Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.

Legend:

unplanned

planned

October 2020

Jump to today
1 Oct - Thursday
Water and sewerage

Unplanned - Water Interruption - Robina

11.00pm - 4.00pm

Streets affected: Cheltenham Drive, Killarney Avenue, Bellbrook Close, Belmore Close

Cause: Repair water main

W/O: 20624021

Notif: 1000707225

Show more

Start time and date: 11.00pm, 30 September 2020

End time and date: 2.00pm, 1 October 2020

south

Water and sewerage

Unplanned - Water Interruption - Currumbim Waters

12.00pm - 1.22pm

Energex Power outage, Simpsons Road water pump station has no power, resulting multiple properties with out water.

south

Water and sewerage

Unplanned - Water Interruption - Labrador

12.10pm - 12.40pm

Streets affected: Walter Street

Cause: Water Leak

W/O: 20623955

Notif: 1000707101

north

Water and sewerage

Unplanned - Water Interruption - Miami

2.00pm - 4.00pm

Streets affected: Nobby Parade

Cause: Water Leak

W/O: 20623296

Notif: 1000706316

south

Water and sewerage

Unplanned - Water Interruption - Worongary

2.20pm - 3.20pm

Streets Affected : Lexington , Newheven ,Meadowland ,Curragh 

Causes : Repair Water Main

W/O : 60008242

Notif : 1000690789

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 410 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 95 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 69 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 67 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 67 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 60 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 57 of 57

Streets affected: Gawthern Drive (partial lane closure with traffic control – expect delays) between Yawalpah Road and Chrome Drive

Show more

Start date: 6 August 2020

End date: 1 October 2020

Duration: Midnight – 11:59pm

Reason: Service realignment / location works for future road widening

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 57 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 55 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 53 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 52 of 53

Streets affected: Waikiki Avenue (full road closure local traffic access only) between Celebes Avenue and End of road

Show more

Date 1: 11 August 2020 to 22 August 2020

Date 2: 11 September 2020 to 17 September 2020

Date 3:  29 September 2020 to 2 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 48 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 46 of 50

Streets affected: Morseby Avenue (full road closure local traffic access only) between Cuba Avenue and Timor Avenue

Show more

Date 1: 17 August 2020 to 26 August 2020

Date 2: 15 September 2020 to 18 September 2020

Date 3:  1 October 2020 to 5 October 2020

Duration: 6:30am – 5:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 43 of 51

Streets affected: Manila Avenue (full road closure local traffic access only) between Laguna Avenue and End of road

Show more

Date 1: 20 August 2020 to 2 September 2020

Date 2: 17 September 2020 to 21 September 2020

Date 3:  5 October 2020 to 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 42 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 42 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 42 of 42

Streets affected: Eastlake Street (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 21 August 2020

End date: 1 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 42 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 32 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 32 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 32 of 34

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Village Boulevard and Hotham Creek

Show more

Start date: 31 August 2020

End date: 3 October 2020

Duration: 6:30am – 5pm

Reason: Footpath construction, batter works, stormwater works, tree removal and electrical works lighting

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 30 of 38

Streets affected: Cotlew Street (Reduced lanes) between Currumburra Road and Wardoo Street

Show more

Start date: 2 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate concreting shared path, pram ramps, driveway construction works including bus stop installation

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 29 of 35

Streets affected: Ferny Avenue (Reduced lanes) between Elkhorn Avenue and Staghorn Avenue

Show more

Also affected: Cypress Avenue

Start date: 2 September 2020

End date: 7 October 2020

Duration: 8pm – 5am

Reason: To facilitate the installation of new conduits and signal footings

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 28 of 28

Streets affected: Old Burleigh Road (half road closure with traffic control – expect delays) between Elizabeth Avenue and Victoria Avenue

Show more

Also affected: Charles Avenue

Start date: 4 September 2020

End date: 1 October 2020

Duration: 8am – 5pm

Reason: To facilitate the installation of decorative lights and restoration works

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 27 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 25 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 24 of 27

Streets affected: Clagiraba Road (half road closure with traffic control – expect delays) between Nerang Murwillumbah Road and Bellis Road, also between Beaudesert Nerang Road and Thendara Drive

Show more

Also affected: Cladiara Road, Arunta Drive, Gerara Court, Glen Circuit and Witheren Road

Start date: 8 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: Profile patch road failures and asphalt

north

Road closures

Planned - Temporary Road Closure - Robina

Day 23 of 29

Streets affected: Cheltenham Drive (Reduced lanes) between Woody Views Way and Poppy Lane

Show more

Start date: 9 September 2020

End date: 7 October 2020

Duration 1: 9am – 2pm (Monday to Friday)

Duration 2: 6:30am - 12:30pm (Saturday only)

Reason: To facilitate the installation of bike ramps including a cut through on the traffic island

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 18 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 18 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 18 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Robina

Day 18 of 19

Streets affected: Robina Town Centre Drive (Reduced lanes) between Robina Parkway and Scottsdale Drive

Show more

Also affected: Christine Avenue

Start date: 14 September 2020

End date: 2 October 2020

Duration: 9am – 3pm

Reason: To facilitate the installation of new signal lanterns and Bonus LT

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 17 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 16 of 20

Streets affected: Golden Four Drive (traffic control, half road - expect delays) between Graham Street and Cahill Street

Start date: 16 September 2020

End date: 5 October 2020 
 
Duration: 7.00am - 5.00pm

Reason: Closure to facilitate asphalt resurfacing

south

Road closures

Planned - Temporary Road Closure - Southport

Day 14 of 15

Streets affected: Cotlew Street / Cotlew Street East (Reduced lanes) between Ferry Road and Loweana Street

Show more

Also affected: Benowa Road

Start date: 18 September 2020

End date: 2 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate tree pruning along shoulders and centre median

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 13 of 14

Streets affected: Hargraves Road (traffic control/half road - expect delays) between Reindeer Street/Caribou Crescent and Roe Street/Fawn Street

Start date: 19 September 2020

End date: 2 October 2020
 
Duration: 12.00am to 11.59pm

Reason: Reconstruction of 2 x Bus Stops including concrete slab and structure on Hargraves Road Upper Coomera

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 13 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 13 of 15

Streets affected: Universal Street (half road closure with traffic control – expect delays) between Edgemount Court and Studio Drive

Show more

Start date: 19 September 2020

End date: 3 October 2020

Duration: 6:30am – 6:30pm

Reason: Profiling and sealing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 13 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 13 of 16

Streets affected: Napper Road (Reduced lanes) between Captain Cook Drive and Arundel Drive

Show more

Start date: 19 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new signal lanterns and bonus LT

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 13 of 14

Streets affected: Hargraves Road (Continuous verge/footpath - expect delays) between Reindeer Street/Caribou Crescent and Roe Street/Fawn Street

Start date: 19 September 2020

End date: 2 October 2020
 
Duration: 6.30am to 6.30pm

Reason: Reconstruction of 2 x Bus Stops including concrete slab and structure on Hargraves Road Upper Coomera

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 12 of 15

Streets affected: Koolewong Parade (half road closure with traffic control – expect delays) between Tumbarumba Avenue and Kanni Court

Show more

Start date: 19 September 2020

End date: 4 October 2020

Duration: 7am – Midnight

Reason: To facilitate stormwater pipe works

north

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 11 of 15

Streets affected: Currumbin Creek Road (half road closure with traffic control – expect delays) between Braewood Drive and Bains Road

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road resurfacing

south

Road closures

Planned - Temporary Road Closure - Tallebudgera

Day 11 of 15

Streets affected: Syndicate Road (half road closure with traffic control – expect delays) between Tallebudgera Creek Road and Des Quinlan Crescent

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, repairs, patches and sealing

south

Road closures

Planned - Temporary Road Closure - Labrador

Day 11 of 14

Streets affected: Turpin Road (half road closure with traffic control – expect delays) between Chirn Crescent and Third Avenue

Show more

Start date: 21 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries of large building components

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 11 of 19

Streets affected: Billinghurst Crescent (half road closure with traffic control – expect delays) between Williamson Road and Turnbull Drive

Show more

Start date: 21 September 2020

End date: 9 October 2020

Duration 1: 6:30am – 6:30pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Works to widen parking lanes to accommodate school bus parking and reconstruction of footpath on both sides with pedestrian ramps

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 11 of 13

Streets affected: Turpin Road (half road closure with detour - traffic control on site) between Gordon Street and Imperial Parade

Show more

Start date: 21 September 2020

End date: 3 October 2020

Duration: 9am – 3pm

Reason: To facilitate tree trimming works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 10 of 17

Streets affected: Main Beach Parade (half road closure with detour - traffic control on site) between Macarthur Parade and Cunningham Avenue

Show more

Start date: 22 September 2020

End date: 8 October 2020

Duration: 12:15am – 4:30am

Reason: Inspect and perform repairs to 'sewer' access hole

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 10 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 8 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 7 of 15

Streets affected: Brisbane Road (full road closure local traffic access only) between Government Road and Harley Street

Show more

Start date: 25 September 2020

End date: 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the installation of water connection

north

Road closures

Planned - Temporary Road Closure - Bilinga

Day 7 of 8

Streets affected: Lang Street (half road closure with detour - traffic control on site) between Golden Four Drive and Pacific Parade

Show more

Start date: 25 September 2020

End date: 2 October 2020

Duration: 6:30am – 6:30pm

Reason: Large concrete pour

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 6 of 8

Streets affected: Alexandra Avenue (half road closure with detour - traffic control on site) between Mary Avenue and Old Burleigh Road

Show more

Preferred date: 26 September 2020 (only)

Contingency date: 3 October 2020 (only)

Duration: 5am – 6:30pm

Reason: Westbound detour to facilitate large concrete pour

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 4 of 12

Streets affected: Nerang Street (half road closure with traffic control – expect delays) between Ferry Street and Short Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 4 of 12

Streets affected: Short Street (half road closure with traffic control – expect delays) between Price Street and Nerang Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 4 of 12

Streets affected: Dutton Street (half road closure with traffic control – expect delays) between Griffith Street and Marine Parade

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 4 of 12

Streets affected: Gemvale Road (half road closure with traffic control – expect delays) between Stapley Drive and Eden View Drive

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 4 of 12

Streets affected: Mitchell Avenue (half road closure with traffic control – expect delays) between Duringan Street and W View Road

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 3pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 4 of 5

Streets affected: Coolangatta Road (Reduced lanes) between Musgrave Street and Lang Street

Show more

Start date: 28 September 2020

End date: 2 October 2020

Duration: 9am – 3pm

Reason: Installation of new loops

south

Bushfires

Planned - Bushfire hazard reduction burn – Reedy Creek

Day 3 of 3

Start : 7am, Tuesday 29th September 2020 (weather permitting)
End : 4pm, Thursday 1 October 2020
Duration:   3 days

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

central

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 3 of 4

Streets affected: West Street (full road closure local traffic access only) between Gold Coast Highway and James Street

Show more

Start date: 29 September 2020

End date: 2 October 2020

Duration: 7am – 5pm

Reason: To facilitate the installation of electrical lights into an adjacent tree

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 2 of 8

Streets affected: Chalk Street (full road closure local traffic access only) between McLean Street and Warner Street

Show more

Start date: 30 September 2020

End date: 7 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Water and sewerage

Planned - Sewer works - Currumbin

8.00pm - 6.00am

Streets affected: Noojee Street and Michel Drive Currumbin

Cause:  Sewer works to relocate assets due to DTMR's M1 upgrade

W/O: 60008411

Notif: 1000702893

Ispot/Pathway: 77715239

Show more

Start time and date: 08.00pm, 30 Sept
End time and date: 06.00am, 01 Oct

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 1 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Biggera Waters, Hollywell, Hope Island, Oyster Cove, Paradise Point, Runaway Bay, Sovereign Island

4.00am - 6.00am

Areas affected: Biggera Waters, Hollywell, Hope Island, Oyster Cove, Paradise Point, Runaway Bay, Sovereign Island

