambal Street

Show more

Also affected: Tarcoola Crescent

Start date: 26 March 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and road resurfacing works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 12 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 12 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 11 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 10 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 9 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 9 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 9 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 9 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 9 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 9

Streets affected: Via Roma (Reduced lanes) between Remembrance Drive and St Peters Place

Show more

Start date: 30 March 2021

End date: 7 April 2021

Duration 1: Midnight – 5am

Duration 2: 9:30am - 2pm

Reason: To facilitate delivery of girders, unloading and placement of girders on the Western span of the new bridge

south

Road closures

Planned - Temporary Road Closure - Coombabah

Day 8 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 3 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 1 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 1 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 1 of 4

Streets affected: Twenty Third Avenue (full road closure local traffic access only) between Gold Coast Highway and End of road

Show more

Start date: 6 April 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate repairs to building

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 1 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 1 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Water and sewerage

Planned - Water Interruption - Tallebudgera Valley

9.00am - 2.00pm

Streets Affected :  Goolabah Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000752237

 

south

Water and sewerage

Planned - Water Interruption - Palm Beach

9.00am - 11.00am

Streets Affected : 1045-1051 Gold Coast Highway.

Causes : Meter replacement

W/O : 52013086

Notif : 1000757231

south

Water and sewerage

Planned - Water Interruption - Miami

9.00am - 2.00pm

Streets affected: Hythe Street

Cause: Water meter replacement

W/O: 52013122

Notif: 1000760321

Objective No: A15393830

south

Water and sewerage

Planned - Water Interruption - Mermaid Beach

Day 1 of 4

Streets affected: 272 - 274  Hedges Ave

Cause: Watermain shutdown

W/O: 52013123

Notif: 1000760716

Objective No: WWS/2021/152

Show more

This main is shutdown from the 6/4 - 9/4 until 3pm

south

Water and sewerage

Planned - Water Interruption - Mermaid Beach

9.00am - 3.00pm

Streets affected: 272 - 274  Hedges Ave

Cause: Watermain shutdown

W/O: 52013123

Notif: 1000760716

Objective No: WWS/2021/152

south

Water and sewerage

Planned - Water Interruption - Palm Beach

11.00am - 1.00pm

Streets Affected : 1187 Gold Coast Highway.

Causes : Meter replacement

W/O : 52013090

Notif : 1000757284

 

south

Water and sewerage

Planned - Water Interruption - Palm Beach

1.00pm - 3.00pm

Streets Affected :  10-12 Thirteenth Avenue

Causes : Meter replacement

W/O : 52013088

Notif : 1000757307

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 1 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

 
7 Apr - Wednesday
Water and sewerage

Unplanned - Water Interruption - Runaway Bay

6.00am - 2.00pm

Streets affected: Poinsettia Avenue, Morala Avenue

Cause: Repair water main

W/O: 20670046

Notif: 1000762044

Note: Water available from water tanker located at the corner of Hyacinth Avenue and Poinsettia Avenue

north

Water and sewerage

Unplanned - Water Interruption - Tallebudgera Valley

9.45am - 11.15am

Streets affected: Wednesday Drive  

Cause: Repair water hydrants

W/O: 60008181

Notif: 1000757866

south

Water and sewerage

Unplanned - Water Interruption - Pimpama

10.45am - 11.45am

Streets affected: Nickel Street

Cause: Water Leak

W/O: 20670094

Notif: 1000762107

north

Water and sewerage

Unplanned - Water Interruption - Nerang

Day 1 of 2

Streets affected: Beaudesert Nerang Road

Cause: Water Leak

W/O: 20670284

Notif: 1000762337

Show more

Start time and date: 4.30pm 7 April 2021

End time and date: 1.30am 8 April 2021

north

Water and sewerage

Unplanned - Water Interruption - Worongary

5.45pm - 8.45pm

Streets affected: Walcoy Place, Random Way

Cause: Water Leak

W/O: 20670494

Notif: 1000762540

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 94 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 80 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 77 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 76 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 71 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 69 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 66 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 66 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 59 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 59 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 57 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 52 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 51 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 50 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 44 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 44 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 39 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 38 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 31 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 31 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 29 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 27 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 24 of 25

Streets affected: Lawrence Drive (full road closure local traffic access only) between Spencer Road and Brendan Drive

Show more

Start date: 14 March 2021

End date: 8 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 23 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 24 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 23 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 21 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 21 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 19 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 18 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 17 of 19

Streets affected: Railway Street (half road closure with detour - traffic control on site) between School Street and Link Road

Show more

Also affected: Swan Lane

Start date: 22 March 2021

End date: 1 April 2021

(Contingency dates): 6 April 2021 - 9 April 2021

Duration: 6:30am – 5:30pm

Reason: To facilitate the installation of AGI drains

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 17 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 13 of 15

Streets affected: Stanhill Drive (full road closure local traffic access only) between Thomas Drive and Darrambal Street

Show more

Also affected: Tarcoola Crescent

Start date: 26 March 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and road resurfacing works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 13 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 13 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 12 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 11 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 10 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 10 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 10 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 10 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 10 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 9

Streets affected: Via Roma (Reduced lanes) between Remembrance Drive and St Peters Place

