Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.

Legend:

unplanned

planned

August 2017

Jump to today
1 Aug - Tuesday
Water and sewerage

Unplanned - Water interruption - Nerang

10.15am - 11.15am

Streets affected: Ogilvie Crescent

Cause: Repair water hydrant

W/O: 20341803

Notif: 1000368674

central

Water and sewerage

Unplanned - Water interruption - Elanora

10.40am - 12.10pm

Streets affected: Applecross Way, Dianelia Court

Cause: Repair water main

W/O: 20337938

Notif: 1000364051

south

Water and sewerage

Unplanned - Water interruption - Hope Island

11.45am - 12.45pm

Streets affected: Boykambil Esplanade, Coombe Avenue, Shoe Street

Cause: Repair water hydrant

W/O: 20341322

Notif: 1000368117

north

Water and sewerage

Unplanned - Water Interruption - Maudsland

2.00pm - 3.00pm

Streets affected: Ginger Rogers Road, Gene Kelly Court, Capone Court, Gatsby Place

Cause: Repair water hydrant

W/O: 20342308

Notif: 1000369295

central

Water and sewerage

Unplanned - Water interruption - Burleigh Heads

10.00pm - 11.00pm

Streets affected: Acanthus Avenue

Cause: Water Leak

W/O: 20342288

south

Road closures

Planned - Road closure - Tugun

Day 275 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 162 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Arundel

Day 135 of 135

Streets affected: Napper Road and Arundel Drive Intersection (single lane closures of a multi-lane road - at least one lane in both directions along Napper Road to be trafficable at all times) between Chichester Drive and Woodlands Way

Show more

Start date: 20 March 2017

End date: 1 August 2017

Duration: 6:30am - 5pm

Reason: Install Traffic Lights

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 57 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 50 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 23 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 19 of 22

Streets affected: Sarawak Avenue (lane closure) between Pacific Motorway Off Ramp and Tahiti Avenue

Show more

Start date: 14 July 2017

End date: 4 August 2017

1 day only between dates                  

Duration: 6am - 3pm

Reason: WM Replacement

south

Road closures

Planned - Temporary Road Closure Southport

Day 16 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 16 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 16 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 16 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 15 of 18

Streets affected: Sarawak Avenue (lane closure) between Pacific Motorway off ramp and Tahiti Avenue

Show more

Start date: 18 July 2017

End date: 4 August 2017

1 day only between dates                  

Duration: 6.30am - 3pm

Reason: Water main replacement

south

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 15

Streets affected: Kirribilli Court (full road closure local traffic access only) between Sandringham Drive and Cul-de-sac

Show more

Start date: 18 July 2017

End date: 1 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 15

Streets affected: Harbord Court (full road closure local traffic access only) between Sandringham Drive and Cul-de-sac

Show more

Start date: 18 July 2017

End date: 1 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 15

Streets affected: La Perouse Court (full road closure local traffic access only) between Manly Drive and the Cul-de-sac

Show more

Start date: 18 July 2017

End date: 1 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 15

Streets affected: Cremorne Court (full road closure local traffic access only) between Sandringham Drive and the Cul-de-sac

Show more

Start date: 18 July 2017

End date: 1 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Nerang

Day 15 of 15

Streets affected: Nerang River Drive (half road closure with hold and release for 2 minutes maximum) between Birribi Avenue and the Cul-de-sac

Show more

Start date: 18 July 2017

End date: 1 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 15 of 18

Streets affected: Lanham Street and Dutton Street (half road closure with hold and release for 2 minutes maximum) between McLean Street / Dutton Street and Dixon Street and Lanham Street

Show more

Start date: 18 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Water main replacement

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 14 of 22

Streets affected: Galleon Way (half road closure with hold and release for 2 minutes maximum) between Ware Drive and Beaumont Court

Show more

Start date: 19 July 2017

End date: 9 August 2017

Duration: 6.30am - 5pm

Reason: Truck egress and ingress for sewerage pump station storage

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 14 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 15

Streets affected: Ferny Avenue (lane closure) between Caville Avenue and Elkhorn Avenue

Show more

Start date: 19 July 2017

End date: 3 August 2017

1 day only between dates                  

Duration: 8pm - 5am

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Carrara

Day 13 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 19

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Elizabeth Avenue and Australia Avenue

Show more

Start date: 21 July 2017

End date: 8 August 2017

Duration: 6.30am - 5.30pm

Reason: Upgrade of pedestrian signals, crossing and footpath upgrade

south

Road closures

Planned - Temporary Road Closure Nerang

Day 12 of 15

Streets affected: Strauss Court (full road closure local traffic access only) between Gershwin Court and End of cul-de-sac

Show more

Start date: 21 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Paradise Point

Day 12 of 15

Streets affected: The Esplanade (half road closure with hold and release for 2 minutes maximum) between Mallard Avenue and Elder Avenue

Show more

Start date: 21 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Refurbish and reline sewer line

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 9 of 12

Streets affected: Vaughan Drive (half road closure with hold and release for 2 minutes maximum) between Healy Court and Peachey Road

Show more

Start date: 24 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 15

Streets affected: Gold Coast Highway  (lane closure) between Second Avenue and Armrick Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

1 day only between dates                  

Duration: 7am - 3pm

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 14

Streets affected: Britannia Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Surf Parade

Show more

Start date: 24 July 2017

End date: 7 August 2017

Duration: 6pm - 6am

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 14

Streets affected: Gold Coast Highway (lane closure) between Rosewood Avenue and Chelsea Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

2-3 days only between dates                  

Duration: 6.30pm - 6am

Reason: Manhole refurbishment

    

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 8 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 6 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 6 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 2 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 2 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 2 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 2 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Water and sewerage

Planned - Water interruption - Arundel

9.00pm - 3.00am

Streets affected: Gold Coast Highway between Arundel Drive and Computer Street, Technology Drive, Harrington Street

Cause: Repair water leak

W/O: 20334321

Notif: 1000359655

Show more

Start time and date: 9.00pm, 31 July 2017

End time and date: 3.00am, 1 August 2017

central

Water and sewerage

Planned - Water interruption - Mermaid Waters

9.00am - 2.00pm

Streets affected: Santa Cruz Boulevard, Montserrat Court

Cause: Replace hydrant

Ispot: 63308651

W/O: 60003137

Notif: 1000367061

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 5

Streets affected: Markeri Street (lane closure) between Ron Penhaligon Way and Yarraville Street

 

Show more

Start date: 1 August 2017

End date: 5 August 2017

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Upgrade to bus stop

south

Road closures

Planned - Temporary Road Closure Nerang

Day 1 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 1 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 1 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Water and sewerage

Planned - Water Interruption - Southport

Day 1 of 2

Streets affected: Olsen Avenue between Enterprise Street and Soutport Nerang Road both sides of Olsen Avenue

Cause: Hydrant works

Ispot: 63359768

W/O: 60003893

Notif: 1000368125

Show more

Start time and date: 7.00pm, 1 August 2017

End time and date: 2.00am, 2 August 2017

central

Water and sewerage

Planned - Water interruption - Broadbeach - Burleigh Heads

Day 1 of 2

Streets affected: T E Peters Drive south on Gold Coast Highway to Sixth Avenue

Cause:  Hydrant maintenance and Assessments

Ispot : #63395120

Note : Gold Coast Water crew and Traffic Controllers on site

Show more

Start time and date: 8.30pm, 1 August 2017

End time and date: 5.00am, 2 August 2017

central

 
2 Aug - Wednesday
Water and sewerage

Unplanned - Water Interruption - Southport

11.35am - 1.35pm

Streets affected: Mabel Street

Cause: Repair water main

W/O: 20340441

Notif: 100367053

central

Road closures

Planned - Road closure - Tugun

Day 276 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 163 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 58 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 51 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 24 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 20 of 22

Streets affected: Sarawak Avenue (lane closure) between Pacific Motorway Off Ramp and Tahiti Avenue

Show more

Start date: 14 July 2017

End date: 4 August 2017

1 day only between dates                  

Duration: 6am - 3pm

Reason: WM Replacement

south

Road closures

Planned - Temporary Road Closure Southport

Day 17 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 17 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 17 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 17 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 16 of 18

Streets affected: Sarawak Avenue (lane closure) between Pacific Motorway off ramp and Tahiti Avenue

Show more

Start date: 18 July 2017

End date: 4 August 2017

1 day only between dates                  

Duration: 6.30am - 3pm

Reason: Water main replacement

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 16 of 18

Streets affected: Lanham Street and Dutton Street (half road closure with hold and release for 2 minutes maximum) between McLean Street / Dutton Street and Dixon Street and Lanham Street

Show more

Start date: 18 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Water main replacement

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 15 of 22

Streets affected: Galleon Way (half road closure with hold and release for 2 minutes maximum) between Ware Drive and Beaumont Court

Show more

Start date: 19 July 2017

End date: 9 August 2017

Duration: 6.30am - 5pm

Reason: Truck egress and ingress for sewerage pump station storage

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 15 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 15

Streets affected: Ferny Avenue (lane closure) between Caville Avenue and Elkhorn Avenue

Show more

Start date: 19 July 2017

End date: 3 August 2017

1 day only between dates                  

Duration: 8pm - 5am

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Carrara

Day 14 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 19

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Elizabeth Avenue and Australia Avenue

Show more

Start date: 21 July 2017

End date: 8 August 2017

Duration: 6.30am - 5.30pm

Reason: Upgrade of pedestrian signals, crossing and footpath upgrade

south

Road closures

Planned - Temporary Road Closure Nerang

Day 13 of 15

Streets affected: Strauss Court (full road closure local traffic access only) between Gershwin Court and End of cul-de-sac

Show more

Start date: 21 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Paradise Point

Day 13 of 15

Streets affected: The Esplanade (half road closure with hold and release for 2 minutes maximum) between Mallard Avenue and Elder Avenue

Show more

Start date: 21 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Refurbish and reline sewer line

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 10 of 12

Streets affected: Vaughan Drive (half road closure with hold and release for 2 minutes maximum) between Healy Court and Peachey Road

Show more

Start date: 24 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 15

Streets affected: Gold Coast Highway  (lane closure) between Second Avenue and Armrick Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

1 day only between dates                  

Duration: 7am - 3pm

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 14

Streets affected: Britannia Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Surf Parade

Show more

Start date: 24 July 2017

End date: 7 August 2017

Duration: 6pm - 6am

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 14

Streets affected: Gold Coast Highway (lane closure) between Rosewood Avenue and Chelsea Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

2-3 days only between dates                  

Duration: 6.30pm - 6am

Reason: Manhole refurbishment

    

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 9 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 7 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 7 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 3 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 3 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 3 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 3 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 5

Streets affected: Markeri Street (lane closure) between Ron Penhaligon Way and Yarraville Street

 

Show more

Start date: 1 August 2017

End date: 5 August 2017

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Upgrade to bus stop

south

Road closures

Planned - Temporary Road Closure Nerang

Day 2 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 2 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 2 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Water and sewerage

Planned - Water Interruption - Southport

Day 2 of 2

Streets affected: Olsen Avenue between Enterprise Street and Soutport Nerang Road both sides of Olsen Avenue

Cause: Hydrant works

Ispot: 63359768

W/O: 60003893

Notif: 1000368125

Show more

Start time and date: 7.00pm, 1 August 2017

End time and date: 2.00am, 2 August 2017

central

Water and sewerage

Planned - Water interruption - Broadbeach - Burleigh Heads

Day 2 of 2

Streets affected: T E Peters Drive south on Gold Coast Highway to Sixth Avenue

Cause:  Hydrant maintenance and Assessments

Ispot : #63395120

Note : Gold Coast Water crew and Traffic Controllers on site

Show more

Start time and date: 8.30pm, 1 August 2017

End time and date: 5.00am, 2 August 2017

central

Road closures

Planned - Temporary Road Closure Yatala

Day 1 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 1 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 1 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 1 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 1 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Tugun

Day 1 of 8

Streets affected: Kitchener Street (half road closure with hold and release for 2 minutes maximum) between Monash Street and Coolara Street

 

Show more

Start date: 2 August 2017

End date: 9 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Yatala

Day 1 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 1 of 3

Streets affected: Scott Street, Dixon Street, Lanham Street and McLean Street (half road closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 2 August 2017