 

Mosquito/biting midge spraying will be undertaken in these areas on Thursday 1st October 2020 from 4am to 6am for control of mosquitos and biting midges (weather permitting).

all regions

Road closures

Planned - Temporary Road Closure - Labrador

Day 1 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 1 of 7

Streets affected: Gold Coast Highway (Reduced lanes) between Rosewood Avenue and Britannia Avenue

Show more

Start date: 1 October 2020

End date: 7 October 2020

Duration: 6:30am – 2pm

Reason: To facilitate the removal of scaffolding

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 1 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Water and sewerage

Planned - Water Interruption - Runaway Bay

9.00am - 2.00pm

Streets affected: Runaway Bay Ave, Huon Cres, Daru Ave, Shearwater Esplanade Sandakan Ave Runaway Bay

Cause:  Water Shutdown for Hydrant replacement

W/O: 60008181

Notif: 1000698651

Ispot/Pathway: 7749353

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 1 of 9

Streets affected: Campbell Street (half road closure with traffic control – expect delays) between Saywell Street and Rowes Court

Show more

Start date: 1 October 2020

End date: 9 October 2020

Duration: 9am – 11pm

Reason: Cleaning and relining of stormwater pipe

north

 
2 Oct - Friday
Water and sewerage

Unplanned - Water Interruption - Mermaid Waters

9.00am - 10.00am

Streets affected: Wild Duck Drive

Cause: Water Leak

W/O: 60008456

Notif: 1000707405

south

Water and sewerage

Unplanned - Water Interruption - Surfers Paradise

10.30am - 12.30pm

Streets affected: Salerno Street

Cause: Water Leak

W/O: 20623601

Notif: 1000706671

south

Water and sewerage

Unplanned - Water Interruption - Yatala

12.15pm - 1.15pm

Streets affected: Pagan Road

Cause: Water Leak

W/O: 20622282

Notif: 1000705041

north

Water and sewerage

Unplanned - Water Interruption - Carrara

12.50pm - 1.50pm

Streets affected: Bajada Place

Cause: Water Leak

W/O: 20623876

Notif: 1000706995

north

Water and sewerage

Unplanned - Water Interruption - Carrara

1.35pm - 2.35pm

Streets affected: Peal Court, Hickey Way, Lark Court, Baltimore Court

Cause: Water Leak

W/O: 20623941

Notif: 1000707078

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 411 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 96 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 70 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 68 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 68 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 61 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 58 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 56 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 54 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 53 of 53

Streets affected: Waikiki Avenue (full road closure local traffic access only) between Celebes Avenue and End of road

Show more

Date 1: 11 August 2020 to 22 August 2020

Date 2: 11 September 2020 to 17 September 2020

Date 3:  29 September 2020 to 2 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 49 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 47 of 50

Streets affected: Morseby Avenue (full road closure local traffic access only) between Cuba Avenue and Timor Avenue

Show more

Date 1: 17 August 2020 to 26 August 2020

Date 2: 15 September 2020 to 18 September 2020

Date 3:  1 October 2020 to 5 October 2020

Duration: 6:30am – 5:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 44 of 51

Streets affected: Manila Avenue (full road closure local traffic access only) between Laguna Avenue and End of road

Show more

Date 1: 20 August 2020 to 2 September 2020

Date 2: 17 September 2020 to 21 September 2020

Date 3:  5 October 2020 to 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 43 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 43 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 43 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 33 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 33 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 33 of 34

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Village Boulevard and Hotham Creek

Show more

Start date: 31 August 2020

End date: 3 October 2020

Duration: 6:30am – 5pm

Reason: Footpath construction, batter works, stormwater works, tree removal and electrical works lighting

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 31 of 38

Streets affected: Cotlew Street (Reduced lanes) between Currumburra Road and Wardoo Street

Show more

Start date: 2 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate concreting shared path, pram ramps, driveway construction works including bus stop installation

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 30 of 35

Streets affected: Ferny Avenue (Reduced lanes) between Elkhorn Avenue and Staghorn Avenue

Show more

Also affected: Cypress Avenue

Start date: 2 September 2020

End date: 7 October 2020

Duration: 8pm – 5am

Reason: To facilitate the installation of new conduits and signal footings

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 28 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 26 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 25 of 27

Streets affected: Clagiraba Road (half road closure with traffic control – expect delays) between Nerang Murwillumbah Road and Bellis Road, also between Beaudesert Nerang Road and Thendara Drive

Show more

Also affected: Cladiara Road, Arunta Drive, Gerara Court, Glen Circuit and Witheren Road

Start date: 8 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: Profile patch road failures and asphalt

north

Road closures

Planned - Temporary Road Closure - Robina

Day 24 of 29

Streets affected: Cheltenham Drive (Reduced lanes) between Woody Views Way and Poppy Lane

Show more

Start date: 9 September 2020

End date: 7 October 2020

Duration 1: 9am – 2pm (Monday to Friday)

Duration 2: 6:30am - 12:30pm (Saturday only)

Reason: To facilitate the installation of bike ramps including a cut through on the traffic island

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 19 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 19 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 19 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Robina

Day 19 of 19

Streets affected: Robina Town Centre Drive (Reduced lanes) between Robina Parkway and Scottsdale Drive

Show more

Also affected: Christine Avenue

Start date: 14 September 2020

End date: 2 October 2020

Duration: 9am – 3pm

Reason: To facilitate the installation of new signal lanterns and Bonus LT

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 18 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 17 of 20

Streets affected: Golden Four Drive (traffic control, half road - expect delays) between Graham Street and Cahill Street

Start date: 16 September 2020

End date: 5 October 2020 
 
Duration: 7.00am - 5.00pm

Reason: Closure to facilitate asphalt resurfacing

south

Road closures

Planned - Temporary Road Closure - Southport

Day 15 of 15

Streets affected: Cotlew Street / Cotlew Street East (Reduced lanes) between Ferry Road and Loweana Street

Show more

Also affected: Benowa Road

Start date: 18 September 2020

End date: 2 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate tree pruning along shoulders and centre median

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 14 of 14

Streets affected: Hargraves Road (traffic control/half road - expect delays) between Reindeer Street/Caribou Crescent and Roe Street/Fawn Street

Start date: 19 September 2020

End date: 2 October 2020
 
Duration: 12.00am to 11.59pm

Reason: Reconstruction of 2 x Bus Stops including concrete slab and structure on Hargraves Road Upper Coomera

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 14 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 14 of 15

Streets affected: Universal Street (half road closure with traffic control – expect delays) between Edgemount Court and Studio Drive

Show more

Start date: 19 September 2020

End date: 3 October 2020

Duration: 6:30am – 6:30pm

Reason: Profiling and sealing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 14 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 14 of 16

Streets affected: Napper Road (Reduced lanes) between Captain Cook Drive and Arundel Drive

Show more

Start date: 19 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new signal lanterns and bonus LT

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 14 of 14

Streets affected: Hargraves Road (Continuous verge/footpath - expect delays) between Reindeer Street/Caribou Crescent and Roe Street/Fawn Street

Start date: 19 September 2020

End date: 2 October 2020
 
Duration: 6.30am to 6.30pm

Reason: Reconstruction of 2 x Bus Stops including concrete slab and structure on Hargraves Road Upper Coomera

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 13 of 15

Streets affected: Koolewong Parade (half road closure with traffic control – expect delays) between Tumbarumba Avenue and Kanni Court

Show more

Start date: 19 September 2020

End date: 4 October 2020

Duration: 7am – Midnight

Reason: To facilitate stormwater pipe works

north

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 12 of 15

Streets affected: Currumbin Creek Road (half road closure with traffic control – expect delays) between Braewood Drive and Bains Road

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road resurfacing

south

Road closures

Planned - Temporary Road Closure - Tallebudgera

Day 12 of 15

Streets affected: Syndicate Road (half road closure with traffic control – expect delays) between Tallebudgera Creek Road and Des Quinlan Crescent

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, repairs, patches and sealing

south

Road closures

Planned - Temporary Road Closure - Labrador

Day 12 of 14

Streets affected: Turpin Road (half road closure with traffic control – expect delays) between Chirn Crescent and Third Avenue

Show more

Start date: 21 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries of large building components

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 12 of 19

Streets affected: Billinghurst Crescent (half road closure with traffic control – expect delays) between Williamson Road and Turnbull Drive

Show more

Start date: 21 September 2020

End date: 9 October 2020

Duration 1: 6:30am – 6:30pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Works to widen parking lanes to accommodate school bus parking and reconstruction of footpath on both sides with pedestrian ramps

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 12 of 13

Streets affected: Turpin Road (half road closure with detour - traffic control on site) between Gordon Street and Imperial Parade

Show more

Start date: 21 September 2020

End date: 3 October 2020

Duration: 9am – 3pm

Reason: To facilitate tree trimming works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 11 of 17

Streets affected: Main Beach Parade (half road closure with detour - traffic control on site) between Macarthur Parade and Cunningham Avenue

Show more

Start date: 22 September 2020

End date: 8 October 2020

Duration: 12:15am – 4:30am

Reason: Inspect and perform repairs to 'sewer' access hole

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 11 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 9 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 8 of 15

Streets affected: Brisbane Road (full road closure local traffic access only) between Government Road and Harley Street

Show more

Start date: 25 September 2020

End date: 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the installation of water connection

north

Road closures

Planned - Temporary Road Closure - Bilinga

Day 8 of 8

Streets affected: Lang Street (half road closure with detour - traffic control on site) between Golden Four Drive and Pacific Parade

Show more

Start date: 25 September 2020

End date: 2 October 2020

Duration: 6:30am – 6:30pm

Reason: Large concrete pour

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 7 of 8

Streets affected: Alexandra Avenue (half road closure with detour - traffic control on site) between Mary Avenue and Old Burleigh Road

Show more

Preferred date: 26 September 2020 (only)

Contingency date: 3 October 2020 (only)

Duration: 5am – 6:30pm

Reason: Westbound detour to facilitate large concrete pour

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 5 of 12

Streets affected: Nerang Street (half road closure with traffic control – expect delays) between Ferry Street and Short Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 5 of 12

Streets affected: Short Street (half road closure with traffic control – expect delays) between Price Street and Nerang Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 5 of 12

Streets affected: Dutton Street (half road closure with traffic control – expect delays) between Griffith Street and Marine Parade

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 5 of 12

Streets affected: Gemvale Road (half road closure with traffic control – expect delays) between Stapley Drive and Eden View Drive

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 5 of 12

Streets affected: Mitchell Avenue (half road closure with traffic control – expect delays) between Duringan Street and W View Road

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 3pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 5 of 5

Streets affected: Coolangatta Road (Reduced lanes) between Musgrave Street and Lang Street

Show more

Start date: 28 September 2020

End date: 2 October 2020

Duration: 9am – 3pm

Reason: Installation of new loops

south

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 4 of 4

Streets affected: West Street (full road closure local traffic access only) between Gold Coast Highway and James Street

Show more

Start date: 29 September 2020

End date: 2 October 2020

Duration: 7am – 5pm

Reason: To facilitate the installation of electrical lights into an adjacent tree

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 3 of 8

Streets affected: Chalk Street (full road closure local traffic access only) between McLean Street and Warner Street

Show more

Start date: 30 September 2020

End date: 7 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 2 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 2 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 2 of 7

Streets affected: Gold Coast Highway (Reduced lanes) between Rosewood Avenue and Britannia Avenue

Show more

Start date: 1 October 2020

End date: 7 October 2020

Duration: 6:30am – 2pm

Reason: To facilitate the removal of scaffolding

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 2 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 2 of 9

Streets affected: Campbell Street (half road closure with traffic control – expect delays) between Saywell Street and Rowes Court

Show more

Start date: 1 October 2020

End date: 9 October 2020

Duration: 9am – 11pm

Reason: Cleaning and relining of stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 1 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Water and sewerage