Show more

Start date: 30 March 2021

End date: 7 April 2021

Duration 1: Midnight – 5am

Duration 2: 9:30am - 2pm

Reason: To facilitate delivery of girders, unloading and placement of girders on the Western span of the new bridge

south

Road closures

Planned - Temporary Road Closure - Coombabah

Day 9 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 4 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 2 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 2 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 2 of 4

Streets affected: Twenty Third Avenue (full road closure local traffic access only) between Gold Coast Highway and End of road

Show more

Start date: 6 April 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate repairs to building

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 2 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 2 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Water and sewerage

Planned - Water Interruption - Mermaid Beach

Day 2 of 4

Streets affected: 272 - 274  Hedges Ave

Cause: Watermain shutdown

W/O: 52013123

Notif: 1000760716

Objective No: WWS/2021/152

Show more

This main is shutdown from the 6/4 - 9/4 until 3pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 2 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 1 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 1 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Water and sewerage

Planned - Water Interruption - Tallebudgera

9.00am - 2.00pm

Streets Affected : Private road off Trees Road, Ronelle Court.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 100752239

 

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 11.00am

Streets Affected :  16 Djerral Avenue,

Causes : Meter replacement

W/O : 52013089

Notif : 1000757355

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

11.00am - 1.00pm

Streets Affected : 184 West Burleigh Road.

Causes : Meter replacement

W/O : 52013087

Notif : 1000757332

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

1.00pm - 3.00pm

Streets Affected :  18 Ramly Drive.

Causes : Meter replacement

W/O : 52013091

Notif : 1000757386

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 1 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

 
8 Apr - Thursday
Water and sewerage

Unplanned - Water Interruption - Nerang

Day 2 of 2

Streets affected: Beaudesert Nerang Road

Cause: Water Leak

W/O: 20670284

Notif: 1000762337

Show more

Start time and date: 4.30pm 7 April 2021

End time and date: 1.30am 8 April 2021

north

Water and sewerage

Unplanned - Water Interruption - Labrador

9.50am - 1.50pm

Streets affected: Imperial Parade

Cause: Repair Water Leak

W/O: 20670469

Estimated Propertys Affected: 40

north

Water and sewerage

Unplanned - Water Interruption - Coolangatta

3.20pm - 5.30pm

Streets affected: Musgrave Street

Cause: Repair water service

W/O 20670964

Notif 1000762947

south

Water and sewerage

Unplanned - Water Interruption - Nerang

5.00pm - 7.00pm

Streets affected: Rovere Street, Acero Court, Castagno Avenue, Platano Avenue

Cause: Repair water service

W/O 20670576

Notif 1000762788

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 95 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 81 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 78 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 77 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 72 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 70 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 67 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 67 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 60 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 60 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 58 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 53 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 52 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 51 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 45 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 45 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 40 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 39 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 32 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 32 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 30 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 28 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 25 of 25

Streets affected: Lawrence Drive (full road closure local traffic access only) between Spencer Road and Brendan Drive

Show more

Start date: 14 March 2021

End date: 8 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 24 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 25 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 24 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 22 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 22 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 20 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 19 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 18 of 19

Streets affected: Railway Street (half road closure with detour - traffic control on site) between School Street and Link Road

Show more

Also affected: Swan Lane

Start date: 22 March 2021

End date: 1 April 2021

(Contingency dates): 6 April 2021 - 9 April 2021

Duration: 6:30am – 5:30pm

Reason: To facilitate the installation of AGI drains

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 18 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 14 of 15

Streets affected: Stanhill Drive (full road closure local traffic access only) between Thomas Drive and Darrambal Street

Show more

Also affected: Tarcoola Crescent

Start date: 26 March 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and road resurfacing works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 14 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 14 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 13 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 12 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 11 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 11 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 11 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 11 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 11 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Coombabah

Day 10 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 5 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 3 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 3 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 3 of 4

Streets affected: Twenty Third Avenue (full road closure local traffic access only) between Gold Coast Highway and End of road

Show more

Start date: 6 April 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate repairs to building

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 3 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 3 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Water and sewerage

Planned - Water Interruption - Mermaid Beach

Day 3 of 4

Streets affected: 272 - 274  Hedges Ave

Cause: Watermain shutdown

W/O: 52013123

Notif: 1000760716

Objective No: WWS/2021/152

Show more

This main is shutdown from the 6/4 - 9/4 until 3pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 3 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 2 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 2 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 2 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Water and sewerage

Planned - Water Interruption - Tallebudgera Valley

9.00am - 2.00pm

Streets Affected : Monday Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 100752241

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 11.00am

Streets Affected :  25 William Banks Drive.

Causes : Meter replacement

W/O : 52013092

Notif : 1000757450

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 11.00am

Streets Affected :  25 William Banks Drive.

Causes : Meter replacement

W/O : 52013092

Notif : 1000757450

south

Water and sewerage

Planned - Water Interruption - Currumbin

9.00am - 2.00pm

Streets affected: 10 Villiers drive

Cause: Water meter replacement

W/O: 52013120

Notif: 1000760355

Objective No: A15393900

south

Water and sewerage

Planned - Water Interruption - Varsity Lakes

11.00am - 1.00pm

Streets Affected :  84 Cumberland Drive.