End date: 4 August 2017

Duration: 7pm - 5am

Reason: Water Main Replacement

south

Water and sewerage

Planned - Water interruption - Burleigh Heads - Broadbeach

Day 1 of 2

Streets affected: Sixth Avenue north on Gold Coast Highway to T E Peters Drive

Cause:  Hydrant maintenance and Assessments

Note : Gold Coast Water crew and Traffic Controllers on site

Show more

Start time and date: 8.30pm, 2 August 2017

End time and date: 5.00am, 3 August 2017

south

Water and sewerage

Planned - Water interruption - Coolangatta

Day 1 of 2

Streets affected: Scott Street, Warner Street, Dixon Street, Warrawong Street, Carmichael Close

Cause: Maintenance work on water main

Ispot: 63291959

W/O: 60003660

Notif: 1000354758

Show more

Start time and date: 10.00pm, 2 August 2017

End time and date: 5.00am, 3 August 2017

south

 
3 Aug - Thursday
Water and sewerage

Unplanned - Water interruption - Worongary

9.15am - 10.15am

Streets affected: Keryn Close , Thredbo Drive

Cause: Repair water main

W/O: 20343221

Notif: 1000370433

south

Water and sewerage

Unplanned - Water interruption - Southport

9.25am - 12.25pm

Streets affected: Petersen Avenue

Cause: Repair water main

W/O: 20340362

Notif: 1000366931

central

Water and sewerage

Unplanned - Water Interruption - Southport

10.50am - 11.35am

Streets affected: Worendo Street

Cause: Repair water meter

W/O: 20342860

Notif: 1000369881

central

Water and sewerage

Unplanned - Water interruption - Robina

11.40am - 1.40pm

Streets affected: Concord Circuit

Cause: Repair water main

W/O: 20339231

Notif: 1000365634

south

Water and sewerage

Unplanned - Water interruption - Tallebudgera Valley - Cancelled

12.00pm - 1.00pm

Streets affected: Tallebugera Creek Road

Cause: Repair water main

W/O: 20342201

Notif: 1000369197

south

Water and sewerage

Unplanned - Water interruption - Robina

12.30pm - 1.30pm

Streets affected: Outrigger Drive, Castaway Court, Hancox Place

Cause: Repair water hydrant

W/O: 20339181

Notif: 1000365589

south

Water and sewerage

Unplanned - Water interruption - Clear Island Waters

2.10pm - 3.40pm

Streets affected: Martingale Court

Cause: Repair water main

W/O: 20280689

Notif: 1000293041

south

Water and sewerage

Unplanned - Water Interruption - Broadbeach

10.00pm - 11.00pm

Streets affected: Surf Parade

Cause: Repair hydrant

W/O: 20343339

Notif: 1000370592

central

Road closures

Planned - Road closure - Tugun

Day 277 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 164 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 59 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 52 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 25 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 21 of 22

Streets affected: Sarawak Avenue (lane closure) between Pacific Motorway Off Ramp and Tahiti Avenue

Show more

Start date: 14 July 2017

End date: 4 August 2017

1 day only between dates                  

Duration: 6am - 3pm

Reason: WM Replacement

south

Road closures

Planned - Temporary Road Closure Southport

Day 18 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 18 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 18 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 18 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 17 of 18

Streets affected: Sarawak Avenue (lane closure) between Pacific Motorway off ramp and Tahiti Avenue

Show more

Start date: 18 July 2017

End date: 4 August 2017

1 day only between dates                  

Duration: 6.30am - 3pm

Reason: Water main replacement

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 17 of 18

Streets affected: Lanham Street and Dutton Street (half road closure with hold and release for 2 minutes maximum) between McLean Street / Dutton Street and Dixon Street and Lanham Street

Show more

Start date: 18 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Water main replacement

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 16 of 22

Streets affected: Galleon Way (half road closure with hold and release for 2 minutes maximum) between Ware Drive and Beaumont Court

Show more

Start date: 19 July 2017

End date: 9 August 2017

Duration: 6.30am - 5pm

Reason: Truck egress and ingress for sewerage pump station storage

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 16 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 15

Streets affected: Ferny Avenue (lane closure) between Caville Avenue and Elkhorn Avenue

Show more

Start date: 19 July 2017

End date: 3 August 2017

1 day only between dates                  

Duration: 8pm - 5am

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Carrara

Day 15 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 14 of 19

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Elizabeth Avenue and Australia Avenue

Show more

Start date: 21 July 2017

End date: 8 August 2017

Duration: 6.30am - 5.30pm

Reason: Upgrade of pedestrian signals, crossing and footpath upgrade

south

Road closures

Planned - Temporary Road Closure Nerang

Day 14 of 15

Streets affected: Strauss Court (full road closure local traffic access only) between Gershwin Court and End of cul-de-sac

Show more

Start date: 21 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Paradise Point

Day 14 of 15

Streets affected: The Esplanade (half road closure with hold and release for 2 minutes maximum) between Mallard Avenue and Elder Avenue

Show more

Start date: 21 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Refurbish and reline sewer line

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 11 of 12

Streets affected: Vaughan Drive (half road closure with hold and release for 2 minutes maximum) between Healy Court and Peachey Road

Show more

Start date: 24 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 15

Streets affected: Gold Coast Highway  (lane closure) between Second Avenue and Armrick Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

1 day only between dates                  

Duration: 7am - 3pm

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 14

Streets affected: Britannia Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Surf Parade

Show more

Start date: 24 July 2017

End date: 7 August 2017

Duration: 6pm - 6am

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 14

Streets affected: Gold Coast Highway (lane closure) between Rosewood Avenue and Chelsea Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

2-3 days only between dates                  

Duration: 6.30pm - 6am

Reason: Manhole refurbishment

    

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 10 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 8 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 8 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 4 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 4 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 4 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 4 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 5

Streets affected: Markeri Street (lane closure) between Ron Penhaligon Way and Yarraville Street

 

Show more

Start date: 1 August 2017

End date: 5 August 2017

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Upgrade to bus stop

south

Road closures

Planned - Temporary Road Closure Nerang

Day 3 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 3 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 3 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 2 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 2 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 2 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 2 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 2 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Tugun

Day 2 of 8

Streets affected: Kitchener Street (half road closure with hold and release for 2 minutes maximum) between Monash Street and Coolara Street

 

Show more

Start date: 2 August 2017

End date: 9 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Yatala

Day 2 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 2 of 3

Streets affected: Scott Street, Dixon Street, Lanham Street and McLean Street (half road closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 2 August 2017

End date: 4 August 2017

Duration: 7pm - 5am

Reason: Water Main Replacement

south

Water and sewerage

Planned - Water interruption - Burleigh Heads - Broadbeach

Day 2 of 2

Streets affected: Sixth Avenue north on Gold Coast Highway to T E Peters Drive

Cause:  Hydrant maintenance and Assessments

Note : Gold Coast Water crew and Traffic Controllers on site

Show more

Start time and date: 8.30pm, 2 August 2017

End time and date: 5.00am, 3 August 2017

south

Water and sewerage

Planned - Water interruption - Coolangatta

Day 2 of 2

Streets affected: Scott Street, Warner Street, Dixon Street, Warrawong Street, Carmichael Close

Cause: Maintenance work on water main

Ispot: 63291959

W/O: 60003660

Notif: 1000354758

Show more

Start time and date: 10.00pm, 2 August 2017

End time and date: 5.00am, 3 August 2017

south

Water and sewerage

Planned - Water interruption - Pimpama

9.00am - 2.00pm

Streets affected: Wharf Street, Fountain Street

Cause: New connection to water main

Ispot: 62555270

W/O: 52008939

Notif: 1000354231

north

Water and sewerage

Planned - Water interruption - Miami

9.00am - 2.00pm

Streets affected: Pacific Avenue, Alec Avenue between Pacific Avenue and Kallay Street

Cause: Replace water hydrants

Ispot: 63308702

W/O: 60003137

Notif: 1000367084

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 1 of 9

Streets affected: Coolangatta Road (half road closure with hold and release for 2 minutes maximum) between Lord Street and Haig Street

 

Show more

Start date: 3 August 2017

End date: 11 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Maudsland

Day 1 of 3

Streets affected: Birds Road (lane closure) between Maudsland Road and Abbort Court

Show more

Start date: 3 August 2017

End date: 5 August 2017

1 day only between dates                  

Duration: 8pm - 6am

Reason: Coarsway Repairs

north

Water and sewerage

Planned - Water interruption - Broadbeach

Day 1 of 2

Streets affected: Margaret Avenue, Surf Parade, Mary Avenue

Cause: Replace water valve

Ispot: 63351860

W/O: 60003875

Notif: 1000368446

Show more

Start time and date: 10.00pm, 3 August 2017

End time and date: 5.00am, 4 August 2017

central

Water and sewerage

Planned - Water interruption - Coolangatta

Day 1 of 2

Streets affected: Lanham Street, Tweed Street, Dutton Street, Mclean Street

Cause: Maintenance work on water main

Ispot: 63291804

W/O: 60003660

Noti : 1000354758

Show more

Start time and date: 10.00pm, 3 August 2017

End time and date: 5.00am, 4 August 2017

south

 
4 Aug - Friday
Water and sewerage

Unplanned - Water Interruption - Tallebudgera Valley

11.00am - 5.00pm

Streets affected: Tallebudgera Creek Road, Plaza Street

Cause: Repair water meter

W/O: 20342618

Notif: 1000369696

south

Road closures

Planned - Road closure - Tugun

Day 278 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 165 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 60 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 53 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 26 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 22 of 22

Streets affected: Sarawak Avenue (lane closure) between Pacific Motorway Off Ramp and Tahiti Avenue

Show more

Start date: 14 July 2017

End date: 4 August 2017

1 day only between dates                  

Duration: 6am - 3pm

Reason: WM Replacement

south

Road closures

Planned - Temporary Road Closure Southport

Day 19 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 19 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 19 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 19 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 18 of 18

Streets affected: Sarawak Avenue (lane closure) between Pacific Motorway off ramp and Tahiti Avenue

Show more

Start date: 18 July 2017

End date: 4 August 2017

1 day only between dates                  

Duration: 6.30am - 3pm

Reason: Water main replacement

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 18 of 18

Streets affected: Lanham Street and Dutton Street (half road closure with hold and release for 2 minutes maximum) between McLean Street / Dutton Street and Dixon Street and Lanham Street

Show more

Start date: 18 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Water main replacement

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 17 of 22

Streets affected: Galleon Way (half road closure with hold and release for 2 minutes maximum) between Ware Drive and Beaumont Court

Show more

Start date: 19 July 2017

End date: 9 August 2017

Duration: 6.30am - 5pm

Reason: Truck egress and ingress for sewerage pump station storage

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 17 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 16 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 15 of 19

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Elizabeth Avenue and Australia Avenue

Show more

Start date: 21 July 2017

End date: 8 August 2017

Duration: 6.30am - 5.30pm

Reason: Upgrade of pedestrian signals, crossing and footpath upgrade

south

Road closures

Planned - Temporary Road Closure Nerang

Day 15 of 15

Streets affected: Strauss Court (full road closure local traffic access only) between Gershwin Court and End of cul-de-sac

Show more

Start date: 21 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Paradise Point

Day 15 of 15

Streets affected: The Esplanade (half road closure with hold and release for 2 minutes maximum) between Mallard Avenue and Elder Avenue

Show more

Start date: 21 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Refurbish and reline sewer line

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 12 of 12

Streets affected: Vaughan Drive (half road closure with hold and release for 2 minutes maximum) between Healy Court and Peachey Road

Show more

Start date: 24 July 2017

End date: 4 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 15

Streets affected: Gold Coast Highway  (lane closure) between Second Avenue and Armrick Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

1 day only between dates                  

Duration: 7am - 3pm

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 14

Streets affected: Britannia Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Surf Parade

Show more

Start date: 24 July 2017

End date: 7 August 2017

Duration: 6pm - 6am

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 14

Streets affected: Gold Coast Highway (lane closure) between Rosewood Avenue and Chelsea Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

2-3 days only between dates                  

Duration: 6.30pm - 6am

Reason: Manhole refurbishment

    

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 11 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 9 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 9 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 5 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 5 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 5 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 5 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Robina

Day 4 of 5

Streets affected: Markeri Street (lane closure) between Ron Penhaligon Way and Yarraville Street

 

Show more

Start date: 1 August 2017

End date: 5 August 2017

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Upgrade to bus stop

south

Road closures

Planned - Temporary Road Closure Nerang

Day 4 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 4 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 4 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 3 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 3 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 3 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 3 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 3 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Tugun