Planned - Water Interruption - Hollywell

9.00am - 2.00pm

Streets affected: Marina Crescent Hollywell

Cause:  Water Shutdown for Hydrant replacement

W/O: 60008181

Notif: 1000698652

Ispot/Pathway: 7749353

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

 
3 Oct - Saturday
Water and sewerage

Unplanned - Water Interruption - Ashmore

1.45pm - 3.00pm

Streets affected: Kallaroo Crescent

Cause: Water Main Repairs

W/O: 20624264

Notif: 1000707435

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 412 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 97 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 71 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 69 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 69 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 62 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 59 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 57 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 55 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 50 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 48 of 50

Streets affected: Morseby Avenue (full road closure local traffic access only) between Cuba Avenue and Timor Avenue

Show more

Date 1: 17 August 2020 to 26 August 2020

Date 2: 15 September 2020 to 18 September 2020

Date 3:  1 October 2020 to 5 October 2020

Duration: 6:30am – 5:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 45 of 51

Streets affected: Manila Avenue (full road closure local traffic access only) between Laguna Avenue and End of road

Show more

Date 1: 20 August 2020 to 2 September 2020

Date 2: 17 September 2020 to 21 September 2020

Date 3:  5 October 2020 to 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 44 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 44 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 44 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 34 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 34 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 34 of 34

Streets affected: Creek Street (half road closure with traffic control – expect delays) between Village Boulevard and Hotham Creek

Show more

Start date: 31 August 2020

End date: 3 October 2020

Duration: 6:30am – 5pm

Reason: Footpath construction, batter works, stormwater works, tree removal and electrical works lighting

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 32 of 38

Streets affected: Cotlew Street (Reduced lanes) between Currumburra Road and Wardoo Street

Show more

Start date: 2 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate concreting shared path, pram ramps, driveway construction works including bus stop installation

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 31 of 35

Streets affected: Ferny Avenue (Reduced lanes) between Elkhorn Avenue and Staghorn Avenue

Show more

Also affected: Cypress Avenue

Start date: 2 September 2020

End date: 7 October 2020

Duration: 8pm – 5am

Reason: To facilitate the installation of new conduits and signal footings

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 29 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 27 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 26 of 27

Streets affected: Clagiraba Road (half road closure with traffic control – expect delays) between Nerang Murwillumbah Road and Bellis Road, also between Beaudesert Nerang Road and Thendara Drive

Show more

Also affected: Cladiara Road, Arunta Drive, Gerara Court, Glen Circuit and Witheren Road

Start date: 8 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: Profile patch road failures and asphalt

north

Road closures

Planned - Temporary Road Closure - Robina

Day 25 of 29

Streets affected: Cheltenham Drive (Reduced lanes) between Woody Views Way and Poppy Lane

Show more

Start date: 9 September 2020

End date: 7 October 2020

Duration 1: 9am – 2pm (Monday to Friday)

Duration 2: 6:30am - 12:30pm (Saturday only)

Reason: To facilitate the installation of bike ramps including a cut through on the traffic island

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 20 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 20 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 20 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 19 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 18 of 20

Streets affected: Golden Four Drive (traffic control, half road - expect delays) between Graham Street and Cahill Street

Start date: 16 September 2020

End date: 5 October 2020 
 
Duration: 7.00am - 5.00pm

Reason: Closure to facilitate asphalt resurfacing

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 15 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Oxenford

Day 15 of 15

Streets affected: Universal Street (half road closure with traffic control – expect delays) between Edgemount Court and Studio Drive

Show more

Start date: 19 September 2020

End date: 3 October 2020

Duration: 6:30am – 6:30pm

Reason: Profiling and sealing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 15 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 15 of 16

Streets affected: Napper Road (Reduced lanes) between Captain Cook Drive and Arundel Drive

Show more

Start date: 19 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new signal lanterns and bonus LT

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 14 of 15

Streets affected: Koolewong Parade (half road closure with traffic control – expect delays) between Tumbarumba Avenue and Kanni Court

Show more

Start date: 19 September 2020

End date: 4 October 2020

Duration: 7am – Midnight

Reason: To facilitate stormwater pipe works

north

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 13 of 15

Streets affected: Currumbin Creek Road (half road closure with traffic control – expect delays) between Braewood Drive and Bains Road

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road resurfacing

south

Road closures

Planned - Temporary Road Closure - Tallebudgera

Day 13 of 15

Streets affected: Syndicate Road (half road closure with traffic control – expect delays) between Tallebudgera Creek Road and Des Quinlan Crescent

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, repairs, patches and sealing

south

Road closures

Planned - Temporary Road Closure - Labrador

Day 13 of 14

Streets affected: Turpin Road (half road closure with traffic control – expect delays) between Chirn Crescent and Third Avenue

Show more

Start date: 21 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries of large building components

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 13 of 19

Streets affected: Billinghurst Crescent (half road closure with traffic control – expect delays) between Williamson Road and Turnbull Drive

Show more

Start date: 21 September 2020

End date: 9 October 2020

Duration 1: 6:30am – 6:30pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Works to widen parking lanes to accommodate school bus parking and reconstruction of footpath on both sides with pedestrian ramps

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 13 of 13

Streets affected: Turpin Road (half road closure with detour - traffic control on site) between Gordon Street and Imperial Parade

Show more

Start date: 21 September 2020

End date: 3 October 2020

Duration: 9am – 3pm

Reason: To facilitate tree trimming works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 12 of 17

Streets affected: Main Beach Parade (half road closure with detour - traffic control on site) between Macarthur Parade and Cunningham Avenue

Show more

Start date: 22 September 2020

End date: 8 October 2020

Duration: 12:15am – 4:30am

Reason: Inspect and perform repairs to 'sewer' access hole

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 12 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 10 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 9 of 15

Streets affected: Brisbane Road (full road closure local traffic access only) between Government Road and Harley Street

Show more

Start date: 25 September 2020

End date: 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the installation of water connection

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 8 of 8

Streets affected: Alexandra Avenue (half road closure with detour - traffic control on site) between Mary Avenue and Old Burleigh Road

Show more

Preferred date: 26 September 2020 (only)

Contingency date: 3 October 2020 (only)

Duration: 5am – 6:30pm

Reason: Westbound detour to facilitate large concrete pour

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 6 of 12

Streets affected: Nerang Street (half road closure with traffic control – expect delays) between Ferry Street and Short Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 6 of 12

Streets affected: Short Street (half road closure with traffic control – expect delays) between Price Street and Nerang Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 6 of 12

Streets affected: Dutton Street (half road closure with traffic control – expect delays) between Griffith Street and Marine Parade

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 6 of 12

Streets affected: Gemvale Road (half road closure with traffic control – expect delays) between Stapley Drive and Eden View Drive

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 6 of 12

Streets affected: Mitchell Avenue (half road closure with traffic control – expect delays) between Duringan Street and W View Road

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 3pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 4 of 8

Streets affected: Chalk Street (full road closure local traffic access only) between McLean Street and Warner Street

Show more

Start date: 30 September 2020

End date: 7 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 3 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 3 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 3 of 7

Streets affected: Gold Coast Highway (Reduced lanes) between Rosewood Avenue and Britannia Avenue

Show more

Start date: 1 October 2020

End date: 7 October 2020

Duration: 6:30am – 2pm

Reason: To facilitate the removal of scaffolding

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 3 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 3 of 9

Streets affected: Campbell Street (half road closure with traffic control – expect delays) between Saywell Street and Rowes Court

Show more

Start date: 1 October 2020

End date: 9 October 2020

Duration: 9am – 11pm

Reason: Cleaning and relining of stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 2 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 1 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

 
4 Oct - Sunday
Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 413 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 98 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 72 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 70 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 70 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 63 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 60 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 58 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 56 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 51 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 49 of 50

Streets affected: Morseby Avenue (full road closure local traffic access only) between Cuba Avenue and Timor Avenue

Show more

Date 1: 17 August 2020 to 26 August 2020

Date 2: 15 September 2020 to 18 September 2020

Date 3:  1 October 2020 to 5 October 2020

Duration: 6:30am – 5:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 46 of 51

Streets affected: Manila Avenue (full road closure local traffic access only) between Laguna Avenue and End of road

Show more

Date 1: 20 August 2020 to 2 September 2020

Date 2: 17 September 2020 to 21 September 2020

Date 3:  5 October 2020 to 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 45 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 45 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 45 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 35 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 35 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Ashmore

Day 33 of 38

Streets affected: Cotlew Street (Reduced lanes) between Currumburra Road and Wardoo Street

Show more

Start date: 2 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate concreting shared path, pram ramps, driveway construction works including bus stop installation

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 32 of 35

Streets affected: Ferny Avenue (Reduced lanes) between Elkhorn Avenue and Staghorn Avenue

Show more

Also affected: Cypress Avenue

Start date: 2 September 2020

End date: 7 October 2020

Duration: 8pm – 5am

Reason: To facilitate the installation of new conduits and signal footings

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 30 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 28 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 27 of 27

Streets affected: Clagiraba Road (half road closure with traffic control – expect delays) between Nerang Murwillumbah Road and Bellis Road, also between Beaudesert Nerang Road and Thendara Drive

Show more

Also affected: Cladiara Road, Arunta Drive, Gerara Court, Glen Circuit and Witheren Road

Start date: 8 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: Profile patch road failures and asphalt

north

Road closures

Planned - Temporary Road Closure - Robina

Day 26 of 29

Streets affected: Cheltenham Drive (Reduced lanes) between Woody Views Way and Poppy Lane

Show more

Start date: 9 September 2020

End date: 7 October 2020

Duration 1: 9am – 2pm (Monday to Friday)

Duration 2: 6:30am - 12:30pm (Saturday only)

Reason: To facilitate the installation of bike ramps including a cut through on the traffic island

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 21 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 21 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 21 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 20 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 19 of 20

Streets affected: Golden Four Drive (traffic control, half road - expect delays) between Graham Street and Cahill Street

Start date: 16 September 2020

End date: 5 October 2020 
 
Duration: 7.00am - 5.00pm

Reason: Closure to facilitate asphalt resurfacing

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 16 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 16 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 16 of 16

Streets affected: Napper Road (Reduced lanes) between Captain Cook Drive and Arundel Drive

Show more

Start date: 19 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new signal lanterns and bonus LT

north

Road closures

Planned - Temporary Road Closure - Ashmore

Day 15 of 15

Streets affected: Koolewong Parade (half road closure with traffic control – expect delays) between Tumbarumba Avenue and Kanni Court

Show more

Start date: 19 September 2020

End date: 4 October 2020

Duration: 7am – Midnight

Reason: To facilitate stormwater pipe works

north

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 14 of 15

Streets affected: Currumbin Creek Road (half road closure with traffic control – expect delays) between Braewood Drive and Bains Road

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road resurfacing

south

Road closures

Planned - Temporary Road Closure - Tallebudgera

Day 14 of 15

Streets affected: Syndicate Road (half road closure with traffic control – expect delays) between Tallebudgera Creek Road and Des Quinlan Crescent

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, repairs, patches and sealing

south

Road closures

Planned - Temporary Road Closure - Labrador

Day 14 of 14

Streets affected: Turpin Road (half road closure with traffic control – expect delays) between Chirn Crescent and Third Avenue

Show more

Start date: 21 September 2020

End date: 4 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries of large building components

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 14 of 19

Streets affected: Billinghurst Crescent (half road closure with traffic control – expect delays) between Williamson Road and Turnbull Drive

Show more

Start date: 21 September 2020

End date: 9 October 2020

Duration 1: 6:30am – 6:30pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Works to widen parking lanes to accommodate school bus parking and reconstruction of footpath on both sides with pedestrian ramps

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 13 of 17

Streets affected: Main Beach Parade (half road closure with detour - traffic control on site) between Macarthur Parade and Cunningham Avenue

Show more

Start date: 22 September 2020

End date: 8 October 2020

Duration: 12:15am – 4:30am

Reason: Inspect and perform repairs to 'sewer' access hole

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 13 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 11 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 10 of 15