Causes : Meter replacement

W/O : 52013093

Notif : 1000757469

south

Water and sewerage

Planned - Water Interruption - Varsity Lakes

11.00am - 1.00pm

Streets Affected : 221 Christine Avenue.

Causes : Meter replacement

W/O : 52013094

Notif : 1000757487

south

Water and sewerage

Planned - Water Interruption - Yatala

6.00pm - 11.00pm

Streets affected: 3 Octal Street

Cause: Watermain Shutdown

W/O: 52013078

Notif: 1000755840

Objective No: WWS/2021/101

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 2

Streets affected: Surfers Paradise Boulevard (full road closure with detour/traffic control – expect delays) between Elkhorn Avenue and Cavill Avenue

 

Show more

Start date: 8 April 2021

 

End date: 9 April 2021

 

Duration: 11.00pm-5.00am

 

Reason: Water Service Emergency Works

south

 
9 Apr - Friday
Water and sewerage

Unplanned - Water Interruption - Ashmore

9.40am - 10.40am

Streets affected: Horizon Ave

Cause: Repair Water Leak

W/O: 20669244

Estimated Propertys Affected: 40

north

Water and sewerage

Unplanned - Water Interruption - Upper Coomera

10.44am - 11.44am

Streets affected: Bennett Way

Cause: Repair Water Leak

W/O: 20667312

Estimated Propertys Affected: 20

north

Water and sewerage

Unplanned - Water Interruption - Varsity Lakes

10.45am - 12.45pm

Streets affected: Yodelay Street, St Lucia Court

Cause: Repair water service

W/O: 20670848

Notif: 1000762980

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 96 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 82 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 79 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 78 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 73 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 71 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 68 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 68 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 61 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 61 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 59 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 54 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 53 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 52 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 46 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 46 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 41 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 40 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 33 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 33 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 31 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 29 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 25 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 26 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 25 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 23 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 23 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 21 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 20 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 19 of 19

Streets affected: Railway Street (half road closure with detour - traffic control on site) between School Street and Link Road

Show more

Also affected: Swan Lane

Start date: 22 March 2021

End date: 1 April 2021

(Contingency dates): 6 April 2021 - 9 April 2021

Duration: 6:30am – 5:30pm

Reason: To facilitate the installation of AGI drains

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 19 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 15 of 15

Streets affected: Stanhill Drive (full road closure local traffic access only) between Thomas Drive and Darrambal Street

Show more

Also affected: Tarcoola Crescent

Start date: 26 March 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and road resurfacing works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 15 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 15 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 14 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 13 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 12 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 12 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 12 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 12 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 12 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Coombabah

Day 11 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 6 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 4 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 4 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 4 of 4

Streets affected: Twenty Third Avenue (full road closure local traffic access only) between Gold Coast Highway and End of road

Show more

Start date: 6 April 2021

End date: 9 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate repairs to building

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 4 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 4 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Water and sewerage

Planned - Water Interruption - Mermaid Beach

Day 4 of 4

Streets affected: 272 - 274  Hedges Ave

Cause: Watermain shutdown

W/O: 52013123

Notif: 1000760716

Objective No: WWS/2021/152

Show more

This main is shutdown from the 6/4 - 9/4 until 3pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 4 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 3 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 3 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 3 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 2

Streets affected: Surfers Paradise Boulevard (full road closure with detour/traffic control – expect delays) between Elkhorn Avenue and Cavill Avenue

 

Show more

Start date: 8 April 2021

 

End date: 9 April 2021

 

Duration: 11.00pm-5.00am

 

Reason: Water Service Emergency Works

south

Water and sewerage

Planned - Water Interruption - Tallebudgera

9.00am - 2.00pm

Streets Affected : Keerong Court, Dalwood Court.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 100752244

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 1 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Water and sewerage

Planned - Water Interruption - Miami

9.00am - 11.00am

Streets Affected : 2-4 Mountain View Road

Causes : Meter replacement

W/O : 52013095

Notif : 1000757559

south

Water and sewerage

Planned - Water Interruption - Southport

9.00am - 2.00pm

Streets Affected : Meron Street

Causes : Watermain connection

W/O : 60009000

Notif : 1000760238

Objective: A65377248

north

Water and sewerage

Planned - Water Interruption - Southport

9.00am - 2.00pm

Streets affected: Marine Parade

Cause: Meter replacement

Notification no:1000761926

Work Order No: 52013148

north

Road closures

Planned - Temporary Road Closure - Robina

Day 1 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

 
10 Apr - Saturday
Water and sewerage

Unplanned - Water Interruption - Ormeau Hills

11.15am - 3.00pm

Streets affected: Hollanders Crescent

Cause: Repair water service

W/O: 20668349

Notif: 1000760115

north

Water and sewerage

Unplanned - Water Interruption - Ashmore

12.45pm - 6.00pm

Streets affected: Freda Street, Glass Street

Cause: Repair broken main

W/O 20671489

Notif 1000763561

north

Water and sewerage

Unplanned - Water Interruption - Surfers Paradise

2.00pm - 3.30pm

Streets affected: Illawong Street, Darrambal Street

Cause: Repair broken main

W/O 20671459

Notif 1000763539

north

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 97 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 83 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 80 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 79 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 74 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 72 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 69 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 69 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 62 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 62 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 60 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 55 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 54 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 53 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 47 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 47 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 42 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 41 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 34 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 34 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Southport