Day 3 of 8

Streets affected: Kitchener Street (half road closure with hold and release for 2 minutes maximum) between Monash Street and Coolara Street

 

Show more

Start date: 2 August 2017

End date: 9 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Yatala

Day 3 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 3 of 3

Streets affected: Scott Street, Dixon Street, Lanham Street and McLean Street (half road closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 2 August 2017

End date: 4 August 2017

Duration: 7pm - 5am

Reason: Water Main Replacement

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 2 of 9

Streets affected: Coolangatta Road (half road closure with hold and release for 2 minutes maximum) between Lord Street and Haig Street

 

Show more

Start date: 3 August 2017

End date: 11 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Maudsland

Day 2 of 3

Streets affected: Birds Road (lane closure) between Maudsland Road and Abbort Court

Show more

Start date: 3 August 2017

End date: 5 August 2017

1 day only between dates                  

Duration: 8pm - 6am

Reason: Coarsway Repairs

north

Water and sewerage

Planned - Water interruption - Broadbeach

Day 2 of 2

Streets affected: Margaret Avenue, Surf Parade, Mary Avenue

Cause: Replace water valve

Ispot: 63351860

W/O: 60003875

Notif: 1000368446

Show more

Start time and date: 10.00pm, 3 August 2017

End time and date: 5.00am, 4 August 2017

central

Water and sewerage

Planned - Water interruption - Coolangatta

Day 2 of 2

Streets affected: Lanham Street, Tweed Street, Dutton Street, Mclean Street

Cause: Maintenance work on water main

Ispot: 63291804

W/O: 60003660

Noti : 1000354758

Show more

Start time and date: 10.00pm, 3 August 2017

End time and date: 5.00am, 4 August 2017

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 1 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Water and sewerage

Planned - Water interruption - Ormeau

9.00am - 2.00pm

Streets affected: Goldmine Road, Minka Lane, Cassius Way, Badila Avenue

Cause: New water main connection

Ispot: 63384519

W/O: 52009137

Notif: 1000365383

north

 
5 Aug - Saturday
Road closures

Planned - Road closure - Tugun

Day 279 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 166 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 61 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 54 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 27 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 20 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 20 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 20 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 20 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 18 of 22

Streets affected: Galleon Way (half road closure with hold and release for 2 minutes maximum) between Ware Drive and Beaumont Court

Show more

Start date: 19 July 2017

End date: 9 August 2017

Duration: 6.30am - 5pm

Reason: Truck egress and ingress for sewerage pump station storage

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 18 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 17 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 16 of 19

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Elizabeth Avenue and Australia Avenue

Show more

Start date: 21 July 2017

End date: 8 August 2017

Duration: 6.30am - 5.30pm

Reason: Upgrade of pedestrian signals, crossing and footpath upgrade

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 15

Streets affected: Gold Coast Highway  (lane closure) between Second Avenue and Armrick Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

1 day only between dates                  

Duration: 7am - 3pm

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 14

Streets affected: Britannia Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Surf Parade

Show more

Start date: 24 July 2017

End date: 7 August 2017

Duration: 6pm - 6am

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 14

Streets affected: Gold Coast Highway (lane closure) between Rosewood Avenue and Chelsea Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

2-3 days only between dates                  

Duration: 6.30pm - 6am

Reason: Manhole refurbishment

    

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 12 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 10 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 10 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 9 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 6 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 6 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 6 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 6 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Robina

Day 5 of 5

Streets affected: Markeri Street (lane closure) between Ron Penhaligon Way and Yarraville Street

 

Show more

Start date: 1 August 2017

End date: 5 August 2017

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Upgrade to bus stop

south

Road closures

Planned - Temporary Road Closure Nerang

Day 5 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 5 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 5 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 4 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 4 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 4 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 4 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 4 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Tugun

Day 4 of 8

Streets affected: Kitchener Street (half road closure with hold and release for 2 minutes maximum) between Monash Street and Coolara Street

 

Show more

Start date: 2 August 2017

End date: 9 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Yatala

Day 4 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 3 of 9

Streets affected: Coolangatta Road (half road closure with hold and release for 2 minutes maximum) between Lord Street and Haig Street

 

Show more

Start date: 3 August 2017

End date: 11 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Maudsland

Day 3 of 3

Streets affected: Birds Road (lane closure) between Maudsland Road and Abbort Court

Show more

Start date: 3 August 2017

End date: 5 August 2017

1 day only between dates                  

Duration: 8pm - 6am

Reason: Coarsway Repairs

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 2 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Water and sewerage

Planned - Water interruption - Runaway Bay

9.00am - 2.00pm

Streets affected: Bayview Street

Cause: Replace water hydrants

Ispot: 63308802

W/O: 60003137

Notif: 1000367098

north

 
6 Aug - Sunday
Water and sewerage

Unplanned - Water Interruption - Tugan

10.00am - 11.00am

Streets affected: Coolangatta Road

Cause: Water service repairs

W/O: 20343123

Notif: 1000370285

south

Road closures

Planned - Road closure - Tugun

Day 280 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 167 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 62 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 55 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 28 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 21 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 21 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 21 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 21 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 19 of 22

Streets affected: Galleon Way (half road closure with hold and release for 2 minutes maximum) between Ware Drive and Beaumont Court

Show more

Start date: 19 July 2017

End date: 9 August 2017

Duration: 6.30am - 5pm

Reason: Truck egress and ingress for sewerage pump station storage

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 19 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 18 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 17 of 19

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Elizabeth Avenue and Australia Avenue

Show more

Start date: 21 July 2017

End date: 8 August 2017

Duration: 6.30am - 5.30pm

Reason: Upgrade of pedestrian signals, crossing and footpath upgrade

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 14 of 15

Streets affected: Gold Coast Highway  (lane closure) between Second Avenue and Armrick Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

1 day only between dates                  

Duration: 7am - 3pm

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 14

Streets affected: Britannia Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Surf Parade

Show more

Start date: 24 July 2017

End date: 7 August 2017

Duration: 6pm - 6am

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 14

Streets affected: Gold Coast Highway (lane closure) between Rosewood Avenue and Chelsea Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

2-3 days only between dates                  

Duration: 6.30pm - 6am

Reason: Manhole refurbishment

    

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 13 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 11 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 11 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 10 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 7 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 7 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 7 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 7 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 6 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 6 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 6 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 5 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 5 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 5 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 5 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 5 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Tugun

Day 5 of 8

Streets affected: Kitchener Street (half road closure with hold and release for 2 minutes maximum) between Monash Street and Coolara Street

 

Show more

Start date: 2 August 2017

End date: 9 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Yatala

Day 5 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 4 of 9

Streets affected: Coolangatta Road (half road closure with hold and release for 2 minutes maximum) between Lord Street and Haig Street

 

Show more

Start date: 3 August 2017

End date: 11 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 3 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

 
7 Aug - Monday
Water and sewerage

Unplanned - Water Interruption - Carrara

Day 1 of 2

Streets affected: Pleasant Court, Mctaggart Place

Cause: Water main repairs

W/O: 20344410

Notif: 1000371987

Show more

Start time and date: 8.30pm, 7 August 2017

End time and date: 1.30am, 8 August 2017

central

Road closures

Planned - Road closure - Tugun

Day 281 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 168 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 63 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 56 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 29 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 22 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 22 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 22 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 22 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 20 of 22

Streets affected: Galleon Way (half road closure with hold and release for 2 minutes maximum) between Ware Drive and Beaumont Court

Show more

Start date: 19 July 2017

End date: 9 August 2017

Duration: 6.30am - 5pm

Reason: Truck egress and ingress for sewerage pump station storage

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 20 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 19 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 18 of 19

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Elizabeth Avenue and Australia Avenue

Show more

Start date: 21 July 2017

End date: 8 August 2017

Duration: 6.30am - 5.30pm

Reason: Upgrade of pedestrian signals, crossing and footpath upgrade

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 15 of 15

Streets affected: Gold Coast Highway  (lane closure) between Second Avenue and Armrick Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

1 day only between dates                  

Duration: 7am - 3pm

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 14 of 14

Streets affected: Britannia Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Surf Parade

Show more

Start date: 24 July 2017

End date: 7 August 2017

Duration: 6pm - 6am

Reason: Manhole refurbishment

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 14 of 14

Streets affected: Gold Coast Highway (lane closure) between Rosewood Avenue and Chelsea Avenue

Show more

Start date: 24 July 2017

End date: 7 August 2017

2-3 days only between dates                  

Duration: 6.30pm - 6am

Reason: Manhole refurbishment

    

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 14 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 12 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 12 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 8 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 8 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 8 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 8 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 7 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 7 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 7 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 6 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 6 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 6 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 6 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 6 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Tugun

Day 6 of 8

Streets affected: Kitchener Street (half road closure with hold and release for 2 minutes maximum) between Monash Street and Coolara Street

 

Show more

Start date: 2 August 2017

End date: 9 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Yatala

Day 6 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 5 of 9

Streets affected: Coolangatta Road (half road closure with hold and release for 2 minutes maximum) between Lord Street and Haig Street

 

Show more

Start date: 3 August 2017

End date: 11 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 4 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 9

Streets affected: Chelsea Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

 

Show more

Start date: 7 August 2017

End date: 15 August 2017

Duration: 6.30am - 4pm

Reason: Kerb and channel works

south

Bushfires

Planned - Bushfire hazard reduction burn – Numinbah Valley

7.00am - 8.00pm

Streets/area affected: Chesters Road

Show more

Start: 7am,  Monday 7th August (weather permitting)
End:  7am,  Monday 7th August
Duration:   1 day

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

hinterland

Water and sewerage

Planned - Water interruption - Yatala

7.00am - 3.30pm

Streets affected: Yatala Street

Cause: Construction work around water main

Ispot: 63420102

W/O: 52009179

Notif: 1000368966

north

Water and sewerage

Planned - Water interruption - Arundel

9.00am - 2.00pm

Streets affected: Olsen Avenue between Central street and Little Usher Street

Cause: Replace hydrants

Ispot: 63415383

W/O: 60003137

Notif: 1000369377

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 1 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 5

Streets affected: Cottesloe Drive (lane closure) between Vancouver Drive and Rawlinna Drive

 

Show more

Start date: 7 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Pavement and line marking works

south

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

 
8 Aug - Tuesday
Water and sewerage

Unplanned - Water Interruption - Carrara

Day 2 of 2

Streets affected: Pleasant Court, Mctaggart Place

Cause: Water main repairs

W/O: 20344410

Notif: 1000371987

Show more

Start time and date: 8.30pm, 7 August 2017

End time and date: 1.30am, 8 August 2017

central

Water and sewerage

Unplanned - Water interruption - Bilinga

9.15am - 9.45am

Streets affected: Lang Street

Cause: Repair water service

W/O: 20338106

Notif: 1000364254

south

Water and sewerage

Unplanned - Water interruption - Surfers Paradise

11.20am - 3.30pm

Streets affected: La Spezia Court, Binda Place

Cause: Repair water main

W/O: 20344605

Notif: 1000372218

central

Water and sewerage

Unplanned - Water interruption - Miami

11.50am - 12.50pm

Streets affected: Cantala Avenue

Cause: Repair water main

W/O: 20334806

Notif: 1000369306

south

Road closures

Planned - Road closure - Tugun

Day 282 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 169 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 64 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 57 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 30 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 23 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 23 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 23 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 23 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 21 of 22

Streets affected: Galleon Way (half road closure with hold and release for 2 minutes maximum) between Ware Drive and Beaumont Court

Show more

Start date: 19 July 2017

End date: 9 August 2017

Duration: 6.30am - 5pm

Reason: Truck egress and ingress for sewerage pump station storage

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 21 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 20 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 19 of 19

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Elizabeth Avenue and Australia Avenue

Show more

Start date: 21 July 2017

End date: 8 August 2017

Duration: 6.30am - 5.30pm

Reason: Upgrade of pedestrian signals, crossing and footpath upgrade

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 15 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 13 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 13 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 9 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 9 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 9 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 9 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 8 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 8 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 8 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 7 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 7 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 7 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 7 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 7 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Tugun

Day 7 of 8

Streets affected: Kitchener Street (half road closure with hold and release for 2 minutes maximum) between Monash Street and Coolara Street

 

Show more

Start date: 2 August 2017

End date: 9 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Yatala

Day 7 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 6 of 9

Streets affected: Coolangatta Road (half road closure with hold and release for 2 minutes maximum) between Lord Street and Haig Street

 

Show more

Start date: 3 August 2017

End date: 11 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 5 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 9

Streets affected: Chelsea Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

 

Show more

Start date: 7 August 2017

End date: 15 August 2017

Duration: 6.30am - 4pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 2 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 5

Streets affected: Cottesloe Drive (lane closure) between Vancouver Drive and Rawlinna Drive

 

Show more

Start date: 7 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Pavement and line marking works

south

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 1 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Water and sewerage

Planned - Water interruption - Yatala

7.00am - 3.30pm

Streets affected: Yatala Street

Cause: Construction work around water main

Ispot: 63420102

W/O: 52009179

Notif: 1000368966

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 1 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Water and sewerage

Planned - Water interruption - Benowa

9.00am - 2.00pm

Streets affected: Bamboo Avenue

Cause: Replace section of water main

Ispot: 63407464

W/O: 60003524

Notif: 1000370037

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 4

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Fern Street and Wharf Road

Show more

Start date: 8 August 2017

End date: 11 August 2017

Duration: 9am - 3pm

Reason: Installation of pedestrian crossing (pavement marking)

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 1 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Water and sewerage

Planned - Water interruption - Arundel

6.00pm - 10.00pm

Streets affected: Demand Avenue

Cause: Disconnection of water service

Ispot: 63288790

W/O: 52009023

Notif: 1000358810

central

Water and sewerage

Planned - Water Interruption - Southport

7.00pm - 11.30pm

Streets affected: Olsen Avenue between Industrial Avenue and Southport Nerang Road on eastern side of Olsen Avenue.