Streets affected: Brisbane Road (full road closure local traffic access only) between Government Road and Harley Street

Show more

Start date: 25 September 2020

End date: 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the installation of water connection

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 7 of 12

Streets affected: Nerang Street (half road closure with traffic control – expect delays) between Ferry Street and Short Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 7 of 12

Streets affected: Short Street (half road closure with traffic control – expect delays) between Price Street and Nerang Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 7 of 12

Streets affected: Dutton Street (half road closure with traffic control – expect delays) between Griffith Street and Marine Parade

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 7 of 12

Streets affected: Gemvale Road (half road closure with traffic control – expect delays) between Stapley Drive and Eden View Drive

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 7 of 12

Streets affected: Mitchell Avenue (half road closure with traffic control – expect delays) between Duringan Street and W View Road

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 3pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 5 of 8

Streets affected: Chalk Street (full road closure local traffic access only) between McLean Street and Warner Street

Show more

Start date: 30 September 2020

End date: 7 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 4 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 4 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 4 of 7

Streets affected: Gold Coast Highway (Reduced lanes) between Rosewood Avenue and Britannia Avenue

Show more

Start date: 1 October 2020

End date: 7 October 2020

Duration: 6:30am – 2pm

Reason: To facilitate the removal of scaffolding

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 4 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 4 of 9

Streets affected: Campbell Street (half road closure with traffic control – expect delays) between Saywell Street and Rowes Court

Show more

Start date: 1 October 2020

End date: 9 October 2020

Duration: 9am – 11pm

Reason: Cleaning and relining of stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 3 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 2 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

8.00am - 10.00pm

Streets affected: Gold Coast Highway - slip road (full road closure local traffic access only) between Wave Street and Chairlift Avenue

Show more

Start date: 4 October 2020

End date: 4 October 2020

Duration: 8am – 10pm

Reason: To facilitate temporary infrastructure and safe movement for event - Nobby's Street Fiesta 2020

south

 
5 Oct - Monday
Water and sewerage

Unplanned - Water Interruption - BroadBeach Waters

12.30pm - 3.30pm

Streets affected: Kalimna Drive, Moana Park Avenue

Cause: Water Leak

W/O: 20624593

Notif: 1000707938

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 414 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 99 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 73 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 71 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 71 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 64 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 61 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 59 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 57 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 52 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 50 of 50

Streets affected: Morseby Avenue (full road closure local traffic access only) between Cuba Avenue and Timor Avenue

Show more

Date 1: 17 August 2020 to 26 August 2020

Date 2: 15 September 2020 to 18 September 2020

Date 3:  1 October 2020 to 5 October 2020

Duration: 6:30am – 5:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 47 of 51

Streets affected: Manila Avenue (full road closure local traffic access only) between Laguna Avenue and End of road

Show more

Date 1: 20 August 2020 to 2 September 2020

Date 2: 17 September 2020 to 21 September 2020

Date 3:  5 October 2020 to 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 46 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 46 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 46 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 36 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 36 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Ashmore

Day 34 of 38

Streets affected: Cotlew Street (Reduced lanes) between Currumburra Road and Wardoo Street

Show more

Start date: 2 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate concreting shared path, pram ramps, driveway construction works including bus stop installation

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 33 of 35

Streets affected: Ferny Avenue (Reduced lanes) between Elkhorn Avenue and Staghorn Avenue

Show more

Also affected: Cypress Avenue

Start date: 2 September 2020

End date: 7 October 2020

Duration: 8pm – 5am

Reason: To facilitate the installation of new conduits and signal footings

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 31 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 29 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Robina

Day 27 of 29

Streets affected: Cheltenham Drive (Reduced lanes) between Woody Views Way and Poppy Lane

Show more

Start date: 9 September 2020

End date: 7 October 2020

Duration 1: 9am – 2pm (Monday to Friday)

Duration 2: 6:30am - 12:30pm (Saturday only)

Reason: To facilitate the installation of bike ramps including a cut through on the traffic island

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 22 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 22 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 22 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 21 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 20 of 20

Streets affected: Golden Four Drive (traffic control, half road - expect delays) between Graham Street and Cahill Street

Start date: 16 September 2020

End date: 5 October 2020 
 
Duration: 7.00am - 5.00pm

Reason: Closure to facilitate asphalt resurfacing

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 17 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 17 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 15 of 15

Streets affected: Currumbin Creek Road (half road closure with traffic control – expect delays) between Braewood Drive and Bains Road

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road resurfacing

south

Road closures

Planned - Temporary Road Closure - Tallebudgera

Day 15 of 15

Streets affected: Syndicate Road (half road closure with traffic control – expect delays) between Tallebudgera Creek Road and Des Quinlan Crescent

Show more

Start date: 21 September 2020

End date: 5 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, repairs, patches and sealing

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 15 of 19

Streets affected: Billinghurst Crescent (half road closure with traffic control – expect delays) between Williamson Road and Turnbull Drive

Show more

Start date: 21 September 2020

End date: 9 October 2020

Duration 1: 6:30am – 6:30pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Works to widen parking lanes to accommodate school bus parking and reconstruction of footpath on both sides with pedestrian ramps

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 14 of 17

Streets affected: Main Beach Parade (half road closure with detour - traffic control on site) between Macarthur Parade and Cunningham Avenue

Show more

Start date: 22 September 2020

End date: 8 October 2020

Duration: 12:15am – 4:30am

Reason: Inspect and perform repairs to 'sewer' access hole

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 14 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 12 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 11 of 15

Streets affected: Brisbane Road (full road closure local traffic access only) between Government Road and Harley Street

Show more

Start date: 25 September 2020

End date: 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the installation of water connection

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 8 of 12

Streets affected: Nerang Street (half road closure with traffic control – expect delays) between Ferry Street and Short Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 8 of 12

Streets affected: Short Street (half road closure with traffic control – expect delays) between Price Street and Nerang Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 8 of 12

Streets affected: Dutton Street (half road closure with traffic control – expect delays) between Griffith Street and Marine Parade

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 8 of 12

Streets affected: Gemvale Road (half road closure with traffic control – expect delays) between Stapley Drive and Eden View Drive

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 8 of 12

Streets affected: Mitchell Avenue (half road closure with traffic control – expect delays) between Duringan Street and W View Road

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 3pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 7 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 6 of 8

Streets affected: Chalk Street (full road closure local traffic access only) between McLean Street and Warner Street

Show more

Start date: 30 September 2020

End date: 7 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 5 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 5 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 5 of 7

Streets affected: Gold Coast Highway (Reduced lanes) between Rosewood Avenue and Britannia Avenue

Show more

Start date: 1 October 2020

End date: 7 October 2020

Duration: 6:30am – 2pm

Reason: To facilitate the removal of scaffolding

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 5 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 5 of 9

Streets affected: Campbell Street (half road closure with traffic control – expect delays) between Saywell Street and Rowes Court

Show more

Start date: 1 October 2020

End date: 9 October 2020

Duration: 9am – 11pm

Reason: Cleaning and relining of stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 4 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 3 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 1 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 1 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 1 of 4

Streets affected: Cobai Drive (half road closure with traffic control – expect delays) between Old Coach Road and Rainbow Drive

Show more

Start date: 5 October 2020

End date: 8 October 2020

Duration: 9am – 2:30pm

Reason: Road profiling

north

Water and sewerage

Planned - Water Interruption - Broadbeach

9.00am - 12.00pm

Streets affected: 30 Holland Court Broadbeach

Cause: Water shutdown

W/O: 20624381

Notif: 1000707622

Ispot/Pathway: 77769691

south

Water and sewerage

Planned - Water Interruption - Broadbeach

11.00am - 2.00pm

 

Streets affected: 111 Old Burleigh Road Broadbeach

Cause: Water meter replacement

W/O: 20624367

Notif: 1000707615

Ispot/Pathway: 77769666

south

Water and sewerage

Planned - Water Interruption - Broadbeach

1.00pm - 4.00pm

Streets affected: 12-14 Queensland Avenue Broadbeach 

Cause: Watermain shutdown

W/O: 52012817

Notif: 1000707635

Ispot/Pathway: 77770397

south

 
6 Oct - Tuesday
Water and sewerage

Unplanned - Water Interruption - Currumbin Waters

4.50pm - 10.30pm

Streets affected: Nuban Street

Cause: Repair water main

W/O: 20624619

Notif: 1000707981

 

south

Water and sewerage

Unplanned - Water Interruption - Broadbeach

4.55pm - 11.45pm

Streets affected: Surf Parade

Cause: Repair water main

W/O: 20624654

Notif: 1000708024

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 415 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 100 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 74 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 72 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 72 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 65 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 62 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 60 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 58 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 53 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 48 of 51

Streets affected: Manila Avenue (full road closure local traffic access only) between Laguna Avenue and End of road

Show more

Date 1: 20 August 2020 to 2 September 2020

Date 2: 17 September 2020 to 21 September 2020

Date 3:  5 October 2020 to 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 47 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 47 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 47 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 37 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 37 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Ashmore

Day 35 of 38

Streets affected: Cotlew Street (Reduced lanes) between Currumburra Road and Wardoo Street

Show more

Start date: 2 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate concreting shared path, pram ramps, driveway construction works including bus stop installation

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 34 of 35

Streets affected: Ferny Avenue (Reduced lanes) between Elkhorn Avenue and Staghorn Avenue

Show more

Also affected: Cypress Avenue

Start date: 2 September 2020

End date: 7 October 2020

Duration: 8pm – 5am

Reason: To facilitate the installation of new conduits and signal footings

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 32 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 30 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Robina

Day 28 of 29

Streets affected: Cheltenham Drive (Reduced lanes) between Woody Views Way and Poppy Lane

Show more

Start date: 9 September 2020

End date: 7 October 2020

Duration 1: 9am – 2pm (Monday to Friday)

Duration 2: 6:30am - 12:30pm (Saturday only)

Reason: To facilitate the installation of bike ramps including a cut through on the traffic island

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 23 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 23 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 23 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 22 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 18 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 18 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 16 of 19

Streets affected: Billinghurst Crescent (half road closure with traffic control – expect delays) between Williamson Road and Turnbull Drive

Show more

Start date: 21 September 2020

End date: 9 October 2020

Duration 1: 6:30am – 6:30pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Works to widen parking lanes to accommodate school bus parking and reconstruction of footpath on both sides with pedestrian ramps

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 15 of 17

Streets affected: Main Beach Parade (half road closure with detour - traffic control on site) between Macarthur Parade and Cunningham Avenue

Show more

Start date: 22 September 2020

End date: 8 October 2020

Duration: 12:15am – 4:30am

Reason: Inspect and perform repairs to 'sewer' access hole

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 15 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 13 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 12 of 15

Streets affected: Brisbane Road (full road closure local traffic access only) between Government Road and Harley Street

Show more

Start date: 25 September 2020

End date: 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the installation of water connection

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 9 of 12

Streets affected: Nerang Street (half road closure with traffic control – expect delays) between Ferry Street and Short Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 9 of 12

Streets affected: Short Street (half road closure with traffic control – expect delays) between Price Street and Nerang Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 9 of 12

Streets affected: Dutton Street (half road closure with traffic control – expect delays) between Griffith Street and Marine Parade

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 9 of 12

Streets affected: Gemvale Road (half road closure with traffic control – expect delays) between Stapley Drive and Eden View Drive

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 9 of 12

Streets affected: Mitchell Avenue (half road closure with traffic control – expect delays) between Duringan Street and W View Road

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 3pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 8 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 7 of 8

Streets affected: Chalk Street (full road closure local traffic access only) between McLean Street and Warner Street

Show more

Start date: 30 September 2020

End date: 7 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 6 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 6 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 6 of 7

Streets affected: Gold Coast Highway (Reduced lanes) between Rosewood Avenue and Britannia Avenue

Show more

Start date: 1 October 2020

End date: 7 October 2020

Duration: 6:30am – 2pm

Reason: To facilitate the removal of scaffolding

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 6 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 6 of 9

Streets affected: Campbell Street (half road closure with traffic control – expect delays) between Saywell Street and Rowes Court

Show more

Start date: 1 October 2020

End date: 9 October 2020

Duration: 9am – 11pm

Reason: Cleaning and relining of stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 5 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 4 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 2 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 2 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 2 of 4

Streets affected: Cobai Drive (half road closure with traffic control – expect delays) between Old Coach Road and Rainbow Drive

Show more

Start date: 5 October 2020

End date: 8 October 2020

Duration: 9am – 2:30pm

Reason: Road profiling

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 1 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Coomera, Coomera Waters

4.00am - 6.00am

Areas affected: Coomera, Coomera Waters

 

Mosquito/biting midge spraying will be undertaken in these areas on Tuesday 6th October 2020 from 4am to 6am for control of mosquitos and biting midges (weather permitting).