Day 32 of 32

Streets affected: Hinze Street (full road closure local traffic access only) between Scarborough Street and Davenport Street

Show more

Start date: 9 March 2021

End date: 10 April 2021

Duration: 6pm – Midnight

Reason: To facilitate aluminium cladding replacement

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 30 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 26 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 27 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 26 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 24 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 24 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 22 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 21 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 20 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 16 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 16 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 15 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Robina

Day 14 of 14

Streets affected: Christine Avenue (full road closure local traffic access only) between Brabham Circuit and Robina Town Centre Drive

Show more

Start date: 27 March 2021

End date: 10 April 2021

Duration: 6pm – 6am

Reason: To safely mill, profile and reseal roadway pavement asphalt

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 13 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 13 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 13 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 13 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 13 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Coombabah

Day 12 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 7 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 5 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 5 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 5 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 5 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 5 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 4 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 4 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 4 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 2 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Robina

Day 2 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

Road closures

Planned - Temporary Road Closure - Clear Island Waters

Day 0 of 1

Streets affected: Robina Parkway (full road closure local traffic access only) between Markeri Street and Gooding Drive

Show more

Also affected: Boowaggan Road

Start date: 10 April 2021

End date: 11 April 2021

Duration: 1pm – 1pm

Reason: To facilitate safe environment for Luke Harrop Triathlon

south

 
11 Apr - Sunday
Water and sewerage

Unplanned - Water Interruption - Varsity Lakes

1.00am - 5.00am

Streets affected: Brier Crescent

Cause: Water Main Repairs

W/O: 20671511

Notif: 1000763588

south

Water and sewerage

Unplanned - Water Interruption - Ashmore

3.20am - 7.00am

Streets affected: Freda Street

Cause: Water Main Repairs

W/O: 20671512

Notif: 1000763589

north

Water and sewerage

Unplanned - Water Interruption - Mudgeeraba

8.30am - 11.30am

Streets : Gold Coast Springbrook Road

Causes : Repair Broken Main

W/O : 20671471

Notif : 1000763546

 

south

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 98 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 84 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 81 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 80 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 75 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 73 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 70 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 70 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 63 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 63 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 61 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 56 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 55 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 54 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 48 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 48 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 43 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 42 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 35 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 35 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 31 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 27 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 28 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 27 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 25 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 25 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 23 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 22 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 21 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 17 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 17 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 16 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 14 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 14 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 14 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 14 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 14 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Coombabah

Day 13 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 8 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 6 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 6 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 6 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 6 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 6 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 5 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 5 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 5 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 3 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Robina

Day 3 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

Road closures

Planned - Temporary Road Closure - Clear Island Waters

1.00pm - 1.00pm

Streets affected: Robina Parkway (full road closure local traffic access only) between Markeri Street and Gooding Drive

Show more

Also affected: Boowaggan Road

Start date: 10 April 2021

End date: 11 April 2021

Duration: 1pm – 1pm

Reason: To facilitate safe environment for Luke Harrop Triathlon

south

 
12 Apr - Today
Water and sewerage

Unplanned - Water Interruption - Ashmore

12.00am - 7.00am

Streets affected: Freda Street

Cause: Water Main Repairs

W/O: 20671516

Notif: 1000763599

north

Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 99 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 85 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 82 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 81 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 76 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 74 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 71 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 71 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 64 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 64 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 62 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 57 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 56 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 55 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 49 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 49 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 44 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 43 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 36 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 36 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 32 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 28 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 29 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 28 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 26 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 26 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 24 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 23 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 22 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 18 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 18 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 17 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 15 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Southport

Day 15 of 15

Streets affected: William Street (full road closure local traffic access only) between Stevens Street and Walton Street

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 15 of 15

Streets affected: Fisher Avenue (full road closure local traffic access only) between Neville Avenue and Brooke Avenue

Show more

Start date: 29 March 2021

End date: 12 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 15 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 15 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Coombabah

Day 14 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 9 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 7 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 7 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 7 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 7 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 7 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 6 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 6 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 6 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 4 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Robina

Day 4 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 1 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 1 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Water and sewerage

Planned - Water Interruption - Currumbin

9.00am - 12.00pm

Streets affected: 6 - 10 Tomewin Street

Cause: Water meter replacement

W/O: 52013121

Notif: 1000760397

Objective No: A15387401

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 2.00pm

Streets Affected : Acanthus Avenue, Symonds Road and Diana Avenue

Causes : Water main renewals

W/O : 60008949

Notif : 1000757549

Objective: A65465261

south

Water and sewerage

Planned - Water Interruption - Miami

9.00am - 2.00pm

Streets affected:Hythe Street

Cause: Meter replacement

Notification no:1000761942

Work Order No: 52013149

south

Water and sewerage

Planned - Water Interruption - Currumbin

12.00pm - 3.00pm

Streets Affected : Teemangum Street

Causes : Meter replacement

W/O : 52013140

Notif : 1000760720

south

 
13 Apr - Tuesday
Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 100 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 86 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 83 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 82 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 77 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 75 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 72 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 72 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 65 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 65 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 63 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 58 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 57 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 56 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 50 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 50 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 45 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 44 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 37 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 37 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 33 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 29 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 30 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 29 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 27 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 27 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 25 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 24 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 23 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 19 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 19 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 18 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 16 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 16 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 16 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Coombabah