Cause: Relocating of water main

Ispot: 63425582

W/O: 60003943

Notif: 1000370612

central

Road closures

Planned - Temporary Road Closure Bundall

Day 1 of 4

Streets affected: Ashmore Road  (lane closure) between Racecourse Drive and Tiwi Street

Show more

Start date: 8 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 8.30pm - 3am

Reason: Loop detector repairs and maintenance

north

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 2

Streets affected: Gold Coast Highway (lane closure) between Tedder Avenue and Ada Bell Way

Show more

Start date: 8 August 2017

End date: 9 August 2017

1 day only between dates                  

Duration: 9pm - 2am

Reason: Light pole installation

central

Water and sewerage

Planned - Water interruption - Burleigh Heads

Day 1 of 2

Streets affected: West Burleigh Road

Cause: Replace  hydrant

Ispot: 63414922

W/O: 60003137

Notif: 1000369368

Show more

Start time and date: 10.00pm, 8 August 2017

End time and date: 2.00am, 9 August 2017

south

 
9 Aug - Wednesday
Water and sewerage

Unplanned - Water Interruption - Burleigh Waters

1.10am - 2.10am

Streets affected: Falcon Court

Cause: Repair water hydrant

W/O: 20344807

Notif: 1000372523

south

Water and sewerage

Unplanned - Water interruption - Tallebudgera Valley

9.45am - 1.45pm

Streets affected: Tallebudgera Creek Road from Golden Valley Road to end of Tallebudgera Creek Road, Plaza Street

Cause: Repair water main - posible low pressure in area

W/O: 20340800

Notif: 1000367499

south

Water and sewerage

Unplanned - Water interruption - Elanora

11.25am - 12.10pm

Streets affected: Daphne Court

Cause: Repair water service

W/O: 20344040

Notif: 1000371430

south

Road closures

Planned - Road closure - Tugun

Day 283 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 170 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 65 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 58 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 31 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 24 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 24 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 24 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 24 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 22 of 22

Streets affected: Galleon Way (half road closure with hold and release for 2 minutes maximum) between Ware Drive and Beaumont Court

Show more

Start date: 19 July 2017

End date: 9 August 2017

Duration: 6.30am - 5pm

Reason: Truck egress and ingress for sewerage pump station storage

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 22 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 21 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 16 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 14 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 14 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 10 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 10 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 10 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 10 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 9 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 9 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 9 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 9 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 8 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 8 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 8 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 8 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 8 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Tugun

Day 8 of 8

Streets affected: Kitchener Street (half road closure with hold and release for 2 minutes maximum) between Monash Street and Coolara Street

 

Show more

Start date: 2 August 2017

End date: 9 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Yatala

Day 8 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 7 of 9

Streets affected: Coolangatta Road (half road closure with hold and release for 2 minutes maximum) between Lord Street and Haig Street

 

Show more

Start date: 3 August 2017

End date: 11 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 6 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 9

Streets affected: Chelsea Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

 

Show more

Start date: 7 August 2017

End date: 15 August 2017

Duration: 6.30am - 4pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 3 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 5

Streets affected: Cottesloe Drive (lane closure) between Vancouver Drive and Rawlinna Drive

 

Show more

Start date: 7 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Pavement and line marking works

south

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 2 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 2 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 4

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Fern Street and Wharf Road

Show more

Start date: 8 August 2017

End date: 11 August 2017

Duration: 9am - 3pm

Reason: Installation of pedestrian crossing (pavement marking)

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 2 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Bundall

Day 2 of 4

Streets affected: Ashmore Road  (lane closure) between Racecourse Drive and Tiwi Street

Show more

Start date: 8 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 8.30pm - 3am

Reason: Loop detector repairs and maintenance

north

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 2

Streets affected: Gold Coast Highway (lane closure) between Tedder Avenue and Ada Bell Way

Show more

Start date: 8 August 2017

End date: 9 August 2017

1 day only between dates                  

Duration: 9pm - 2am

Reason: Light pole installation

central

Water and sewerage

Planned - Water interruption - Burleigh Heads

Day 2 of 2

Streets affected: West Burleigh Road

Cause: Replace  hydrant

Ispot: 63414922

W/O: 60003137

Notif: 1000369368

Show more

Start time and date: 10.00pm, 8 August 2017

End time and date: 2.00am, 9 August 2017

south

Water and sewerage

Planned - Water interruption - Coolangatta

Day 1 of 2

Streets affected: Griffith Street, Chalk Street

Cause: Replace hydrants

Ispot: 63416942

W/O: 60003137

Notif: 1000369388

Show more

Start time and date: 10.00pm, 9 August 2017

End time and date: 3.00am, 10 August 2017

central

 
10 Aug - Thursday
Water and sewerage

Unplanned - Water interruption - Tallai

10.45am - 11.45am

Streets affected: Uplands Court

Cause: Repair water main

W/O: 52009172

Notif: 1000368361

south

Water and sewerage

Unplanned - Water interruption - Mudgeeraba

12.50pm - 2.50pm

Streets affected: Pharlap Avenue

Cause: Repair water main

W/O: 20344562

Notif: 1000372119

 

 

south

Water and sewerage

Unplanned - Water interruption - Elanora

1.55pm - 2.55pm

Streets affected: Serafini Court

Cause: Repair water hydrant

W/O: 20343038

Notif: 1000370166

south

Water and sewerage

Unplanned - Water interruption - Elanora

2.00pm - 3.00pm

Streets affected: Forest Drive, Acmena Court

Cause: Repair water hydrant

W/O: 20341916

Notif: 1000368831

south

Water and sewerage

Unplanned - Water interruption - Palm Beach

3.25pm - 8.25pm

Streets affected: Twenty Sixth Avenue

Cause: Repair water main

W/O: 20345517

Notif: 1000373411

south

Road closures

Planned - Road closure - Tugun

Day 284 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 171 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 66 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 59 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 32 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 25 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 25 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 25 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 25 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 23 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 22 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 17 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 15 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 15 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 11 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 11 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 11 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 11 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 11 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 11 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 11 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 10 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 10 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 10 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 10 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 9 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 9 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 9 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 9 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 9 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 9 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Yatala

Day 9 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 8 of 9

Streets affected: Coolangatta Road (half road closure with hold and release for 2 minutes maximum) between Lord Street and Haig Street

 

Show more

Start date: 3 August 2017

End date: 11 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 7 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 9

Streets affected: Chelsea Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

 

Show more

Start date: 7 August 2017

End date: 15 August 2017

Duration: 6.30am - 4pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 4 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 4 of 5

Streets affected: Cottesloe Drive (lane closure) between Vancouver Drive and Rawlinna Drive

 

Show more

Start date: 7 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Pavement and line marking works

south

Road closures

Planned - Temporary Road Closure Robina

Day 4 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 3 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 3 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 4

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Fern Street and Wharf Road

Show more

Start date: 8 August 2017

End date: 11 August 2017

Duration: 9am - 3pm

Reason: Installation of pedestrian crossing (pavement marking)

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 3 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Bundall

Day 3 of 4

Streets affected: Ashmore Road  (lane closure) between Racecourse Drive and Tiwi Street

Show more

Start date: 8 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 8.30pm - 3am

Reason: Loop detector repairs and maintenance

north

Water and sewerage

Planned - Water interruption - Coolangatta

Day 2 of 2

Streets affected: Griffith Street, Chalk Street

Cause: Replace hydrants

Ispot: 63416942

W/O: 60003137

Notif: 1000369388

Show more

Start time and date: 10.00pm, 9 August 2017

End time and date: 3.00am, 10 August 2017

central

Mosquito spraying

Planned - Biting Midge Canal Beach Treatment - Florida Gardens, Rio Vista

5.00am - 8.30am

Areas affected: Florida Gardens, Rio Vista

Biting Midge Canal Beach Treatment will be undertaken in these areas on Thursday 10th August 2017 from 5am to 8.30am for control of biting midge larvae (weather permitting)

all regions

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 1 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Water and sewerage

Planned - Water interruption - Bundall

8.00am - 12.00pm

Streets affected: Ken Russell Court

Cause: Repair water main

W/O: 60003991

Notif: 1000373085

central

Water and sewerage

Planned - Water interruption - Palm Beach

9.00am - 2.00pm

Streets affected: Leyte Avenue

Cause: Repair work on water main

Ispot: 63460991

W/O: 52009172

Notif: 1000368361

south

Water and sewerage

Planned - Water Interruption - Paradise Point

Day 1 of 2

Streets affected: Rosalind Avenue, Bruce Avenue, Community Drive, Falkinder Avenue

Cause: Replace hydrants

Ispot: 63420185

W/O: 60003137

Notif: 1000369399

Show more

Start time and date: 10.00pm, 10 August 2017

End time and date: 2.00am, 11 August 2017

north

 
11 Aug - Friday
Water and sewerage

Unplanned - Water interruption - Nerang

8.25am - 9.25am

Streets affected: Auster Court

Cause: Repair water service and meter

W/O: 20344971

Notif: 1000372684

central

Water and sewerage

Unplanned - Water interruption - Coolangatta

11.45am - 12.45pm

Streets affected: Marine Parade between Hill Street and Ward Street

Cause: Repair water main

W/O: 20336774

Notif: 1000362662

south

Road closures

Planned - Road closure - Tugun

Day 285 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 172 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 67 of 67

Streets affected: Village Way (half road closure with hold and release for 2 minutes maximum) between Theatre Street and Mews Court

Show more

Start date: 6 June 2017

End date: 11 August 2017

Duration: 7am - 5pm

Reason: Construction for sewerage pump station.