 

all regions

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Coomera, Coomera Waters

4.00am - 6.00am

Areas affected: Coomera, Coomera Waters

 

Mosquito/biting midge spraying will be undertaken in these areas on Tuesday 6th October 2020 from 4am to 6am for control of mosquitos and biting midges (weather permitting).

 

all regions

Water and sewerage

Planned - Water Interruption - Surfers Paradise

5.00am - 8.00am

Streets affected: 135 Bundall Rd Surfers Paradise

Cause:  Water Shutdown for meter replacement

W/O: 52012819

Notif: 1000707697

Ispot/Pathway: 77769971

 

 

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 1 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 1 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 8

Streets affected: Garfield Terrace (half road closure with traffic control – expect delays) between Thornton Street and Aubrey Street

Show more

Start date: 6 October 2020

End date: 13 October 2020

Duration: 7am – 5pm

Reason: To facilitate conduit repairs for the NBN

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 1 of 3

Streets affected: Hooker Boulevard (footpath closure) between Sunshine Boulevard and Gold Coast Highway

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 7am – 5pm

Reason: To facilitate the installation of a new gas line

south

Water and sewerage

Planned - Water Interruption - Burleigh Waters

9.00am - 2.00pm

Streets affected: Dunlin Drive Razorbill Street Wagtail Court Auk Avenue

Cause: Water Shutdown

W/O: 60008181

Notif: 1000702704

south

Road closures

Planned - Temporary Road Closure - Robina

Day 1 of 3

Streets affected: Riverwalk Avenue (full road closure local traffic access only) between Arbour Lane and End of road

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 9am – 4pm

Reason: To facilitate safe environment during hoisting of materials

south

Water and sewerage

Planned - Water Interruption - Palm Beach

9.00am - 2.00pm

Streets affected: Fifteenth Ave and Sixteenth Ave Palm Beach

Cause:  Water Shutdown for valve replacement

W/O: 60006909

Notif: 1000594638

Ispot/Pathway: 77697735

 

 

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 1 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Water and sewerage

Planned - Water Interruption - Surfers Paradise

9.00am - 12.00pm

Streets affected: 3049 Surfers Paradise Boulevard

Cause: Watermain Shutdown

W/O: 52012818

Notif: 1000707665

Ispot/Pathway: 77769642

 

south

Water and sewerage

Planned - Water Interruption - Ashmore

2.00pm - 5.00pm

Streets affected: Gooding Drive Clear Island Waters

Cause: Watermain Shutdown

W/O: 52012816

Notif: 1000707651

Ispot/Pathway: 77769733

 

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 3

Streets affected: Gold Coast Highway (Reduced lanes) between Cannes Avenue and Fern Street

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 8pm – 3am

Reason: Replacing the surround and lid of a sewer manhole that is noisy

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 1 of 3

Streets affected: Connor Street (half road closure with traffic control – expect delays) between Gold Coast Highway and James Street

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 9pm – 5am

Reason: Water service upgrade

south

 
7 Oct - Wednesday
Water and sewerage

Unplanned - Water Interruption - Palm Beach

6.10am - 9.10am

Streets affected: Parnki Parade, Tallebudgera Drive, Murlong Crescent

Cause: Repair broken main

W/O 20624927

Notif 1000708321 

south

Water and sewerage

Unplanned - Water Interruption - Tallai

8.30am - 1.10pm

Streets affected: Mooralla Street, Norong Court, Rutherglen Court, Talgarno Court

Cause: Water Leak

W/O: 20624928

Notif: 1000708323

south

Water and sewerage

Unplanned - Water Interruption - Upper Coomera

10.15am - 10.45am

Streets affected: Gunther Avenue

Cause: Repair recycled water main

W/0 20624976

Notif 1000708362

north

Water and sewerage

Unplanned - Water Interruption - Southport

10.20am - 11.20am

Streets affected: Marine Parade

Cause: Replace water service

W/O 20623912

Notif 1000707043

north

Water and sewerage

Unplanned - Water Interruption - Biggera Waters

10.45am - 11.45am

Streets affected: Budweiser Street

Cause: Repair hydrant

W/O 20624742

Notif 1000708128

north

Water and sewerage

Unplanned - Water Interruption - Southport

2.00pm - 3.00pm

Streets affected: Caroline Avenue

Cause: Repair water service

W/O: 20621606

Notif: 1000704334

north

Water and sewerage

Unplanned - Water Interruption - Robina

4.00pm - 11.30pm

Streets affected: University Drive, Bond University Ring Road

Cause: Repair water main

W/O: 20624822

Notif: 1000708225

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 416 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 101 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 75 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 73 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 73 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 66 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 63 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 61 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 59 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 54 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 49 of 51

Streets affected: Manila Avenue (full road closure local traffic access only) between Laguna Avenue and End of road

Show more

Date 1: 20 August 2020 to 2 September 2020

Date 2: 17 September 2020 to 21 September 2020

Date 3:  5 October 2020 to 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 48 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 48 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 48 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 38 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 38 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Ashmore

Day 36 of 38

Streets affected: Cotlew Street (Reduced lanes) between Currumburra Road and Wardoo Street

Show more

Start date: 2 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate concreting shared path, pram ramps, driveway construction works including bus stop installation

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 35 of 35

Streets affected: Ferny Avenue (Reduced lanes) between Elkhorn Avenue and Staghorn Avenue

Show more

Also affected: Cypress Avenue

Start date: 2 September 2020

End date: 7 October 2020

Duration: 8pm – 5am

Reason: To facilitate the installation of new conduits and signal footings

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 33 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 31 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Robina

Day 29 of 29

Streets affected: Cheltenham Drive (Reduced lanes) between Woody Views Way and Poppy Lane

Show more

Start date: 9 September 2020

End date: 7 October 2020

Duration 1: 9am – 2pm (Monday to Friday)

Duration 2: 6:30am - 12:30pm (Saturday only)

Reason: To facilitate the installation of bike ramps including a cut through on the traffic island

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 24 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 24 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 24 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 23 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 19 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 19 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 17 of 19

Streets affected: Billinghurst Crescent (half road closure with traffic control – expect delays) between Williamson Road and Turnbull Drive

Show more

Start date: 21 September 2020

End date: 9 October 2020

Duration 1: 6:30am – 6:30pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Works to widen parking lanes to accommodate school bus parking and reconstruction of footpath on both sides with pedestrian ramps

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 16 of 17

Streets affected: Main Beach Parade (half road closure with detour - traffic control on site) between Macarthur Parade and Cunningham Avenue

Show more

Start date: 22 September 2020

End date: 8 October 2020

Duration: 12:15am – 4:30am

Reason: Inspect and perform repairs to 'sewer' access hole

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 16 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 14 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 13 of 15

Streets affected: Brisbane Road (full road closure local traffic access only) between Government Road and Harley Street

Show more

Start date: 25 September 2020

End date: 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the installation of water connection

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 10 of 12

Streets affected: Nerang Street (half road closure with traffic control – expect delays) between Ferry Street and Short Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 10 of 12

Streets affected: Short Street (half road closure with traffic control – expect delays) between Price Street and Nerang Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 10 of 12

Streets affected: Dutton Street (half road closure with traffic control – expect delays) between Griffith Street and Marine Parade

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 10 of 12

Streets affected: Gemvale Road (half road closure with traffic control – expect delays) between Stapley Drive and Eden View Drive

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 10 of 12

Streets affected: Mitchell Avenue (half road closure with traffic control – expect delays) between Duringan Street and W View Road

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 3pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 9 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 8 of 8

Streets affected: Chalk Street (full road closure local traffic access only) between McLean Street and Warner Street

Show more

Start date: 30 September 2020

End date: 7 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 7 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 7 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 7 of 7

Streets affected: Gold Coast Highway (Reduced lanes) between Rosewood Avenue and Britannia Avenue

Show more

Start date: 1 October 2020

End date: 7 October 2020

Duration: 6:30am – 2pm

Reason: To facilitate the removal of scaffolding

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 7 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 7 of 9

Streets affected: Campbell Street (half road closure with traffic control – expect delays) between Saywell Street and Rowes Court

Show more

Start date: 1 October 2020

End date: 9 October 2020

Duration: 9am – 11pm

Reason: Cleaning and relining of stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 6 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 5 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 3 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 3 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 3 of 4

Streets affected: Cobai Drive (half road closure with traffic control – expect delays) between Old Coach Road and Rainbow Drive

Show more

Start date: 5 October 2020

End date: 8 October 2020

Duration: 9am – 2:30pm

Reason: Road profiling

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 2 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 2 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 2 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 8

Streets affected: Garfield Terrace (half road closure with traffic control – expect delays) between Thornton Street and Aubrey Street

Show more

Start date: 6 October 2020

End date: 13 October 2020

Duration: 7am – 5pm

Reason: To facilitate conduit repairs for the NBN

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 2 of 3

Streets affected: Hooker Boulevard (footpath closure) between Sunshine Boulevard and Gold Coast Highway

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 7am – 5pm

Reason: To facilitate the installation of a new gas line

south

Road closures

Planned - Temporary Road Closure - Robina

Day 2 of 3

Streets affected: Riverwalk Avenue (full road closure local traffic access only) between Arbour Lane and End of road

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 9am – 4pm

Reason: To facilitate safe environment during hoisting of materials

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 2 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 3

Streets affected: Gold Coast Highway (Reduced lanes) between Cannes Avenue and Fern Street

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 8pm – 3am

Reason: Replacing the surround and lid of a sewer manhole that is noisy

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 2 of 3

Streets affected: Connor Street (half road closure with traffic control – expect delays) between Gold Coast Highway and James Street

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 9pm – 5am

Reason: Water service upgrade

south

Water and sewerage

Planned - Water Interruption - Southport

2.00am - 5.00am

Streets affected: Marine Parade and North Street Southport

Cause:  Water Shutdown to repair hydrant

W/O:  20620703

Notif: 1000707082

Ispot/Pathway: N/A

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 1 of 9

Streets affected: Second Avenue (full road closure local traffic access only) between Gold Coast Highway and Surf Parade

Show more

Start date: 7 October 2020

End date: 15 October 2020

Duration: 6am – 9pm

Reason: To safely accommodate a large concrete pour for the development

south

Bushfires

Planned - Bushfire hazard reduction burn – Burleigh Ridge Park

Day 1 of 2

Streets/area affected: 51 Tabilban Street Burleigh Heads

Show more

Start <time/date>: 6am, Wednesday 7th October 2020(weather permitting)
End <time/date>:  7pm, Thursday 8th October 2020
Duration:   2 days

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

south

Bushfires

Planned - Bushfire hazard reduction burn – Burleigh Ridge Park

Day 1 of 2

Streets/area affected: 51 Tabilban Street Burleigh Heads

Show more

Start <time/date>: 6am, Wednesday 7th October 2020(weather permitting)
End <time/date>:  7pm, Thursday 8th October 2020
Duration:   2 days

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

south

Road closures

Planned - Temporary Road Closure - Miami

Day 1 of 8

Streets affected: Schuster Avenue (full road closure local traffic access only) between Redondo Avenue and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate garden maintenance