Day 15 of 15

Streets affected: Tarni Street (half road closure with detour - traffic control on site) between Esplanade and Citie Drive / Hansford Road

Show more

Start date: 30 March 2021

End date: 13 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 10 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 8 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 8 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 8 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 8 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 8 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 7 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 7 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 7 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 5 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Robina

Day 5 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 2 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 2 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Water and sewerage

Planned - Water Interruption - Highland Park

9.00am - 2.00pm

Streets Affected : Jindabyne Court, Kincaid Drive,

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000756276

south

Water and sewerage

Planned - Water Interruption - Highland Park

9.00am - 2.00pm

Streets Affected : Marlene Court.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000756289

south

Water and sewerage

Planned - Water Interruption - Tugun

9.00am - 12.00pm

Streets Affected : Gold Coast Highway

Causes : Meter replacement

W/O : 52013142

Notif :1000760737

south

Water and sewerage

Planned - Water Interruption - Coolangatta

9.00am - 2.00pm

Streets Affected :  Lanham Street and Dutton Street

Causes : Meter pit rectification work

W/O : 52013155

Notif : 1000762671

 

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 4.00pm

Streets Affected : Hutchinson Street

Causes : Water main connection

W/O : 20668619

Notif : 1000760445

Objective: A65593381

south

Water and sewerage

Planned - Water Interruption - Billinga

12.00pm - 5.00pm

Streets affected: 134 Pacific Parade

Cause: Water meter replacement

W/O: 52013124

Notif: 1000760766

Objective No: A15387465

south

 
14 Apr - Wednesday
Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 101 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 87 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 84 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 83 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 78 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 76 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 73 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 73 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 66 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 66 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 64 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 59 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 58 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 57 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 51 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 51 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 46 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 45 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 38 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 38 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 34 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 30 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 31 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 30 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 28 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 28 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 26 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 25 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 24 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 20 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 20 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 19 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 17 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 17 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 17 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 11 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 9 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 9 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 9 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 9 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 9 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 8 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 8 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 8 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 6 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Robina

Day 6 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 3 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 3 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Water and sewerage

Planned - Water Interruption - Highland Park

9.00am - 2.00pm

Streets Affected : Covery Crescent, Quigan Terrace.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000756283

south

Water and sewerage

Planned - Water Interruption - Coolangatta

9.00am - 12.00pm

Streets Affected :Musgrave Avenue.

Causes : Meter replacement

W/O : 1000760810

Notif : 52013141

south

Water and sewerage

Planned - Water Interruption - Palm Beach

9.00am - 12.00pm

Streets Affected : Gold Coast Highway

Causes : Meter replacement

W/O : 52013157

Notif :1000762825

south

Water and sewerage

Planned - Water Interruption - Coolangatta

12.00pm - 3.00pm

Streets Affected : Musgrave Ave

Causes : Meter replacement

W/O : 52013145

Notif : 1000761862

 

all regions

Water and sewerage

Planned - Water Interruption - Mermaid Waters

1.00pm - 4.00pm

Streets Affected : Sportsman Avenue

Causes : Meter replacement

W/O : 52013158

Notif :1000762854

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 1 of 15

Streets affected: Crusader Way (full road closure local traffic access only) between Weedons Road and Saxon Court

Show more

Also affected: Weedons Road

Start date: 14 April 2021

End date: 28 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

 
15 Apr - Thursday
Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 102 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 88 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 85 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 84 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 79 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 77 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 74 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 74 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 67 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 67 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 65 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 60 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 59 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 58 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 52 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 52 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 47 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 46 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 39 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 39 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 35 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 31 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 32 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 31 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 29 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 29 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 27 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 26 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 25 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 21 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 21 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 20 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 18 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 18 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 18 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 12 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 10 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 10 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 10 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 10 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 10 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 9 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 9 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 9 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 7 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Robina

Day 7 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 4 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 4 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Nerang

Day 2 of 15

Streets affected: Crusader Way (full road closure local traffic access only) between Weedons Road and Saxon Court

Show more

Also affected: Weedons Road

Start date: 14 April 2021

End date: 28 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Water and sewerage

Planned - Water Interruption - Highland Park

9.00am - 2.00pm

Streets Affected : Dewar Court and Kincaid Drive

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000756284

 

south

Water and sewerage

Planned - Water Interruption - Highland Park

9.00am - 2.00pm

Streets Affected :  Androssan Place, RorymorCourt, Macrobert Court.

Causes : Hydrant replacement program

W/O : 60008181291

Notification: 1000756291

south

Water and sewerage

Planned - Water Interruption - Highland Park

9.00am - 2.00pm

Streets Affected :  Androssan Place, RorymorCourt, Macrobert Court.