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 60 of 60

Streets affected: Musgrave Street and Coolangatta Road Intersection (lane closure)

Show more

Start date: 13 June 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 5am - 5pm

Reason: Intersection upgrade works

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 33 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 26 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 26 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 26 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 26 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 24 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 23 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 18 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 16 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 16 of 16

Streets affected: Smugglers Place and Cockleshell Road (full road closure local traffic access only) between Pebble Beach Drive and the Cul-de-sac

Show more

Start date: 28 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 12 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 12 of 12

Streets affected: Bittern Avenue and Turaco Court (full road closure local traffic access only) between Burleigh Street and Bluejay Street

Show more

Start date: 31 July 2017

End date: 11 August 2017

Duration: 7am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Parkwood

Day 12 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 12 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 12 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 12 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 12 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 11 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 11 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 11 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 10 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 10 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 10 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 10 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 10 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 10 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Yatala

Day 10 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 9 of 9

Streets affected: Coolangatta Road (half road closure with hold and release for 2 minutes maximum) between Lord Street and Haig Street

 

Show more

Start date: 3 August 2017

End date: 11 August 2017

Duration: 9.30am - 2.30pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 8 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 9

Streets affected: Chelsea Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

 

Show more

Start date: 7 August 2017

End date: 15 August 2017

Duration: 6.30am - 4pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 5 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 5 of 5

Streets affected: Cottesloe Drive (lane closure) between Vancouver Drive and Rawlinna Drive

 

Show more

Start date: 7 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Pavement and line marking works

south

Road closures

Planned - Temporary Road Closure Robina

Day 5 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 4 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 4 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 4

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Fern Street and Wharf Road

Show more

Start date: 8 August 2017

End date: 11 August 2017

Duration: 9am - 3pm

Reason: Installation of pedestrian crossing (pavement marking)

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 4 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Bundall

Day 4 of 4

Streets affected: Ashmore Road  (lane closure) between Racecourse Drive and Tiwi Street

Show more

Start date: 8 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 8.30pm - 3am

Reason: Loop detector repairs and maintenance

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 2 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Water and sewerage

Planned - Water Interruption - Paradise Point

Day 2 of 2

Streets affected: Rosalind Avenue, Bruce Avenue, Community Drive, Falkinder Avenue

Cause: Replace hydrants

Ispot: 63420185

W/O: 60003137

Notif: 1000369399

Show more

Start time and date: 10.00pm, 10 August 2017

End time and date: 2.00am, 11 August 2017

north

Mosquito spraying

Planned - Biting Midge Canal Beach Treatment - Paradise Waters, Gardiners Creek, Evandale, Watsons

5.00am - 8.30am

Areas affected: Paradise Waters, Gardiners Creek, Evandale, Watsons

Biting Midge Canal Beach Treatment will be undertaken in these areas on Friday 11th August 2017 from 5am to 8.30am for control of biting midge larvae (weather permitting)

all regions

Road closures

Planned - Temporary Road Closure Coolangatta

9.00am - 3.00pm

Streets affected: Lord Street and Coolangatta Road (lane closure) between Haig Street,  Miles Street and Winston Street, Stapylton Street

Show more

Start date: 11 August 2017

End date: 11 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Vacuum Excavation

south

 
12 Aug - Saturday
Water and sewerage

Unplanned - Water Interruption - Nerang

12.30pm - 1.30pm

Streets affected: Ealing Court, Brook Court, Burn Court

Cause: Repair water service

W/O: 20344600

Notif: 1000372208

central

Water and sewerage

Unplanned - Water Interruption - Ashmore

3.30pm - 4.30pm

Streets affected: Kallaroo Crescent

Cause: Repair hydrant

W/O: 20344568

Notif: 1000372135

central

Water and sewerage

Unplanned - Water Interruption - Reedy Creek

4.25pm - 5.25pm

Streets affected: Lowell Street, Grasslands Crescent

Cause: Repair hydrant

W/O: 20345456

Notif: 1000373338

south

Road closures

Planned - Road closure - Tugun

Day 286 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 173 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 34 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 27 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 27 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 27 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 27 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 25 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 24 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 19 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 17 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 16 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 13 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Parkwood

Day 13 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 13 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 13 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 13 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 13 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 12 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 12 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 12 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 11 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 11 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 11 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 11 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 11 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Yatala

Day 11 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 9 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 9 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 9

Streets affected: Chelsea Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

 

Show more

Start date: 7 August 2017

End date: 15 August 2017

Duration: 6.30am - 4pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 6 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 6 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 5 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 5 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 5 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 3 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Water and sewerage

Planned - Water interruption - Arundel

7.00am - 12.00pm

Streets affected: Newheath Drive

Cause: New connection to water main

Ispot: 63467875

W/O: 52009131

Notif: 1000364107

central

 
13 Aug - Sunday
Water and sewerage

Unplanned - Water Interruption - Coombabah

10.00am - 10.45am

Streets affected: Myola Court

Cause: Repair water service

W/O: 20344340

Notif: 1000371843

north

Water and sewerage

Unplanned - Water Interruption Pimpama

9.00pm - 10.00pm

Streets affected: Umbango Drive

Cause: Repair water main

Notif. 1000373353

W/O. 20345475

north

Road closures

Planned - Road closure - Tugun

Day 287 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 174 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 35 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 28 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 28 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 28 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 28 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 26 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 25 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 20 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 18 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 17 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 14 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Parkwood

Day 14 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 14 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 14 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 14 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 14 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 13 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 13 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 13 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 12 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 12 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 12 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 12 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 12 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Yatala

Day 12 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 10 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 10 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 9

Streets affected: Chelsea Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

 

Show more

Start date: 7 August 2017

End date: 15 August 2017

Duration: 6.30am - 4pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 7 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 7 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 6 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 6 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 6 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 4 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 6

Streets affected: Enderley Avenue (lane closure) between Surfers Paradise Boulevard and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works on existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 6

Streets affected: River Terrace (lane closure) between Enderley Avenue and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 6

Streets affected: Via Roma (single lane closures of a multi-lane road - at least one lane in both directions along Via Roma to be trafficable at all times) between Verona Avenue and Bridge

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9am - 2:30pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 6

Streets affected: Rememberance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Rememberance Drive to be trafficable at all times) between Markwell Avenue and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 6

Streets affected: Markwell Avenue (lane closure) between Remembrance Drive and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

 
14 Aug - Monday
Water and sewerage

Unplanned - Water Interruption Coombabah

1.00am - 2.00am

Streets affected: Myola Court

Cause: Repair water main

Notif. 1000371843

W/O 20344340

north

Water and sewerage

Unplanned - Water interruption - Robina

9.25am - 10.25am

Streets affected: Corner of Cottesloe Drive and Ron Penhaligon Way

Cause: Repair water hydrant

W/O: 20342025

Notif: 1000368113

south

Water and sewerage

Unplanned - Water interruption - Elanora

9.35am - 10.20am

Streets affected: Serafini Court

Cause: Repair water hydrant

W/O: 20343038

Notif: 1000370166

south

Water and sewerage

Unplanned - Water interruption - Mudgeeraba

11.15am - 1.15pm

Streets affected: Piallingo Drive

Cause: Repair water main

W/O: 20344449

Notif: 1000371986

south

Water and sewerage

Unplanned - Water interruption - Broadbeach

11.20am - 3.20pm

Streets affected: Chelsea Avenue between Surf Parade and Old Burleigh Road

Cause: Repair water main

W/O: 20346175

Notif: 1000374242

central

Water and sewerage

Unplanned - Water interruption - Robina

11.50am - 12.50pm

Streets affected: Robina Parkway, Glen Iris Reserve

Cause: Repair water hydrant

W/O: 20343595

Notif: 1000370916

south

Water and sewerage

Unplanned - Water interruption - Tallebudgera Valley

1.00pm - 3.00pm

Streets affected: Plaza Street, Tallebudgera Creek Road

Cause: Repair water main

W/O: 20342618

Notif: 1000369696

south

Water and sewerage

Unplanned - Water interruption - Mermaid Waters

1.20pm - 2.20pm

Streets affected: Birigun Street, Anchor Court

Cause: Repair water mai

W/O: 20345032

Notif: 1000372782

south

Road closures

Planned - Road closure - Tugun

Day 288 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 175 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 36 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 29 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 29 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 29 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 29 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 27 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 26 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 21 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 19 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 18 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 15 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Parkwood

Day 15 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Nerang

Day 15 of 15

Streets affected: Hinker Drive (North) (half road closure with hold and release for 2 minutes maximum) between McKenzie Drive and Pappas Way

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Bore hole testing

north

Road closures

Planned - Temporary Road Closure Broadbeach Waters

Day 15 of 15

Streets affected: Monaco Street (lane closure) between Rio Vista Boulevard and Pacific Boulevard

Show more

Start date: 31 July 2017

End date: 14 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 15 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 15 of 15

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Bermuda Street and Whistler Drive

Show more

Start date: 31 July 2017

End date: 14 August 2017

Duration: 9.30am - 2.30pm

Reason: Borehole testing

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 14 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 14 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 14 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 13 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 13 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 13 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 13 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 13 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Yatala

Day 13 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 11 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 9

Streets affected: Chelsea Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

 

Show more

Start date: 7 August 2017

End date: 15 August 2017

Duration: 6.30am - 4pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 8 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 8 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 7 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 7 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 7 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 5 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 6

Streets affected: Enderley Avenue (lane closure) between Surfers Paradise Boulevard and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works on existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 6

Streets affected: River Terrace (lane closure) between Enderley Avenue and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 6

Streets affected: Via Roma (single lane closures of a multi-lane road - at least one lane in both directions along Via Roma to be trafficable at all times) between Verona Avenue and Bridge

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9am - 2:30pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 6

Streets affected: Rememberance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Rememberance Drive to be trafficable at all times) between Markwell Avenue and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 6

Streets affected: Markwell Avenue (lane closure) between Remembrance Drive and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Mosquito spraying

Planned - Biting Midge Canal Beach Treatment - Palm Beach

5.00am - 8.30am

Area affected: Palm Beach

Biting Midge Canal Beach Treatment will be undertaken in this area on Monday 14th August 2017 from 5am to 8.30am for control of biting midge larvae (weather permitting)

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 1 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 1 of 5

Streets affected: Teemangum Street (half road closure with hold and release for 2 minutes maximum) between 30 Teemangum Street and Cooinda Avenue

 

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 6.30am - 4.30pm

Reason: Stormwater Investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 1 of 3

Streets affected: Crescent Avenue (full road closure local traffic access only) between Avanti Street and Star Avenue

 

Show more

Start date: 14 August 2017

End date: 16 August 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 1 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Coolangatta

7.00am - 5.00pm

Streets affected: Marine Parade (full road closure local traffic access only) between Warner Street and McDonald Street

Show more

Start date: 14 August 2017

End date: 14 August 2017

Duration: 7am - 5pm

Reason: Installation of new water main

south

Road closures

Planned - Temporary Road Closure Paradise Point

Day 1 of 5

Streets affected: The Esplanade (half road closure with hold and release for 2 minutes maximum) between Abalone Avenue and Bruce Avenue

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Installation of coloured pavement coatings                

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 1 of 5

Streets affected: Marine Parade (lane closure) between Lord Street and Garrick Street

Show more

Start date: 14 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 7.30am - 3.30pm

Reason: Detector loop replacement

south

Water and sewerage

Planned - Water interruption - Broadbeach

9.00am - 2.00pm

Streets affected: Albert Avenue

Cause: Replace hydrant

Ispot: 63460376

W/O: 60003137

Notif: 1000371646

central

Road closures

Planned - Temporary Road Closure Biggera Waters

Day 1 of 3

Streets affected: Hollywell Road (lane closure) between Burrows Street and Wattle Avenue

 

Show more

Start date: 14 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 6.30pm - 3am

Reason: Traffic signal maintenance

north

Road closures

Planned - Temporary Road Closure Southport

Day 0 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

 
15 Aug - Tuesday
Water and sewerage

Unplanned - Water Interruption - Bundall

8.30am - 10.30am

Streets affected: Bamboo Avenue, Poinciana Crescent, Tashey Court, Sandown Avenue, Heeb Street, Allamanda Grove, Croton Grove

Cause: Water service repairs

W/O: 60004028

Notif: 1000374440

central

Water and sewerage

Unplanned - Water Interruption - Ormeau

9.10am - 9.45am

Streets affected: Glenafton Court

Cause: Water service repairs

W/O: 20346319

Notif: 1000374434

north

Water and sewerage

Unplanned - Water Interruption - Labrador

9.20am - 4.30pm

Streets affected: Gordon Street, Turpin Road

Cause: Water main repairs

W/O: 20346472

Notif: 1000374597

central

Water and sewerage

Unplanned - Water Interruption - Robina

9.50am - 10.50am

Streets affected: Robina Parkway

Cause: Water service repairs

W/O: 20343595

Notif: 1000370916

south

Water and sewerage

Unplanned - Water Interruption - Oxenford

12.10pm - 1.00pm

Streets affected: Cawley Place

Cause: Water service repairs

W/O: 20346324

Notif: 1000374437

north

Water and sewerage

Unplanned - Water Interruption - Upper Coomera

2.15pm - 9.00pm

Streets affected: Marion Road, Amelia Street, Cornelius Street, Herbert Street

Cause: Repair water service

W/O: 20345552

Notif: 1000373444

north

Water and sewerage

Unplanned - Water Interruption - Biggera Waters

3.00pm - 3.30pm

Streets affected: Vernia Place

Cause: Repair hydrant

W/O: 60003137

Notif: 1000315289

north

Water and sewerage

Unplanned - Water Interruption - Reedy Creek

8.50pm - 9.10pm

Streets affected: Skywatch Circuit, Grampian Court

Cause: Repair hydrant

W/O: 20346776

Noti: 1000374960

south

Water and sewerage

Unplanned - Water interruption - Runaway Bay

11.00pm - 11.59pm

Streets affected: Bulolo Avenue

Cause: Water Leak

W/O: 20346794

north

Road closures

Planned - Road closure - Tugun

Day 289 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 176 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 37 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 30 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 30 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 30 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 30 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 28 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 27 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 22 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 20 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 19 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 16 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Parkwood