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 1 of 8

Streets affected: Havana Key (half road closure with traffic control – expect delays) between T E Peters Drive and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: Cleaning and relining of stormwater pipe

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 1 of 21

Streets affected: Boomerang Crescent (half road closure with traffic control – expect delays) between Bundall Road and Wombat Court

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 1 of 21

Streets affected: Monaco Street (half road closure with traffic control – expect delays) between bridge (West of) and bridge (East of) Pacific Boulevard

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 1 of 21

Streets affected: Ron Penhaligon Way (half road closure with traffic control – expect delays) between Cottesloe Drive and Manly Drive

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Boreholing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 21

Streets affected: Tarcoola Crescent (Reduced lanes) between Stanhill Drive (North) and Stanhill Drive (South)

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement depths

south

Water and sewerage

Planned - Water Interruption - Burleigh Waters

9.00am - 2.00pm

Streets affected: Banksia Broadway Maitland Street Barwon Street Egret Avenue

Cause: Water shutdown

W/O: 60008181

Notif: 1000702706

south

Water and sewerage

Planned - Water Interruption - Burleigh Waters

9.00am - 2.00pm

Streets affected: Banksia Broadway Maitland Street Barwon Street Egret Avenue

Cause: Water shutdown

W/O: 60008181

Notif: 1000702706

south

Water and sewerage

Planned - Water Interruption - Broadbeach Waters

9.00am - 2.00pm

Streets affected: Rosemount Ave Broadbeach Waters

Cause:  Water Shutdown to connect new water main

W/O: 60007460

Notif: 1000632723

Ispot/Pathway: 77761581

 

south

Water and sewerage

Planned - Water Interruption - Broadbeach Waters

9.00am - 2.00pm

Streets affected: Rosemount Ave Broadbeach Waters

Cause:  Water Shutdown to connect new water main

W/O: 60007460

Notif: 1000632723

Ispot/Pathway: 77761581

 

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 1 of 3

Streets affected: Albert Avenue (full road closure local traffic access only) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 October 2020

End date: 9 October 2020

Duration: 9am – 4pm

Reason: Overhead crane lift activities

south

Water and sewerage

Planned - Water Interruption - Surfers Paradise

9.00am - 12.00pm

 

Streets affected: 7 Burra Street Surfers Paradise

Cause: Watermain Shutdown

W/O: 52012820

Notif: 1000707709

Ispot/Pathway: 77770023

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 1 of 21

Streets affected: Rio Vista Boulevard (half road closure with traffic control – expect delays) between Meredith Drive and Monaco Street

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 9am – 3pm

Reason: Boreholing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 1 of 10

Streets affected: Cheltenham Drive and Killarney Avenue intersection (Reduced lanes) between Tullamarine Drive and Glenferrie Drive

Show more

Start date: 7 October 2020

End date: 16 October 2020

Duration: 9am – 2pm

Reason: Damaged traffic signals requiring repair after burst water main

south

Water and sewerage

Planned - Water Interruption - Surfers Paradise

11.00am - 2.00pm

Streets affected: 96-98 Stanhill Drive Surfers Paradise

Cause: Watermain Shutdown

W/O: 20624542

Notif: 1000707864

Ispot/Pathway: 77770194

north

Water and sewerage

Planned - Water Interruption - Main Beach

1.00pm - 4.00pm

Streets affected: 6 Breaker Street Main Beach

Cause: Watermain Shutdown

W/O: 20624552

Notif: 1000707876

Ispot/Pathway: 77769761

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 2

Streets affected: Via Roma (full road closure local traffic access only) between Remembrance Drive and Amalfi Drive

Show more

Start date: 7 October 2020

End date: 8 October 2020

Duration: 7:30pm – 5:30am

Reason: Assemble a 250 Tonne mobile crane on roadway

north

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 2

Streets affected: Nerang Street (full road closure local traffic access only) between Queen Street and High Street

Show more

Also affected: Little High Street

Start date: 7 October 2020

End date: 8 October 2020

Duration: 10:30pm – 2:30am

Reason: To facilitate installation of steel supports for existing gantry

north

 
8 Oct - Thursday
Water and sewerage

Unplanned - Water Interruption - Coolangatta

4.45am - 6.46am

Streets affected: Scott Street

Cause: Repair water main

W/O: 20617332

south

Water and sewerage

Unplanned - Water Interruption - Biggera Waters

9.00am - 10.00am

Streets affected: Budweiser Street

Cause: Repair hydrant

W/O 20624742

Notif 1000708128

north

Water and sewerage

Unplanned - Water Interruption - Highland Park

10.15am - 11.15am

Streets affected: Leesa Court, Quigan Terrace, Convery Crescent

Cause: Repair service

W/O 20624623

Notif 1000707977

south

Water and sewerage

Unplanned - Water Interruption - Southport

10.15am - 11.15am

Streets affected: Warana Avenue, Mango Place

Cause: Repair water service

W/O 20624299

Notif 1000707497

north

Water and sewerage

Unplanned - Water Interruption - Willow Vale

2.15pm - 3.15pm

Streets affected: Denham Circuit

Cause: Repair water main

W/O. 20625047

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 417 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 102 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 76 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 74 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 74 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 67 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 64 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 62 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 60 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 55 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 50 of 51

Streets affected: Manila Avenue (full road closure local traffic access only) between Laguna Avenue and End of road

Show more

Date 1: 20 August 2020 to 2 September 2020

Date 2: 17 September 2020 to 21 September 2020

Date 3:  5 October 2020 to 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 49 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 49 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 49 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 39 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 39 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Ashmore

Day 37 of 38

Streets affected: Cotlew Street (Reduced lanes) between Currumburra Road and Wardoo Street

Show more

Start date: 2 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate concreting shared path, pram ramps, driveway construction works including bus stop installation

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 34 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 32 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Hollywell

Day 25 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 25 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 25 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 24 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 20 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 20 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 18 of 19

Streets affected: Billinghurst Crescent (half road closure with traffic control – expect delays) between Williamson Road and Turnbull Drive

Show more

Start date: 21 September 2020

End date: 9 October 2020

Duration 1: 6:30am – 6:30pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Works to widen parking lanes to accommodate school bus parking and reconstruction of footpath on both sides with pedestrian ramps

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 17 of 17

Streets affected: Main Beach Parade (half road closure with detour - traffic control on site) between Macarthur Parade and Cunningham Avenue

Show more

Start date: 22 September 2020

End date: 8 October 2020

Duration: 12:15am – 4:30am

Reason: Inspect and perform repairs to 'sewer' access hole

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 17 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 15 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 14 of 15

Streets affected: Brisbane Road (full road closure local traffic access only) between Government Road and Harley Street

Show more

Start date: 25 September 2020

End date: 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the installation of water connection

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 11 of 12

Streets affected: Nerang Street (half road closure with traffic control – expect delays) between Ferry Street and Short Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 11 of 12

Streets affected: Short Street (half road closure with traffic control – expect delays) between Price Street and Nerang Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 11 of 12

Streets affected: Dutton Street (half road closure with traffic control – expect delays) between Griffith Street and Marine Parade

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 11 of 12

Streets affected: Gemvale Road (half road closure with traffic control – expect delays) between Stapley Drive and Eden View Drive

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 11 of 12

Streets affected: Mitchell Avenue (half road closure with traffic control – expect delays) between Duringan Street and W View Road

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 3pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 10 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 8 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 8 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 8 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 8 of 9

Streets affected: Campbell Street (half road closure with traffic control – expect delays) between Saywell Street and Rowes Court

Show more

Start date: 1 October 2020

End date: 9 October 2020

Duration: 9am – 11pm

Reason: Cleaning and relining of stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 7 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 6 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 4 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 4 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 4 of 4

Streets affected: Cobai Drive (half road closure with traffic control – expect delays) between Old Coach Road and Rainbow Drive

Show more

Start date: 5 October 2020

End date: 8 October 2020

Duration: 9am – 2:30pm

Reason: Road profiling

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 3 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 3 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 3 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 8

Streets affected: Garfield Terrace (half road closure with traffic control – expect delays) between Thornton Street and Aubrey Street

Show more

Start date: 6 October 2020

End date: 13 October 2020

Duration: 7am – 5pm

Reason: To facilitate conduit repairs for the NBN

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 3 of 3

Streets affected: Hooker Boulevard (footpath closure) between Sunshine Boulevard and Gold Coast Highway

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 7am – 5pm

Reason: To facilitate the installation of a new gas line

south

Road closures

Planned - Temporary Road Closure - Robina

Day 3 of 3

Streets affected: Riverwalk Avenue (full road closure local traffic access only) between Arbour Lane and End of road

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 9am – 4pm

Reason: To facilitate safe environment during hoisting of materials

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 3 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 3

Streets affected: Gold Coast Highway (Reduced lanes) between Cannes Avenue and Fern Street

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 8pm – 3am

Reason: Replacing the surround and lid of a sewer manhole that is noisy

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 3 of 3

Streets affected: Connor Street (half road closure with traffic control – expect delays) between Gold Coast Highway and James Street

Show more

Start date: 6 October 2020

End date: 8 October 2020

Duration: 9pm – 5am

Reason: Water service upgrade

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 2 of 9

Streets affected: Second Avenue (full road closure local traffic access only) between Gold Coast Highway and Surf Parade

Show more

Start date: 7 October 2020

End date: 15 October 2020

Duration: 6am – 9pm

Reason: To safely accommodate a large concrete pour for the development

south

Bushfires

Planned - Bushfire hazard reduction burn – Burleigh Ridge Park

Day 2 of 2

Streets/area affected: 51 Tabilban Street Burleigh Heads

Show more

Start <time/date>: 6am, Wednesday 7th October 2020(weather permitting)
End <time/date>:  7pm, Thursday 8th October 2020
Duration:   2 days

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

south

Bushfires

Planned - Bushfire hazard reduction burn – Burleigh Ridge Park

Day 2 of 2

Streets/area affected: 51 Tabilban Street Burleigh Heads

Show more

Start <time/date>: 6am, Wednesday 7th October 2020(weather permitting)
End <time/date>:  7pm, Thursday 8th October 2020
Duration:   2 days

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

south

Road closures

Planned - Temporary Road Closure - Miami

Day 2 of 8

Streets affected: Schuster Avenue (full road closure local traffic access only) between Redondo Avenue and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate garden maintenance

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 2 of 8

Streets affected: Havana Key (half road closure with traffic control – expect delays) between T E Peters Drive and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: Cleaning and relining of stormwater pipe

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 2 of 21

Streets affected: Boomerang Crescent (half road closure with traffic control – expect delays) between Bundall Road and Wombat Court

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 2 of 21

Streets affected: Monaco Street (half road closure with traffic control – expect delays) between bridge (West of) and bridge (East of) Pacific Boulevard

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 2 of 21

Streets affected: Ron Penhaligon Way (half road closure with traffic control – expect delays) between Cottesloe Drive and Manly Drive

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Boreholing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 21

Streets affected: Tarcoola Crescent (Reduced lanes) between Stanhill Drive (North) and Stanhill Drive (South)

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 2 of 3

Streets affected: Albert Avenue (full road closure local traffic access only) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 October 2020

End date: 9 October 2020

Duration: 9am – 4pm

Reason: Overhead crane lift activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 2 of 21

Streets affected: Rio Vista Boulevard (half road closure with traffic control – expect delays) between Meredith Drive and Monaco Street

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 9am – 3pm

Reason: Boreholing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 2 of 10

Streets affected: Cheltenham Drive and Killarney Avenue intersection (Reduced lanes) between Tullamarine Drive and Glenferrie Drive

Show more

Start date: 7 October 2020

End date: 16 October 2020

Duration: 9am – 2pm

Reason: Damaged traffic signals requiring repair after burst water main

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 2

Streets affected: Via Roma (full road closure local traffic access only) between Remembrance Drive and Amalfi Drive