Causes : Hydrant replacement program

W/O : 60008181291

Notification: 1000756291

south

Water and sewerage

Planned - Water Interruption - Miami

9.00am - 12.00pm

Streets Affected : Bardon Ave

Causes : Meter replacement

W/O : 52013159

Notif :1000762866

 

south

Water and sewerage

Planned - Water Interruption - Coolangatta

12.00pm - 3.00pm

Streets Affected : McLean Street

Causes : Meter replacement

W/O : 52013144

Notif : 1000761805

south

Water and sewerage

Planned - Water Interruption - Coolangatta

12.00pm - 3.00pm

Streets Affected : 54 McLean Street

Causes : Meter replacement

W/O : 52013147

Notif : 1000761798

all regions

Water and sewerage

Planned - Water Interruption - Currumbin Waters

1.00pm - 4.00pm

Streets Affected : Galleon Way

Causes : Meter replacement

W/O : 52013160

Notif :1000763001

south

 
16 Apr - Friday
Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 103 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 89 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 86 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 85 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 80 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 78 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 75 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 75 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 68 of 68

Streets affected: Rifle Range Road (half road closure with traffic control – expect delays) between The Heights Boulevard and Bull Road

Show more

Start date: 8 February 2021

End date: 16 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of shared footpath and kerb and channel replacement

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 68 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 66 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 61 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 60 of 60

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

 

Show more

Start date: 16 February 2021

End date: 16 April 2021

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works.  Further rework required.

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 59 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 53 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 53 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 48 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 47 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 40 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 40 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 36 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closures - Mermaid Beach

Day 32 of 32

Streets affected: Alfred Street (full road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

 

Also affected: Gold Coast Highway (Parking lane/bay, verge/footpath - expect delays) between Seabeach Avenue and Arthur Street

 

Show more

Start date: 15 March 2021

 

End date: 16 April 2021

 

Duration: Midnight to Midnight

 

Reason: Sewer Mains diversion works via an excavated trenching process.

south

Road closures

Planned - Temporary Road Closure - Southport

Day 33 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Miami

Day 32 of 32

Streets affected: Pacific Avenue (Reduced lanes) between Alec Avenue and Pacific Avenue

Show more

Start date: 16 March 2021

End date: 16 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the replacement of kerb and channel

south

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 30 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 30 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 28 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 27 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 26 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 22 of 22

Streets affected: Pearson Road (half road closure with traffic control – expect delays) between Darlington Drive and Alloy Street 

Also affected: Computer Road and Byte Street

 

 

Show more

Start date: 26 March 2021

End date: 16 April 2021

Duration: 8.30am - 2.30pm

Reason: Investigation of boreholes

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 22 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 21 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 19 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 19 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 19 of 19

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Reedmans Road and Curtis Street

Show more

Start date: 29 March 2021

End date: 16 April 2021

Duration: 8:30am – 2:30pm

Reason: Investigation boreholes over two separate shifts between dates

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 13 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 11 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 11 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 11 of 11

Streets affected: Goldmine Road (half road closure with traffic control – expect delays) between Cassius Way and Jonquil Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 11 of 11

Streets affected: Riversdale Road (half road closure with traffic control – expect delays) between Oberon Way and Arizona Street

Show more

Start date: 6 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 11 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 10 of 10

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 10 of 10

Streets affected: Billinghurst Crescent (half road closure with detour - traffic control on site) between Zac Street and Turnbull Drive

Show more

Start date: 7 April 2021

End date: 16 April 2021

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 10 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 8 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Robina

Day 8 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 5 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 5 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Nerang

Day 3 of 15

Streets affected: Crusader Way (full road closure local traffic access only) between Weedons Road and Saxon Court

Show more

Also affected: Weedons Road

Start date: 14 April 2021

End date: 28 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Water and sewerage

Planned - Water Interruption - Worongary

9.00am - 2.00pm

Streets Affected : Leisure Lane

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000756287

south

Water and sewerage

Planned - Water Interruption - Worongary

9.00am - 2.00pm

Streets Affected : Charlz Kurz Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000756293

 

south

Water and sewerage

Planned - Water Interruption - Coolangatta

9.00am - 12.00pm

Streets Affected : Tweed Terrace

Causes : Meter replacement

W/O : 52013146

Notif : 1000761876

south

 
17 Apr - Saturday
Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 104 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 90 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 87 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 86 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 81 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 79 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 76 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 76 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 69 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 67 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 62 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Currumbin

Day 60 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 54 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 54 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 49 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 48 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 41 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 41 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 37 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Southport

Day 34 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 31 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 31 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 29 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 28 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 27 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 23 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 22 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 20 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 20 of 20

Streets affected: Warrungen Way (half road closure with traffic control – expect delays) between Milparinka Terrace and Ashmore Road

Show more

Date 1: 29 March 2021 to 1 April 2021

Date 2: 6 April 2021 to 17 April 2021  (School Holidays)

Duration 1: 9am – 2:30pm

Duration 2: 6:30am - 6:30pm (School Holidays)

Reason: Demolish old footpath and construct new footpath and bus stop

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 14 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 12 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 12 of 12

Streets affected: Cottesloe Drive (Bridge) (reduced lanes) between Rio Vista Boulevard and Oceanic Drive

Show more

Start date: 6 April 2021

End date: 17 April 2021

Duration: 6:30am – 6:30pm

Reason: Remediation works to bridge for support of crossing infrastructure services

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 12 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 11 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 9 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Robina

Day 9 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 6 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 6 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Nerang

Day 4 of 15

Streets affected: Crusader Way (full road closure local traffic access only) between Weedons Road and Saxon Court