Day 16 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 15

Streets affected: Remembrance Drive (lane closure) between Peninsular Drive and Markwell Avenue

Show more

Start date: 1 August 2017

End date: 15 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Nerang

Day 15 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Spencer Drive and Lawrence Drive

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Nerang

Day 15 of 15

Streets affected: Lawrence Drive (half road closure with hold and release for 2 minutes maximum) between Leagues Club Drive and Nerang Broadbeach Road

Show more

Start date: 1 August 2017

End date: 15 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 15 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 14 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 14 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 14 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 14 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 14 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Yatala

Day 14 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 12 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 9

Streets affected: Chelsea Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

 

Show more

Start date: 7 August 2017

End date: 15 August 2017

Duration: 6.30am - 4pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 9 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 9 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 8 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 8 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 8 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 6 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 6

Streets affected: Enderley Avenue (lane closure) between Surfers Paradise Boulevard and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works on existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 6

Streets affected: River Terrace (lane closure) between Enderley Avenue and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 6

Streets affected: Via Roma (single lane closures of a multi-lane road - at least one lane in both directions along Via Roma to be trafficable at all times) between Verona Avenue and Bridge

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9am - 2:30pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 6

Streets affected: Rememberance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Rememberance Drive to be trafficable at all times) between Markwell Avenue and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 6

Streets affected: Markwell Avenue (lane closure) between Remembrance Drive and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Tugun

Day 2 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 2 of 5

Streets affected: Teemangum Street (half road closure with hold and release for 2 minutes maximum) between 30 Teemangum Street and Cooinda Avenue

 

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 6.30am - 4.30pm

Reason: Stormwater Investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 2 of 3

Streets affected: Crescent Avenue (full road closure local traffic access only) between Avanti Street and Star Avenue

 

Show more

Start date: 14 August 2017

End date: 16 August 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 2 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Paradise Point

Day 2 of 5

Streets affected: The Esplanade (half road closure with hold and release for 2 minutes maximum) between Abalone Avenue and Bruce Avenue

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Installation of coloured pavement coatings                

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 2 of 5

Streets affected: Marine Parade (lane closure) between Lord Street and Garrick Street

Show more

Start date: 14 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 7.30am - 3.30pm

Reason: Detector loop replacement

south

Road closures

Planned - Temporary Road Closure Biggera Waters

Day 2 of 3

Streets affected: Hollywell Road (lane closure) between Burrows Street and Wattle Avenue

 

Show more

Start date: 14 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 6.30pm - 3am

Reason: Traffic signal maintenance

north

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Bushfires

Planned - Bushfire hazard reduction burn – Trees Road Conservation Area Tallebudgera

7.00am - 7.00pm

Streets/area affected: Trees Road Conservation Area below Glencairn Estate, Trees Road, Tallebudgera

Show more

Start <time/date>: 7am Tuesday 15th August (weather permitting)
End <time/date>:  7pm Tuesday 15th August
Duration:   1 day

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 1 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Water and sewerage

Planned - Water interruption - Biggera Waters

9.00am - 2.00pm

Streets affected: Back Street, Taylor Street

Cause: Replace hydrants

Ispot: 63460505

W/O: 60003137

Notif: 1000371617

north

Water and sewerage

Planned - Water interruption - Bonogin

9.00am - 2.00pm

Streets affected: Bonogin Road, Tulipwood  Drive, Calanthe Lane, Magnolia Lane, Roxby Court, Carol Anne Court

Cause: Maintenance work on water main

Ispot: 63471708

W/O: 52009213

Notif: 1000372132

south

Road closures

Planned - Temporary Road Closure Gaven

Day 1 of 3

Streets affected: Heslop Road (half road closure with hold and release for 2 minutes maximum) between Creek Place and Hymix Overpass

 

Show more

Start date: 15 August 2017

End date: 17 August 2017

Duration: 9am - 2.30pm

Reason: Bridge works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 1 of 3

Streets affected: Dreamworld Parkway (half road closure with hold and release for 2 minutes maximum) between Hope Island Road and Coomera River        

Show more

Start date: 15 August 2017

End date: 17 August 2017

Duration: 9am - 2pm

Reason: Bridge works

north

Water and sewerage

Planned - Water interruption - Gaven

9.00am - 2.00pm

Streets affected: Hammond Drive

Cause: Repair water main

Ispot: 64054867

W/O: 52009216

Notif: 1000372705

central

Road closures

Planned - Temporary Road Closure Southport

Day 0 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 0 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

 
16 Aug - Wednesday
Water and sewerage

Unplanned - Water interruption - Clear Island Waters

9.00am - 10.00am

Streets affected: Key Biscayne

Cause: Repair water service

W/O: 60003137

Notif: 1000374059

south

Water and sewerage

Unplanned - Water interruption - Ormeau

10.10am - 11.10am

Streets affected: Reedmans Road between Gawain Drive and Banks Drive

Cause: Repair water hydrant

W/O: 20336894

Notif: 1000362725

north

Water and sewerage

Unplanned - Water interruption - Helensvale

10.55am - 11.40am

Streets affected: Careel Close

Cause: Repair water hydrant

W/O: 20346409

Notif: 1000374470

north

Water and sewerage

Unplanned - Water interruption - Nerang

12.40pm - 2.40pm

Streets affected: Citrus Drive, Appleblossom Place, Mango Court, Cherry Lane

Cause: Repair water main

W/O: 20346643

Notif: 1000375247

central

Water and sewerage

Unplanned - Water interruption - Nerang

12.40pm - 2.40pm

Streets affected: Citrus Drive, Appleblossom Place, Mango Court, Cherry Lane

Cause: Repair water main

W/O: 20346643

Notif: 1000375247

central

Water and sewerage

Unplanned - Water interruption - Tallebudgera

1.55pm - 2.55pm

Streets affected: Tyalla Court

Cause: Repair water service

W/O: 20346983

Notif: 1000375241

south

Road closures

Planned - Road closure - Tugun

Day 290 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 177 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 38 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 31 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 31 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 31 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 31 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 29 of 29

Streets affected: Ern Harley Drive (half road closure with hold and release for 2 minutes maximum) between Greg Chappell Drive and Calabro Way

Show more

Start date: 19 July 2017

End date: 16 August 2017

Duration: 7am - 5pm

Reason: Sewer reline

south

Road closures

Planned - Temporary Road Closure Carrara

Day 28 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 23 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 21 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 20 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 17 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Parkwood

Day 17 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 16 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 15 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 15

Streets affected: Laycock Street (half road closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevard and The Esplanade

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and channel works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 15 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Yatala

Day 15 of 15

Streets affected: Rivermount Drive (half road closure with hold and release for 2 minutes maximum) between Paterson Drive and Chainage 80

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

north

Road closures

Planned - Temporary Road Closure Yatala

Day 15 of 15

Streets affected: Nyholt Drive (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Business Street

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing boreholes

north

Road closures

Planned - Temporary Road Closure Ashmore

Day 15 of 15

Streets affected: Ashmore Road (lane closure) between Nerang Southport Road and Chainage 10725

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Yatala

Day 15 of 15

Streets affected: Paterson Road (full road closure local traffic access only) between Boat ramp entry and exit

 

Show more

Start date: 2 August 2017

End date: 16 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing of boreholes

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 14 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 13 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 10 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 10 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 9 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 9 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 9 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 7 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 6

Streets affected: Enderley Avenue (lane closure) between Surfers Paradise Boulevard and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works on existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 6

Streets affected: River Terrace (lane closure) between Enderley Avenue and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 6

Streets affected: Via Roma (single lane closures of a multi-lane road - at least one lane in both directions along Via Roma to be trafficable at all times) between Verona Avenue and Bridge

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9am - 2:30pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 6

Streets affected: Rememberance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Rememberance Drive to be trafficable at all times) between Markwell Avenue and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 6

Streets affected: Markwell Avenue (lane closure) between Remembrance Drive and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Tugun

Day 3 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 3 of 5

Streets affected: Teemangum Street (half road closure with hold and release for 2 minutes maximum) between 30 Teemangum Street and Cooinda Avenue

 

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 6.30am - 4.30pm

Reason: Stormwater Investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 3 of 3

Streets affected: Crescent Avenue (full road closure local traffic access only) between Avanti Street and Star Avenue

 

Show more

Start date: 14 August 2017

End date: 16 August 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 3 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Paradise Point

Day 3 of 5

Streets affected: The Esplanade (half road closure with hold and release for 2 minutes maximum) between Abalone Avenue and Bruce Avenue

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Installation of coloured pavement coatings                

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 3 of 5

Streets affected: Marine Parade (lane closure) between Lord Street and Garrick Street

Show more

Start date: 14 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 7.30am - 3.30pm

Reason: Detector loop replacement

south

Road closures

Planned - Temporary Road Closure Biggera Waters

Day 3 of 3

Streets affected: Hollywell Road (lane closure) between Burrows Street and Wattle Avenue

 

Show more

Start date: 14 August 2017

End date: 16 August 2017

1 day only between dates                  

Duration: 6.30pm - 3am

Reason: Traffic signal maintenance

north

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Road closures

Planned - Temporary Road Closure Gaven

Day 2 of 3

Streets affected: Heslop Road (half road closure with hold and release for 2 minutes maximum) between Creek Place and Hymix Overpass

 

Show more

Start date: 15 August 2017

End date: 17 August 2017

Duration: 9am - 2.30pm

Reason: Bridge works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 2 of 3

Streets affected: Dreamworld Parkway (half road closure with hold and release for 2 minutes maximum) between Hope Island Road and Coomera River        

Show more

Start date: 15 August 2017

End date: 17 August 2017

Duration: 9am - 2pm

Reason: Bridge works

north

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 16

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Marine Parade 

Show more

Start date: 16 August 2017

End date: 31 August 2017

Duration: 5am - 9am

Reason: Standing new light poles                  

central

Water and sewerage

Planned - Water interruption - Hollywell

9.00am - 2.00pm

Streets affected: Errol Avenue, Bayview Street, Abel Tasman Place, Van Diemen Place, Dirk Hartog Place, James Cook Esplanade, Columbus Drive

Cause: Replace hydrants

Ispot: 63460558

W/O: 60003137

Notif: 1000371592

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 0 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 0 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 0 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Water and sewerage

Planned - Water interruption - Bundall

Day 1 of 2

Streets affected: Bundall Road

Cause: Work on Bundall Road  water main to be isolated

Ispot: 64079428

W/O: 60004025

Notif: 1000374189

Show more

Start time and date: 11.00pm, 16 August 2017

End time and date: 1.00am, 17 August 2017

central

 
17 Aug - Today
Water and sewerage

Unplanned - Water interruption - Coomera

8.30am - 9.00am

Streets affected: Gatina Crescent

Cause: Repair water hydrant

W/O: 20347099

Notif: 1000375394

north

Water and sewerage

Unplanned - Water interruption - Mermaid Waters

9.00am - 11.00am

Streets affected: Crestmore Crescent

Cause: Replace hydrant

W/O: 20346129

Notif: 1000374175

south

Water and sewerage

Unplanned - Water interruption - Broadbeach Waters

1.45pm - 2.45pm

Streets affected: Cypress Drive West, Cypress Drive

Cause: Repair water main

W/O: 20347215

Notif: 1000375511

central

Road closures

Planned - Road closure - Tugun

Day 291 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 178 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 39 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 32 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 32 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 32 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 32 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Carrara

Day 29 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 24 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 22 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 21 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 18 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Parkwood

Day 18 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 17 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 16 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 16 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 15 of 15

Streets affected: Albert Avenue, Charles Avenue and Old Burleigh Road  (full road closure local traffic access only and single lane closure) between Queensland Avenue and Elizabeth Avenue

 

Show more

Start date: 3 August 2017

End date: 17 August 2017

Duration: 7pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 14 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 11 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 11 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 10 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 10 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 10 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 10 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 8 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 6

Streets affected: Enderley Avenue (lane closure) between Surfers Paradise Boulevard and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works on existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 6

Streets affected: River Terrace (lane closure) between Enderley Avenue and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 6