Show more

Start date: 7 October 2020

End date: 8 October 2020

Duration: 7:30pm – 5:30am

Reason: Assemble a 250 Tonne mobile crane on roadway

north

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 2

Streets affected: Nerang Street (full road closure local traffic access only) between Queen Street and High Street

Show more

Also affected: Little High Street

Start date: 7 October 2020

End date: 8 October 2020

Duration: 10:30pm – 2:30am

Reason: To facilitate installation of steel supports for existing gantry

north

Water and sewerage

Planned - Water Interruption - Burleigh Waters

9.00am - 2.00pm

Streets affected: Manakin Avenue Coronet Crescent

Cause: Watermain shutdown

W/O: 60008181

Notif: 1000702707

south

Water and sewerage

Planned - Water Interruption - Southport

9.00am - 12.00pm

Streets affected: 27 Chester Terrace

Cause: Water shutdown

W/O: 52012823

Notif: 1000707880

Ispot/Pathway: 77770138

north

Water and sewerage

Planned - Water Interruption - Bilinga

12.00pm - 3.00pm

Streets affected: 234 Pacific Parade

Cause: Watermain Shutdown

W/O: 52012824

Notif: 1000708068

Ispot/Pathway: 77770002

south

Road closures

Planned - Temporary Road Closure - Molendinar

Day 1 of 22

Streets affected: Trade Court (full road closure local traffic access only) between Activity Crescent and End of road

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalt work

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 1 of 22

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between 30 Old Coach Road and 160 Seal Change (College Entry)

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate profiling and resealing the road

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 1 of 2

Streets affected: Markeri Street (Reduced lanes) between Sunshine Boulevard and Avanti Street

Show more

Start date: 8 October 2020

End date: 9 October 2020

Duration: 7pm – 3am

Reason: Cleaning and relining of stormwater pipe

south

 
9 Oct - Friday
Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 418 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 103 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 77 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 75 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 75 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 68 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 65 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 63 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 61 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 56 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 51 of 51

Streets affected: Manila Avenue (full road closure local traffic access only) between Laguna Avenue and End of road

Show more

Date 1: 20 August 2020 to 2 September 2020

Date 2: 17 September 2020 to 21 September 2020

Date 3:  5 October 2020 to 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing for M1 upgrade project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 50 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 50 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 50 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 40 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 40 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Ashmore

Day 38 of 38

Streets affected: Cotlew Street (Reduced lanes) between Currumburra Road and Wardoo Street

Show more

Start date: 2 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate concreting shared path, pram ramps, driveway construction works including bus stop installation

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 35 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 33 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Hollywell

Day 26 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 26 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 26 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 25 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 21 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 21 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 19 of 19

Streets affected: Billinghurst Crescent (half road closure with traffic control – expect delays) between Williamson Road and Turnbull Drive

Show more

Start date: 21 September 2020

End date: 9 October 2020

Duration 1: 6:30am – 6:30pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Works to widen parking lanes to accommodate school bus parking and reconstruction of footpath on both sides with pedestrian ramps

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 18 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 16 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 15 of 15

Streets affected: Brisbane Road (full road closure local traffic access only) between Government Road and Harley Street

Show more

Start date: 25 September 2020

End date: 9 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the installation of water connection

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 12 of 12

Streets affected: Nerang Street (half road closure with traffic control – expect delays) between Ferry Street and Short Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 12 of 12

Streets affected: Short Street (half road closure with traffic control – expect delays) between Price Street and Nerang Street

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration 1: 7am – 5pm   (school holidays)

Duration 2: 9am - 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 12 of 12

Streets affected: Dutton Street (half road closure with traffic control – expect delays) between Griffith Street and Marine Parade

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 12 of 12

Streets affected: Gemvale Road (half road closure with traffic control – expect delays) between Stapley Drive and Eden View Drive

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 2:30pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Currumbin

Day 12 of 12

Streets affected: Mitchell Avenue (half road closure with traffic control – expect delays) between Duringan Street and W View Road

Show more

Start date: 28 September 2020

End date: 9 October 2020

Duration: 9am – 3pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 11 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 9 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 9 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 9 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 9 of 9

Streets affected: Campbell Street (half road closure with traffic control – expect delays) between Saywell Street and Rowes Court

Show more

Start date: 1 October 2020

End date: 9 October 2020

Duration: 9am – 11pm

Reason: Cleaning and relining of stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 8 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 7 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 5 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 5 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 4 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 4 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 4 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 8

Streets affected: Garfield Terrace (half road closure with traffic control – expect delays) between Thornton Street and Aubrey Street

Show more

Start date: 6 October 2020

End date: 13 October 2020

Duration: 7am – 5pm

Reason: To facilitate conduit repairs for the NBN

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 4 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 3 of 9

Streets affected: Second Avenue (full road closure local traffic access only) between Gold Coast Highway and Surf Parade

Show more

Start date: 7 October 2020

End date: 15 October 2020

Duration: 6am – 9pm

Reason: To safely accommodate a large concrete pour for the development

south

Road closures

Planned - Temporary Road Closure - Miami

Day 3 of 8

Streets affected: Schuster Avenue (full road closure local traffic access only) between Redondo Avenue and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate garden maintenance

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 3 of 8

Streets affected: Havana Key (half road closure with traffic control – expect delays) between T E Peters Drive and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: Cleaning and relining of stormwater pipe

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 3 of 21

Streets affected: Boomerang Crescent (half road closure with traffic control – expect delays) between Bundall Road and Wombat Court

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 3 of 21

Streets affected: Monaco Street (half road closure with traffic control – expect delays) between bridge (West of) and bridge (East of) Pacific Boulevard

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 3 of 21

Streets affected: Ron Penhaligon Way (half road closure with traffic control – expect delays) between Cottesloe Drive and Manly Drive

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Boreholing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 21

Streets affected: Tarcoola Crescent (Reduced lanes) between Stanhill Drive (North) and Stanhill Drive (South)

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 3 of 3

Streets affected: Albert Avenue (full road closure local traffic access only) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 October 2020

End date: 9 October 2020

Duration: 9am – 4pm

Reason: Overhead crane lift activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 3 of 21

Streets affected: Rio Vista Boulevard (half road closure with traffic control – expect delays) between Meredith Drive and Monaco Street

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 9am – 3pm

Reason: Boreholing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 3 of 10

Streets affected: Cheltenham Drive and Killarney Avenue intersection (Reduced lanes) between Tullamarine Drive and Glenferrie Drive

Show more

Start date: 7 October 2020

End date: 16 October 2020

Duration: 9am – 2pm

Reason: Damaged traffic signals requiring repair after burst water main

south

Road closures

Planned - Temporary Road Closure - Molendinar

Day 2 of 22

Streets affected: Trade Court (full road closure local traffic access only) between Activity Crescent and End of road

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalt work

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 2 of 22

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between 30 Old Coach Road and 160 Seal Change (College Entry)

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate profiling and resealing the road

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 2 of 2

Streets affected: Markeri Street (Reduced lanes) between Sunshine Boulevard and Avanti Street

Show more

Start date: 8 October 2020

End date: 9 October 2020

Duration: 7pm – 3am

Reason: Cleaning and relining of stormwater pipe

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 1 of 13

Streets affected: Petrie Street (half road closure with detour - traffic control on site) between Eden Avenue and Marine Parade

Show more

Start date: 9 October 2020

End date: 21 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate location of services

south

Water and sewerage

Planned - Water Interruption - Burleigh Waters

9.00am - 2.00pm

Streets affected: Nuthatch Street Redwing Court Sparrow Place Honeyeater Drive

Cause: Watermain shutdown

W/O: 60008181

Notif: 1000702708

south

Water and sewerage

Planned - Water Interruption - Currumbin

9.00am - 12.00pm

Streets affected: 74 Currumbin Creek Road Currumbin

Cause: Watermain Sutdown

W/O: 52012822

Notif: 1000707887

Ispot/Pathway: 77769841

south

Water and sewerage

Planned - Water Interruption - Burleigh Waters

9.00am - 2.00pm

Streets affected: Tobago Court

Cause: Watermain Shutdown

W/O: 20613416

Notif: 1000693908

Ispot/Pathway: 77785365

 

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 1 of 22

Streets affected: Yawalpah Road (Reduced lanes) between Attenborough Boulevard and Wallaby Way

Show more

Start date: 9 October 2020

End date: 30 October 2020

Duration: 9am – 2:30pm

Reason: Closures will be in place to allow workers to undertake investigation of conduit run

north

Road closures

Planned - Temporary Road Closure - Carrara

3.00pm - 11.00pm

Streets affected: Alabaster Drive (full road closure local traffic access only) between Nerang Broadbeach Road and Plateau Crescent

Show more

Also affected: Chisholm Road, Lakeview Drive and Plateau Crescent

Start date: 9 October 2020

End date: 9 October 2020

Duration: 3pm – 11pm

Reason: AFL Fixtures - Finals   (Richmond v St Kilda)

north

 
10 Oct - Saturday
Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 419 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 104 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 78 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 76 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 76 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 69 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 66 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 64 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 62 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 57 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 51 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 51 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 51 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 41 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 41 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 36 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 34 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Hollywell

Day 27 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 27 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 27 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 26 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 22 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 22 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 19 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 17 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Southport

Day 12 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 10 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 10 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 10 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 9 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 8 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 6 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 6 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 5 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 5 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 5 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 8

Streets affected: Garfield Terrace (half road closure with traffic control – expect delays) between Thornton Street and Aubrey Street

Show more

Start date: 6 October 2020

End date: 13 October 2020

Duration: 7am – 5pm

Reason: To facilitate conduit repairs for the NBN

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 5 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 4 of 9

Streets affected: Second Avenue (full road closure local traffic access only) between Gold Coast Highway and Surf Parade

Show more

Start date: 7 October 2020

End date: 15 October 2020

Duration: 6am – 9pm

Reason: To safely accommodate a large concrete pour for the development

south

Road closures

Planned - Temporary Road Closure - Miami

Day 4 of 8

Streets affected: Schuster Avenue (full road closure local traffic access only) between Redondo Avenue and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate garden maintenance

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 4 of 8

Streets affected: Havana Key (half road closure with traffic control – expect delays) between T E Peters Drive and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: Cleaning and relining of stormwater pipe

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 4 of 21

Streets affected: Boomerang Crescent (half road closure with traffic control – expect delays) between Bundall Road and Wombat Court

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 4 of 21

Streets affected: Monaco Street (half road closure with traffic control – expect delays) between bridge (West of) and bridge (East of) Pacific Boulevard

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 4 of 21

Streets affected: Ron Penhaligon Way (half road closure with traffic control – expect delays) between Cottesloe Drive and Manly Drive

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Boreholing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 21

Streets affected: Tarcoola Crescent (Reduced lanes) between Stanhill Drive (North) and Stanhill Drive (South)

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 4 of 21

Streets affected: Rio Vista Boulevard (half road closure with traffic control – expect delays) between Meredith Drive and Monaco Street

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 9am – 3pm

Reason: Boreholing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 4 of 10

Streets affected: Cheltenham Drive and Killarney Avenue intersection (Reduced lanes) between Tullamarine Drive and Glenferrie Drive

Show more

Start date: 7 October 2020

End date: 16 October 2020

Duration: 9am – 2pm

Reason: Damaged traffic signals requiring repair after burst water main

south

Road closures

Planned - Temporary Road Closure - Molendinar

Day 3 of 22

Streets affected: Trade Court (full road closure local traffic access only) between Activity Crescent and End of road

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalt work

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 3 of 22

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between 30 Old Coach Road and 160 Seal Change (College Entry)

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate profiling and resealing the road

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 2 of 13

Streets affected: Petrie Street (half road closure with detour - traffic control on site) between Eden Avenue and Marine Parade

Show more

Start date: 9 October 2020

End date: 21 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate location of services

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 2 of 22

Streets affected: Yawalpah Road (Reduced lanes) between Attenborough Boulevard and Wallaby Way

Show more

Start date: 9 October 2020

End date: 30 October 2020

Duration: 9am – 2:30pm

Reason: Closures will be in place to allow workers to undertake investigation of conduit run

north

 
11 Oct - Sunday
Water and sewerage

Unplanned - Water Interruption - Currumbin

1.00pm - 2.00pm

Streets Affected : Blamey and Marma

Causes : Repair Water Service.