Show more

Also affected: Weedons Road

Start date: 14 April 2021

End date: 28 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

 
18 Apr - Sunday
Road closures

Planned - Temporary Road Closure - Palm Beach / Elanora

Day 105 of 178

Streets affected: Palm Beach Avenue (Reduced lanes) between K P McGrath Drive and Philippine Parade

Show more

Also affected: Tahiti Avenue and Katamunda Close

Start date: 4 January 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the installation of temporary signs as part of the M1 Upgrade project

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 91 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Show more

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 88 of 91

Streets affected: Bull Road (half road closure with traffic control – expect delays) between Rifle Range Road and Winchester Crescent

Show more

Start date: 21 January 2021

End date: 21 April 2021

Duration: 6:30am – 6:30pm

Reason: Construction of Pimpama Sports Hub - truck access in and out of site

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 87 of 160

Streets affected: Sarawak Avenue (continuous verge/footpath closure) between Coolgardie Street and Tahiti Avenue

Show more

Start date: 22 January 2021

End date: 30 June 2021

Duration: Midnight – 23:59pm

Reason: M1 Upgrade Project - to facilitate the reconstruction of the road and adjacent footpaths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 82 of 91

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Show more

Start date: 27 January 2021

End date: 27 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 80 of 90

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 29 January 2021

End date: 28 April 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 77 of 150

Streets affected: Guineas Creek Road (Reduced lanes) between Doubleview Drive and Numidia Street

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To safely construct a retaining wall adjacent to the roadway

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 77 of 150

Streets affected: Surfers Avenue (Reduced lanes) between Sunshine Boulevard and Vatakoula Parade

Show more

Start date: 1 February 2021

End date: 30 June 2021

Duration: 6am – 5pm

Reason: To safely construct the signalisation of the intersection Sunshine Boulevard / Surfers Avenue

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 70 of 143

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between Ridgevista Court and Boambee Court

Show more

Start date: 8 February 2021

End date: 30 June 2021

Duration 1: 9am – 2:30pm   (School Days)

Duration 2: 7am - 5:30pm   (Saturdays and School Holidays only)

Reason: The construction of a concrete shared pathway and concrete driveways

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 68 of 141

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between End of road and Elanora Wastewater Treatment Plant

Show more

Start date: 10 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate the construction of new M1 (Pacific Motorway) access

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 63 of 71

Streets affected: Tallebudgera Drive (full road closure local traffic access only) between Diplacus Drive and Melaleuca Drive

Show more

Start date: 15 February 2021

End date: 26 April 2021

Duration: Midnight – 11:59pm

Reason: The Tallebudgera Drive Bridge will be CLOSED to all vehicular traffic for remedial works.  Access for pedestrians and cyclists will be maintained.

south

Road closures

Planned - Temporary Road Closure - Currumbin

Day 61 of 90

Streets affected: Pacific Parade (half road closure with traffic control – expect delays) between Murraba Street and Tomewin Street

Show more

Start date: 17 February 2021

End date: 17 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities and site deliveries at new development

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 55 of 90

Streets affected: Hillside Drive (half road closure with traffic control – expect delays) between Stapylton Jacobs Well Road and End of road

Show more

Also affected: Yellowood Road, De Bortoli Street and Quarry Road

Start date: 22 February 2021

End date: 23 May 2021

Duration: 6pm – 6am

Reason: Constructing an industrial subdivision (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 55 of 128

Streets affected: The Esplanade (shared path) between Twenty Seventh Avenue and Twenty Fifth Avenue

Show more

Start date: 23 February 2021

End date: 30 June 2021

Duration: Midnight – 11:59pm

Reason: Closures to facilitate safe environment during foreshore development

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 50 of 170

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Start date: 27 February 2021

End date: 16 August 2021

Duration: Noon – 1am

Reason: To facilitate safe ingress and egress of patrons attending AFL event at Metricon Stadium

Closure times will vary as per AFL Fixture 2021

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 49 of 89

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Start date: 1 March 2021

End date: 28 May 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 42 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Show more

Start date: 8 March 2021

End date: 8 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 42 of 61

Streets affected: McLaren Road (Reduced lanes) between Lancaster Court and Beltana Way

Show more

Start date: 8 March 2021

End date: 7 May 2021

Duration: 9am – 2pm

Reason: To facilitate replacement of existing traffic island and construction of new concrete footpath

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 38 of 81

Streets affected: Monaco Street (lane, verge - expect delays) between Pacific Boulevard and Rio Vista Boulevard

 

 

 

Show more

Start date: 12 March 2021

 

End date: 31 March 2021

 

Duration: 7.00am - 5.00pm

 

Reason: Refurbishment works to road bridge (Mostly under bridge works)

south

Road closures

Planned - Temporary Road Closure - Southport

Day 35 of 93

Streets affected: Spendlove Avenue (half road closure with traffic control – expect delays) between Tweed Street and Ferry Road

 

Show more

Start date: 15 March 2021

 

End date: 15 June 2021

 

Duration: 6.30am - 6.30pm

 

Reason: For wide deliveries, concrete pours, civil works, crossover construction, service connections, kerb and footpath work. The development is for Spendelove Private Hospital.