Streets affected: Via Roma (single lane closures of a multi-lane road - at least one lane in both directions along Via Roma to be trafficable at all times) between Verona Avenue and Bridge

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9am - 2:30pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 6

Streets affected: Rememberance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Rememberance Drive to be trafficable at all times) between Markwell Avenue and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 6

Streets affected: Markwell Avenue (lane closure) between Remembrance Drive and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Tugun

Day 4 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 4 of 5

Streets affected: Teemangum Street (half road closure with hold and release for 2 minutes maximum) between 30 Teemangum Street and Cooinda Avenue

 

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 6.30am - 4.30pm

Reason: Stormwater Investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 4 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Paradise Point

Day 4 of 5

Streets affected: The Esplanade (half road closure with hold and release for 2 minutes maximum) between Abalone Avenue and Bruce Avenue

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Installation of coloured pavement coatings                

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 4 of 5

Streets affected: Marine Parade (lane closure) between Lord Street and Garrick Street

Show more

Start date: 14 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 7.30am - 3.30pm

Reason: Detector loop replacement

south

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Road closures

Planned - Temporary Road Closure Gaven

Day 3 of 3

Streets affected: Heslop Road (half road closure with hold and release for 2 minutes maximum) between Creek Place and Hymix Overpass

 

Show more

Start date: 15 August 2017

End date: 17 August 2017

Duration: 9am - 2.30pm

Reason: Bridge works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 3 of 3

Streets affected: Dreamworld Parkway (half road closure with hold and release for 2 minutes maximum) between Hope Island Road and Coomera River        

Show more

Start date: 15 August 2017

End date: 17 August 2017

Duration: 9am - 2pm

Reason: Bridge works

north

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 16

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Marine Parade 

Show more

Start date: 16 August 2017

End date: 31 August 2017

Duration: 5am - 9am

Reason: Standing new light poles                  

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Water and sewerage

Planned - Water interruption - Bundall

Day 2 of 2

Streets affected: Bundall Road

Cause: Work on Bundall Road  water main to be isolated

Ispot: 64079428

W/O: 60004025

Notif: 1000374189

Show more

Start time and date: 11.00pm, 16 August 2017

End time and date: 1.00am, 17 August 2017

central

Bushfires

Planned - Bushfire Hazard Reduction Burn - Springbrook

7.00am - 7.39pm

Streets/area affected: Springbrook Conservation Area, Apple Tree Flat Portion E, Springbrook Road

Show more

Start: 7am, Thursday 17th August 2017 (weather permitting)
End: 7pm, Thursday 17th August 2017
Duration:  1 Day

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

hinterland

Water and sewerage

Planned - Water interruption - Hope Island

8.00am - 3.00pm

Streets affected: Northwater Drive

Cause: New connection to water main

Ispot: 64057554

 

 

north

Water and sewerage

Planned - Water interruption - Currumbin

9.00am - 2.00pm

Streets affected: Kandra Avenue, Katta Avenue, Woodgee Street, Murraba Street

Cause: Replace hydrants

Ispot: 63466055

W/O: 60003137

Notif: 1000371572

south

 
18 Aug - Friday
Road closures

Planned - Road closure - Tugun

Day 292 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 179 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 40 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 33 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 33 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 33 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 33 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Carrara

Day 30 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 25 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 23 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 22 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 19 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Parkwood

Day 19 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 18 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 17 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 17 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 15

Streets affected: Berrigans Road (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 6.30am - 5pm

Reason: Kerb and Channel works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 15 of 15

Streets affected: Riverdowns Crescent (half road closure with hold and release for 2 minutes maximum) between Dawson Court and Clarence Drive

Show more

Start date: 4 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 12 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 12 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Bundall

Day 11 of 11

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Strathaird Road and Ascot Court

            

Show more

Start date: 8 August 2017

End date: 18 August 2017

Duration: 12am - 11.59pm

Reason: Sewer works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 11 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 11 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 11 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 9 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 9 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 6

Streets affected: Enderley Avenue (lane closure) between Surfers Paradise Boulevard and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works on existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 6

Streets affected: River Terrace (lane closure) between Enderley Avenue and Cul-de-sac

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 6:30am - 5pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 6

Streets affected: Via Roma (single lane closures of a multi-lane road - at least one lane in both directions along Via Roma to be trafficable at all times) between Verona Avenue and Bridge

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9am - 2:30pm

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 6

Streets affected: Rememberance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Rememberance Drive to be trafficable at all times) between Markwell Avenue and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 6

Streets affected: Markwell Avenue (lane closure) between Remembrance Drive and Surfers Paradise Boulevard

Show more

Start date: 13 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 9pm - 5am

Reason: Survey works of existing stormwater network

central

Road closures

Planned - Temporary Road Closure Tugun

Day 5 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 5 of 5

Streets affected: Teemangum Street (half road closure with hold and release for 2 minutes maximum) between 30 Teemangum Street and Cooinda Avenue

 

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 6.30am - 4.30pm

Reason: Stormwater Investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 5 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Paradise Point

Day 5 of 5

Streets affected: The Esplanade (half road closure with hold and release for 2 minutes maximum) between Abalone Avenue and Bruce Avenue

Show more

Start date: 14 August 2017

End date: 18 August 2017

Duration: 7am - 5pm

Reason: Installation of coloured pavement coatings                

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 5 of 5

Streets affected: Marine Parade (lane closure) between Lord Street and Garrick Street

Show more

Start date: 14 August 2017

End date: 18 August 2017

1 day only between dates                  

Duration: 7.30am - 3.30pm

Reason: Detector loop replacement

south

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 16

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Marine Parade 

Show more

Start date: 16 August 2017

End date: 31 August 2017

Duration: 5am - 9am

Reason: Standing new light poles                  

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 13

Streets affected: Clifford Street (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 18 August 2017

End date: 30 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Water and sewerage

Planned - Water interruption - Coolangatta

9.00am - 2.00pm

Streets affected: Stapylton Street, Dutton Street, Tweed Street

Cause: Replace hydrants

Ispot: 63460714

W/O: 60003137

Notif: 1000371570

south

 
19 Aug - Saturday
Road closures

Planned - Road closure - Tugun

Day 293 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 180 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 41 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 34 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 34 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 34 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 34 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Carrara

Day 31 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 26 of 26

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and Lord Street

Show more

Start date: 24 July 2017

End date: 19 August 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 24 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 23 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Labrodor

Day 20 of 20

Streets affected: Wilson Street (half road closure with hold and release for 2 minutes maximum) between Robert Street and Edward Street

Show more

Start date: 31 July 2017

End date: 19 August 2017

Duration: 6.30am - 6pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Parkwood

Day 20 of 20

Streets affected: Henry Cotton Drive (#147) (lane closure) between Santa Rosa Place and Wintergreen Drive

Show more

Start date: 31 July 2017

End date: 19 August 2017

1 day only between dates                  

Duration: 9am - 3pm

Reason: Bus stop upgrade

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 19 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 18 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 18 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 13 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 13 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 12 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 12 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 10 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 10 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Tugun

Day 6 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 6 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 16

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Marine Parade 

Show more

Start date: 16 August 2017

End date: 31 August 2017

Duration: 5am - 9am

Reason: Standing new light poles                  

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 13

Streets affected: Clifford Street (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 18 August 2017

End date: 30 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Water and sewerage

Planned - Water interruption - Arundel

7.00am - 12.00pm

Streets affected: Newheath Drive

Cause: Work on water main

Ispot: 63467875

W/O: 52009131

Notif: 1000364107

central

 
20 Aug - Sunday
Road closures

Planned - Road closure - Tugun

Day 294 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 181 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 42 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 35 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 35 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 35 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 35 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Carrara

Day 32 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 25 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 24 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 20 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 19 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 19 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 14 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 14 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 14 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 13 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 13 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 13 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 11 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Tugun

Day 7 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 7 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 16

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Marine Parade 

Show more

Start date: 16 August 2017

End date: 31 August 2017

Duration: 5am - 9am

Reason: Standing new light poles                  

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 13

Streets affected: Clifford Street (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 18 August 2017

End date: 30 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

 
21 Aug - Monday
Road closures

Planned - Road closure - Tugun

Day 295 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 182 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 43 of 43

Streets affected: Gemvale Road (half road closure with hold and release for 2 minutes maximum) between Alvey Court and Stapley Drive

Show more

Start date: 10 July 2017

End date: 21 August 2017

Duration: 7am - 5pm

Reason: Construction of emergency storage

south

Road closures

Planned - Temporary Road Closure Southport

Day 36 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 36 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 36 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 36 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Carrara

Day 33 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 26 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 25 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 21 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 20 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 20 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 15 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Coombabah

Day 15 of 15

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Chesterfield Place and Limetree Parade

 

Show more

Start date: 7 August 2017

End date: 21 August 2017

Duration: 9am - 3pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 14 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 14 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 14 of 14

Streets affected: Alexandra Avenue (half road closure with hold and release for 2 minutes maximum) between Mary Avenue and Gold Coast Highway

Show more

Start date: 8 August 2017

End date: 21 August 2017

Duration: 9am - 2.30pm

Reason: Construction of new island

south

Road closures

Planned - Temporary Road Closure Ashmore

Day 14 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 12 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 9 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Tugun

Day 8 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 8 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 16

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Marine Parade 

Show more

Start date: 16 August 2017

End date: 31 August 2017

Duration: 5am - 9am

Reason: Standing new light poles                  

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 13

Streets affected: Clifford Street (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 18 August 2017

End date: 30 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Palm Beach

Day 1 of 10

Streets affected: Twenty Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 21 August 2017

End date: 30 September 2017

Duration: 6.30am - 3.30pm

Reason: Kerb reconstruction

south

Water and sewerage

Planned - Water interruption - Tallebudgera

9.00am - 2.00pm

Streets affected: Robert Drive, Sulzberger Place

Cause: Repair work on water main

Ispot: 64117807

W/O: 52009219

Notif: 1000372972

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 0 of 11

Streets affected: Sixth Avenue (full road closure local traffic access only) between Gold Coast Highway and Cypress Avenue

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7pm - 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 0 of 11

Streets affected: Fifth Avenue (full road closure local traffic access only) between Gold Coast Highway and Cypress Terrace

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7pm - 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 0 of 11

Streets affected: Allied Drive (full road closure local traffic access only) between Open Drive and Muirfield Place

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works

north

Water and sewerage

Planned - Water interruption - Biggera Waters

Day 1 of 2

Streets affected: Fiona Street, Burrows Street

Cause: Replace hydrants

Ispot: 64075603

W/O: 60003137

Notif: 1000373060

Show more

Start time and date: 10.00pm, 21 August 2017

End time and date: 3.00am, 22 August 2017

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 1 of 11

Streets affected: Ferny Avenue and Ocean Avenue (lane closure) between Ocean Avenue and Surfers Paradise Boulevard

Show more

Start date: 21 August 2017

End date: 31 August 2017

1-2 day only between dates                  

Duration: 10.30pm - 5.30am

Reason: Manhole refurbishment

central

 
22 Aug - Tuesday
Road closures

Planned - Road closure - Tugun

Day 296 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 183 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Southport

Day 37 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 37 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 37 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 37 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Carrara

Day 34 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 27 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 26 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 22 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 21 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 21 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 16 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Robina

Day 16 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 15 of 15

Streets affected: Borona Drive (full road closure local traffic access only) between Benowa Road and the Cul-de-sac

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Southport

Day 15 of 15

Streets affected: Dandar Drive (half road closure with hold and release for 2 minutes maximum) between Kindra Avenue and Ward Street

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 15 of 15

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Hillview Parade and Currumbarra Road

 

Show more

Start date: 8 August 2017

End date: 22 August 2017

Duration: 9.30am - 2.30pm

Reason: Geotechnical testing

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 13 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 10 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Tugun

Day 9 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 9 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 16

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Marine Parade 

Show more

Start date: 16 August 2017

End date: 31 August 2017

Duration: 5am - 9am

Reason: Standing new light poles                  

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 13

Streets affected: Clifford Street (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 18 August 2017

End date: 30 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Palm Beach

Day 2 of 10

Streets affected: Twenty Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 21 August 2017

End date: 30 September 2017

Duration: 6.30am - 3.30pm

Reason: Kerb reconstruction

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 1 of 11

Streets affected: Sixth Avenue (full road closure local traffic access only) between Gold Coast Highway and Cypress Avenue

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7pm - 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 1 of 11