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 32 of 93

Streets affected: Paradise Parade (half road closure with traffic control – expect delays) between Swallow Avenue and Plover Avenue

Show more

Start date: 18 March 2021

End date: 18 June 2021

Duration: Midnight – 11:59pm

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 32 of 32

Streets affected: Pappas Way (half road closure with traffic control – expect delays) between Paul Court and Dawnann Court

Show more

Also affected: Paddington Drive

Start date: 18 March 2021

End date: 18 April 2021

Duration 1: 9am – 2:30pm  (18 March to 1 April)

Duration 2: 6:30am - 6:30pm  (6 April to 16 April)

Reason: To facilitate footpath and pedestrian refuge upgrade

north

Road closures

Planned - Temporary Road Closure - Robina

Day 30 of 170

Streets affected: Stadium Drive (half/full road closure with traffic control – expect delays) between Promethean Way and East Lane

Also affected:  Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Show more

Start date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

End date: 19 March 2021, 3 April 2021, 10 April 2021, 23 April 2021, 22 May 2021, 12 June 2021, 20 June 2021, 16 July 2021, 8 August 2021, 19 August 2021, 5 September 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish

 

Reason: Various closures to facilitate advance warning signs and a safe environment for all road users on event days as per submitted Traffic Management Plans and direction of Queensland Police.

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

Day 29 of 32

Streets Affected : WindemereDrive, Stirling Court, Glenrowan Drive.

Causes : Hydrant replacement program

W/O : 60008181

Notif : 1000757866

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 28 of 101

Streets affected: Alto Terrace (full road closure local traffic access only) between Pagan Road and Pagan Road

Show more

Also affected: Kismet Court

Start date: 22 March 2021

End date: 30 June 2021

Duration: 6:30am – 5pm

Reason: To facilitate full width road pavement construction, replacement of kerb and channel and driveways

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 24 of 29

Streets affected: Wardoo Street (Reduced lanes) between Benowa Road and Cotlew Street

Show more

Also affected: Slatyer Avenue

Start date: 26 March 2021

End date: 23 April 2021

Duration: 9am – 2:30pm

Reason: To facilitate the installation of new pram ramps and relocate post of North West corner

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 23 of 32

Streets affected: Soldier Bird Avenue (full road closure with traffic control – expect delays) between Matasha Crescent and Lee Street

 

Also affected: Laon Street

 

 

Show more

Start date: 27 March 2021

 

End date: 27 April 2021

 

Duration: Midnight to 11.59pm

 

Reason:  Excavation and rework to the pavement and road way.

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 21 of 32

Streets affected: Quinns Hill Road East (Reduced lanes) between Stapylton Jacobs Well Road and Woodshed Road

Show more

Start date: 29 March 2021

End date: 29 April 2021

Duration: Midnight – 11:59pm

Reason: To facilitate road widening up to road centre line

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 15 of 26

Streets affected: Lavelle Street (full road closure local traffic access only) between Price Street and Nerang Street

Show more

Start date: 4 April 2021

End date: 29 August 2021

Duration: 2am – 1pm

Reason: To facilitate the safe operation of the Nerang street markets (Sundays Only)

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 13 of 53

Streets affected: Rutledge Street (half road closure with detour - traffic control on site) between Tweed Street and Stapylton Street

Show more

Start date: 6 April 2021

End date: 28 May 2021

Duration: Midnight – 11:59pm

Reason: To facilitate maintenance repair works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 13 of 25

Streets affected: Thrower Drive (half road closure with detour - traffic control on site) between Duringan Street and Sarawak Avenue

Show more

Start date: 6 April 2021

End date: 30 April 2021

Duration: 7pm – 5am

Reason: To facilitate pedestrian crossing upgrade

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 12 of 15

Streets affected: Mortensen Road (full road closure local traffic access only) between Eureka Street and Mortensen Road

Show more

Also affected: Cayuga Street

Start date: 7 April 2021

End date: 21 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 10 of 14

Streets affected: Helensvale Road (half road closure with traffic control – expect delays) between Serenity Boulevard and Halcyon Way

Show more

Start date: 9 April 2021

End date: 22 April 2021

Duration 1: 9am – 2:30pm

Duration 2: 7pm – 5am

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement

north

Road closures

Planned - Temporary Road Closure - Robina

Day 10 of 14

Streets affected: (Reduced lanes/footpath – expect delays) between Laver Drive and Glades Drive

 

Show more

Start date: 9 April 2021

 

End date: 22 April 2021

 

Duration: 9.00am - 2.30pm

 

Reason: Facilitate the replacement of a damaged flood sign.

south

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 7 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park

Day 7 of 12

Areas affected: King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park.

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within Trapping Area 3, King Parrot Reserve, Eagle Heights Conservation Area, Gladrose Reserve, Cloverside Park,  over the period from 7am Monday 12 April 2021 to 11.59pm Friday 23 April 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Nerang

Day 5 of 15

Streets affected: Crusader Way (full road closure local traffic access only) between Weedons Road and Saxon Court

Show more

Also affected: Weedons Road

Start date: 14 April 2021

End date: 28 April 2021

Duration: 7pm – 6am

Reason: To facilitate excavation and resurfacing works

north

Road closures

Planned - Temporary Road Closure - Robina

4.30am - 11.00am

Streets affected: Robina Parkway (Red