Streets affected: Fifth Avenue (full road closure local traffic access only) between Gold Coast Highway and Cypress Terrace

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7pm - 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 1 of 11

Streets affected: Allied Drive (full road closure local traffic access only) between Open Drive and Muirfield Place

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works

north

Water and sewerage

Planned - Water interruption - Biggera Waters

Day 2 of 2

Streets affected: Fiona Street, Burrows Street

Cause: Replace hydrants

Ispot: 64075603

W/O: 60003137

Notif: 1000373060

Show more

Start time and date: 10.00pm, 21 August 2017

End time and date: 3.00am, 22 August 2017

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 2 of 11

Streets affected: Ferny Avenue and Ocean Avenue (lane closure) between Ocean Avenue and Surfers Paradise Boulevard

Show more

Start date: 21 August 2017

End date: 31 August 2017

1-2 day only between dates                  

Duration: 10.30pm - 5.30am

Reason: Manhole refurbishment

central

Water and sewerage

Planned - Water interruption - Main Beach

Day 1 of 2

Streets affected: Seaworld Drive

Cause: Replace hydrants

Ispot: 64076271

W/O: 60003137

Notif: 1000373014

Show more

Start time and date: 10.00pm, 22 August 2017

End time and date: 3.00am, 23 August 2017

central

 
23 Aug - Wednesday
Road closures

Planned - Road closure - Tugun

Day 297 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 184 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Southport

Day 38 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 38 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 38 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 38 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Carrara

Day 35 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 28 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 27 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 23 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 22 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 22 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 17 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Robina

Day 17 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 14 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Tugun

Day 10 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 10 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 10 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 16

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Marine Parade 

Show more

Start date: 16 August 2017

End date: 31 August 2017

Duration: 5am - 9am

Reason: Standing new light poles                  

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 13

Streets affected: Clifford Street (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 18 August 2017

End date: 30 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 10

Streets affected: Twenty Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 21 August 2017

End date: 30 September 2017

Duration: 6.30am - 3.30pm

Reason: Kerb reconstruction

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 2 of 11

Streets affected: Sixth Avenue (full road closure local traffic access only) between Gold Coast Highway and Cypress Avenue

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7pm - 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 2 of 11

Streets affected: Fifth Avenue (full road closure local traffic access only) between Gold Coast Highway and Cypress Terrace

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7pm - 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 2 of 11

Streets affected: Allied Drive (full road closure local traffic access only) between Open Drive and Muirfield Place

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 11

Streets affected: Ferny Avenue and Ocean Avenue (lane closure) between Ocean Avenue and Surfers Paradise Boulevard

Show more

Start date: 21 August 2017

End date: 31 August 2017

1-2 day only between dates                  

Duration: 10.30pm - 5.30am

Reason: Manhole refurbishment

central

Water and sewerage

Planned - Water interruption - Main Beach

Day 2 of 2

Streets affected: Seaworld Drive

Cause: Replace hydrants

Ispot: 64076271

W/O: 60003137

Notif: 1000373014

Show more

Start time and date: 10.00pm, 22 August 2017

End time and date: 3.00am, 23 August 2017

central

Water and sewerage

Planned - Water interruption - Broadbeach Waters

9.00am - 2.00pm

Streets affected: Bermuda Street

Cause: Replace hydrants

Ispot: 64077580

W/O: 60003137

Notif: 1000373061

central

Water and sewerage

Planned - Water Interruption - Southport

1.30pm - 6.30pm

Streets affected: Southport Nerang Road, Olney Court

Cause: Replace hydrants

Ispot: 64077436

W/O: 60003137

Notif: 1000373030

 

central

 
24 Aug - Thursday
Road closures

Planned - Road closure - Tugun

Day 298 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 185 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Southport

Day 39 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 39 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 39 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 39 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Carrara

Day 36 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 29 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 28 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 24 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 23 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road

Show more

Start date: 2 August 2017

End date: 31 October 2017

1 day only between dates                  

Duration: 12am - 11.59pm

Reason: Asphalt works

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 23 of 66

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Silerpine Crescent

Show more

Start date 2 August 2017

End date: 6 October 2017

Duration: 7am - 5pm

Reason: Sewerage works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 18 of 19

Streets affected: Gold Coast Highway (lane closure) between Australia Avenue and Queensland Avenue

 

Show more

Start date: 7 August 2017

End date: 25 August 2017

5 days only between dates                  

Duration: 6am - 2.30pm

Reason: Fibre optics

south

Road closures

Planned - Temporary Road Closure Robina

Day 18 of 25

Streets affected: Robina Parkway (lane closure) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 7 August 2017

End date: 13 August 2017

1 day only between dates                  

Duration: 7pm - 4am

Reason: Replacement of pipe fitting in sewer valve

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 16

Streets affected: Southern Cross Road (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Cul-de-sac

Show more

Start date: 10 August 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Main Beach

Day 15 of 22

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Mountbatten Avenue and Main Beach Parade

 

Show more

Start date: 10 August 2017

End date: 31 August 2017

Duration: 7am - 5pm

Reason: Sewer main relining project

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 18

Streets affected: Remembrance Drive (single lane closures of a multi-lane road - at least one lane in both directions along Remembrance Drive to be trafficable at all times) between Via Roma and Beach Road

 

Show more

Start date: 13 August 2017

End date: 30 August 2017

Duration: 7pm - 6am

Reason: Asphalt works

central

Road closures

Planned - Temporary Road Closure Tugun

Day 11 of 109

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Dune Street and Short Street

 

Show more

Start date: 14 August 2017

End date: 30 November 2017

Duration: 6.30am - 3.30pm

Reason: Upgrade of road pavement and footpath construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 50

Streets affected: Surf Parade and Margaret Avenue (full road closure local traffic access only) between Gold Coast Highway and Mary Avenue, Alexandra Avenue and George Avenue

 

Show more

Start date: 14 August 2017 and 28 August 2017

End date: 25 August 2017 and 2 October 2017

Duration: 6.30am - 4.30pm

Reason: Intersection upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 11 of 26

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Gold Coast Highway

Show more

Start date: 14 August 2017

End date: 8 September 2017

Duration: 6:30am - 4pm

Reason: Installation of electrical conduit, lighting poles and street furniture                  

central

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 11 of 75

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 14 August 2017

End date: 27 October 2017

Duration: 7am - 4pm

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Southport

Day 10 of 18

Streets affected: Musgrave Avenue (half road closure with hold and release for 2 minutes maximum) between Sandy Court and Brooke Avenue

Show more

Start date: 14 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 11

Streets affected: Reedy Creek Road (lane closure) between Bermuda Street and Dover Drive

Show more

Start date: 15 August 2017

End date: 28 August 2017

1 day only between dates                  

Duration: 7am - 4pm

Reason: Construction of new bus stop

south

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 17

Streets affected: Government Road (half road closure with hold and release for 2 minutes maximum) between Bellevue Parade and Algona Street

 

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 8pm - 5am

Reason: Sewer main relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 17

Streets affected:  Kumbari Avenue (half road closure with hold and release for 2 minutes maximum) between Nakina Street and Nakina Street

Show more

Start date: 15 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 16

Streets affected: Nerang Street Mall (half road closure with hold and release for 2 minutes maximum) between Scarborough Street and Marine Parade 

Show more

Start date: 16 August 2017

End date: 31 August 2017

Duration: 5am - 9am

Reason: Standing new light poles                  

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 16

Streets affected: Northcliffe Terrace (half road closure with hold and release for 2 minutes maximum) between Hamilton Avenue and Enderley Avenue          

Show more

Start date: 16 August 2017

End date: 1 September 2017

Duration: 10pm - 5am

Reason: Sewer mains relining program

central

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 13

Streets affected: Clifford Street (half road closure with hold and release for 2 minutes maximum) between Northcliffe Terrace and Surfers Paradise Boulevard

 

Show more

Start date: 18 August 2017

End date: 30 August 2017

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

central

Road closures

Planned - Temporary Road Closure Palm Beach

Day 4 of 10

Streets affected: Twenty Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 21 August 2017

End date: 30 September 2017

Duration: 6.30am - 3.30pm

Reason: Kerb reconstruction

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 11

Streets affected: Sixth Avenue (full road closure local traffic access only) between Gold Coast Highway and Cypress Avenue

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7pm - 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 11

Streets affected: Fifth Avenue (full road closure local traffic access only) between Gold Coast Highway and Cypress Terrace

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7pm - 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 3 of 11

Streets affected: Allied Drive (full road closure local traffic access only) between Open Drive and Muirfield Place

 

Show more

Start date: 21 August 2017

End date: 1 September 2017

Duration: 7am - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 11

Streets affected: Ferny Avenue and Ocean Avenue (lane closure) between Ocean Avenue and Surfers Paradise Boulevard

Show more

Start date: 21 August 2017

End date: 31 August 2017

1-2 day only between dates                  

Duration: 10.30pm - 5.30am

Reason: Manhole refurbishment

central

Mosquito spraying

Planned - Biting Midge Canal Beach Treatment - Broadbeach Waters, Miami

5.00am - 8.30am

Areas affected: Broadbeach Waters, Miami

Biting Midge Canal Beach Treatment will be undertaken in these areas on Thursday 24th August 2017 from 5am to 8.30am for control of biting midge larvae (weather permitting)

central

Water and sewerage

Planned - Water interruption - Mermaid Beach

9.00am - 2.00pm

Streets affected: Hilda Street, Hedges Avenue, Gold Coast Highway

Cause: Replace hydrants

Ispot: 64077921

W/O: 60003137

Notif: 1000373094

south

 
25 Aug - Friday
Road closures

Planned - Road closure - Tugun

Day 299 of 366

Streets affected: Tugun Street and Morshead Road (footpath and pedestrian bridge closure)

Show more

Start date: 31 October 2016

End date: 31 October 2017           

Duration: Continuous

Reason: Upgrade and reconstruction of existing open channel

south

Road closures

Planned - Road Closure - Nerang

Day 186 of 192

Streets affected: Boulton Drive from Train Station to Nerang Broadbeach Road then down to Lakeview Drive (half road closure with hold and release for two (2) minutes maximum and parking lane closure) between Boulton Drive and Lakeview Drive

Show more

Start date: 21 February 2017

End date: 31 August 2017                 

Duration: 6:30am - 5pm

Reason: Construction of 3m share path for the Commonwealth Games Works

north

Road closures

Planned - Temporary Road Closure Southport

Day 40 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrine Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of gravity sewer mains

central

Road closures

Planned - Temporary Road Closure Southport

Day 40 of 40

Streets affected: Neville Avenue (half road closure with hold and release for 2 minutes maximum) between Fisher Avenue and Corrie Avenue

Show more

Start date: 17 July 2017

End date: 25 August 2017

Duration: 7am - 5pm

Reason: Construction of sewer main

central

Road closures

Planned - Temporary Road Closure Robina

Day 40 of 71

Streets affected: Christine Avenue (single lane closures of a multi-lane road - at least one lane in both directions along Christine Avenue to be trafficable at all times) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

Duration: 7am - 5pm

Reason: Constructon of emergency storage

south

Road closures

Planned - Temporary Road Closure Robina

Day 40 of 71

Streets affected: Christine Avenue (lane closure) between Konda Way and Varsity Parade

Show more

Start date: 17 July 2017

End date: 25 September 2017

1 day only between dates                  

Duration: 7am - 5pm

Reason: Pump station works

south

Road closures

Planned - Temporary Road Closure Carrara

Day 37 of 154

Streets affected: Eastlake Street (half road closure with hold and release for 2 minutes maximum) between Elysium Drive and End of road

Show more

Start date: 20 July 2017

End date: 20 December 2017

Duration: 7.30am - 3.30pm

Reason: Implementation of Traffic Guidance Scheme/Training

north

Road closures

Planned - Temporary Road Closure Hollywell

Day 30 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Kurrajong Avenue

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 3am - 5pm

Reason: Man hole works

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 29 of 31

Streets affected: Thomas Drive (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Stanhill Drive

Show more

Start date: 27 July 2017

End date: 27 August 2017

Duration: 8pm - 5am

Reason: Guardrail upgrade

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 25 of 32

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Bluegum Avenue and Jasmine Avenue

                    

Show more

Start date: 1 August 2017

End date: 1 September 2017

Duration: 10am - 2pm

Reason: Relining sewer

north

Road closures

Planned - Temporary Road Closure Yatala

Day 24 of 91

Streets affected: Burnside Road (lane closure) between Eastern Service Road and Prairie Road