W/O : 20620372

Notif : 1000702649

south

Water and sewerage

Unplanned - Water Interruption - Elanora

3.00pm - 4.00pm

Streets Affected : Seabrook

Causes : Repair Water Service

W/O : 20625806

Notif : 1000709566

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 420 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 105 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 79 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 77 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 77 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 70 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 67 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 65 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 63 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 58 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 52 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 52 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 52 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 42 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 42 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 37 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 35 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Hollywell

Day 28 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 28 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 28 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 27 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 23 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 23 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 20 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 18 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Southport

Day 13 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 11 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 11 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 11 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 10 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 10 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 10 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 10 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 10 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 10 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 9 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 7 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 7 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 6 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 6 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 6 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 8

Streets affected: Garfield Terrace (half road closure with traffic control – expect delays) between Thornton Street and Aubrey Street

Show more

Start date: 6 October 2020

End date: 13 October 2020

Duration: 7am – 5pm

Reason: To facilitate conduit repairs for the NBN

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 6 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 5 of 9

Streets affected: Second Avenue (full road closure local traffic access only) between Gold Coast Highway and Surf Parade

Show more

Start date: 7 October 2020

End date: 15 October 2020

Duration: 6am – 9pm

Reason: To safely accommodate a large concrete pour for the development

south

Road closures

Planned - Temporary Road Closure - Miami

Day 5 of 8

Streets affected: Schuster Avenue (full road closure local traffic access only) between Redondo Avenue and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate garden maintenance

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 5 of 8

Streets affected: Havana Key (half road closure with traffic control – expect delays) between T E Peters Drive and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: Cleaning and relining of stormwater pipe

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 5 of 21

Streets affected: Boomerang Crescent (half road closure with traffic control – expect delays) between Bundall Road and Wombat Court

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 5 of 21

Streets affected: Monaco Street (half road closure with traffic control – expect delays) between bridge (West of) and bridge (East of) Pacific Boulevard

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 5 of 21

Streets affected: Ron Penhaligon Way (half road closure with traffic control – expect delays) between Cottesloe Drive and Manly Drive

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Boreholing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 21

Streets affected: Tarcoola Crescent (Reduced lanes) between Stanhill Drive (North) and Stanhill Drive (South)

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 5 of 21

Streets affected: Rio Vista Boulevard (half road closure with traffic control – expect delays) between Meredith Drive and Monaco Street

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 9am – 3pm

Reason: Boreholing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 5 of 10

Streets affected: Cheltenham Drive and Killarney Avenue intersection (Reduced lanes) between Tullamarine Drive and Glenferrie Drive

Show more

Start date: 7 October 2020

End date: 16 October 2020

Duration: 9am – 2pm

Reason: Damaged traffic signals requiring repair after burst water main

south

Road closures

Planned - Temporary Road Closure - Molendinar

Day 4 of 22

Streets affected: Trade Court (full road closure local traffic access only) between Activity Crescent and End of road

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalt work

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 4 of 22

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between 30 Old Coach Road and 160 Seal Change (College Entry)

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate profiling and resealing the road

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 3 of 13

Streets affected: Petrie Street (half road closure with detour - traffic control on site) between Eden Avenue and Marine Parade

Show more

Start date: 9 October 2020

End date: 21 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate location of services

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 3 of 22

Streets affected: Yawalpah Road (Reduced lanes) between Attenborough Boulevard and Wallaby Way

Show more

Start date: 9 October 2020

End date: 30 October 2020

Duration: 9am – 2:30pm

Reason: Closures will be in place to allow workers to undertake investigation of conduit run

north

Road closures

Planned - Temporary Road Closure - Palm Beach

5.00am - 2.00pm

Streets affected: Tahiti Avenue (half road closure with detour - traffic control on site) between Palm Beach Avenue and Illaroo Street

Show more

Start date: 11 October 2020

End date: 11 October 2020

Duration: 5am – 2pm

Reason: ENERGEX maintenance works

south

Road closures

Planned - Temporary Road Closure - Nerang / Mudgeeraba

6.00am - 1.00pm

Various streets affected: Hope Street to Mudgeeraba Road (traffic under police control – expect delays)

Show more

Start date: 11 October 2020

End date: 11 October 2020

Duration: 6am – 1pm

Reason: Robbie McEwen Gran Fondo 2020 Cycling Event

north

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 21

Streets affected: Wardoo Street (Reduced lanes) between Johnston Street and Southport Nerang Road

Show more

Also affected: Kumbari Street, Terrigal Crescent, Sungold Avenue, Baratta Street and Queen Street

Start date: 11 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: To facilitate road re-construction and sealing

north

 
12 Oct - Monday
Water and sewerage

Unplanned - Water Interruption - Miami

10.45am - 3.00pm

Streets Affected - Pacific Avenue

Cause - Water main repairs

W/O - 20625898

Notif - 1000709649

south

Water and sewerage

Unplanned - Water Interruption - Southport

11.15am - 12.45pm

Streets Affected - Dandar Drive

Cause - Water hydrant repairs

W/O - 20621921

Notif - 1000704659

central

Water and sewerage

Unplanned - Water Interruption - Molendinar

1.05pm - 2.30pm

Streets Affected - Parkridge Drive

Cause - Water main repairs

W/O - 20621766

Notif - 1000704491

central

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 421 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 106 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 80 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 78 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 78 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 71 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 68 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 66 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 64 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 59 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 53 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 53 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 53 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 43 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 43 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 38 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 36 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Hollywell

Day 29 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 29 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 29 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 28 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 24 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 24 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 21 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 19 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Southport

Day 14 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 12 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 12 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 12 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 11 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 11 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 11 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 11 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 11 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 11 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 10 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 8 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 8 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 7 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 7 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 7 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 8

Streets affected: Garfield Terrace (half road closure with traffic control – expect delays) between Thornton Street and Aubrey Street

Show more

Start date: 6 October 2020

End date: 13 October 2020

Duration: 7am – 5pm

Reason: To facilitate conduit repairs for the NBN

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 7 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 6 of 9

Streets affected: Second Avenue (full road closure local traffic access only) between Gold Coast Highway and Surf Parade

Show more

Start date: 7 October 2020

End date: 15 October 2020

Duration: 6am – 9pm

Reason: To safely accommodate a large concrete pour for the development

south

Road closures

Planned - Temporary Road Closure - Miami

Day 6 of 8

Streets affected: Schuster Avenue (full road closure local traffic access only) between Redondo Avenue and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate garden maintenance

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 6 of 8

Streets affected: Havana Key (half road closure with traffic control – expect delays) between T E Peters Drive and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: Cleaning and relining of stormwater pipe

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 6 of 21

Streets affected: Boomerang Crescent (half road closure with traffic control – expect delays) between Bundall Road and Wombat Court

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 6 of 21

Streets affected: Monaco Street (half road closure with traffic control – expect delays) between bridge (West of) and bridge (East of) Pacific Boulevard

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 6 of 21

Streets affected: Ron Penhaligon Way (half road closure with traffic control – expect delays) between Cottesloe Drive and Manly Drive

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Boreholing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 21

Streets affected: Tarcoola Crescent (Reduced lanes) between Stanhill Drive (North) and Stanhill Drive (South)

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 6 of 21

Streets affected: Rio Vista Boulevard (half road closure with traffic control – expect delays) between Meredith Drive and Monaco Street

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 9am – 3pm

Reason: Boreholing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 6 of 10

Streets affected: Cheltenham Drive and Killarney Avenue intersection (Reduced lanes) between Tullamarine Drive and Glenferrie Drive

Show more

Start date: 7 October 2020

End date: 16 October 2020

Duration: 9am – 2pm

Reason: Damaged traffic signals requiring repair after burst water main

south

Road closures

Planned - Temporary Road Closure - Molendinar

Day 5 of 22

Streets affected: Trade Court (full road closure local traffic access only) between Activity Crescent and End of road

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalt work

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 5 of 22

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between 30 Old Coach Road and 160 Seal Change (College Entry)

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate profiling and resealing the road

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 4 of 13

Streets affected: Petrie Street (half road closure with detour - traffic control on site) between Eden Avenue and Marine Parade

Show more

Start date: 9 October 2020

End date: 21 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate location of services

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 4 of 22

Streets affected: Yawalpah Road (Reduced lanes) between Attenborough Boulevard and Wallaby Way

Show more

Start date: 9 October 2020

End date: 30 October 2020

Duration: 9am – 2:30pm

Reason: Closures will be in place to allow workers to undertake investigation of conduit run

north

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 21

Streets affected: Wardoo Street (Reduced lanes) between Johnston Street and Southport Nerang Road

Show more

Also affected: Kumbari Street, Terrigal Crescent, Sungold Avenue, Baratta Street and Queen Street

Start date: 11 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: To facilitate road re-construction and sealing

north

Road closures

Planned - Temporary Road Closure - Robina

Day 1 of 13

Streets affected: East Lane (full road closure local traffic access only) between Stadium Drive and End of road

Show more

Start date: 12 October 2020

End date: 24 October 2020

Duration: Midnight – 11:59pm

Reason: Installation of a stormwater drainage system for a new 10 lot subdivision

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 1 of 32

Streets affected: Dorset Street (full road closure local traffic access only) between Fountain Street and Woodrow Street

Show more

Start date: 12 October 2020

End date: 12 November 2020

Duration: Midnight – 11:59pm

Reason: To build a new manhole over an existing stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 1 of 15

Streets affected: Rutledge Street (full road closure local traffic access only) between Tweed Street and Gordon Lane

Show more

Start date: 12 October 2020

End date: 26 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate remedial repairs

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 1 of 19

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Date 1: 12 October 2020 to 16 October 2020 (maximum 2 days only)

Date 2: 19 October 2020 to 23 October 2020 (maximum 2 days only)

Date 3: 26 October 2020 to 30 October 2020 (maximum 2 days only)

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries and concrete pours for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 1 of 15

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Hedges Avenue and Gold Coast Highway

Show more

Start date: 12 October 2020

End date: 26 October 2020

Duration: 7am – 3:30pm

Reason: Installation of water main

south

Road closures

Planned - Temporary Road Closure - Benowa

Day 0 of 23

Streets affected: Benowa Road (half road closure with traffic control – expect delays) between Kilbreck Street and Lunar Court

Show more

Also affected: Collins Crescent, Lambros Drive, Mediterranean Drive, St Kevins Avenue, Ashmore Road, Dunkeith Avenue and Marbella Drive

Start date: 12 October 2020

End date: 4 November 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 4

Streets affected: Cavill Avenue (full road closure local traffic access only) between Ferny Avenue and Surfers Paradise Boulevard

Show more

Start date: 12 October 2020

End date: 15 October 2020

Duration: 9pm – 5am

Reason: Crane lift of air-conditioning unit onto the roof of 50 Cavill Avenue

north

Water and sewerage

Planned - Sewer night works - Main Beach

Day 1 of 2

Streets affected: Waterways Drive, Rankin Pde, Lennie Ave, Hughes Ave, Peak Ave, Woodroffe Ave,Tedder ave, Breaker Street, Cronin Ave, Mount Batten and Montgomery Ave,Main Beach SPS A39 Tanker discharge area -SPS A2 Marine PDe, Nind St, Welch Street, Marshall Lane Southport

Cause:  Sewer works (noise) - Construction of sewer infrastructure

W/O: 60008467

Notif: 1000708550

Ispot/Pathway: 77818871

 

Show more

Start time and date: 10.00pm, 12 October
End time and date: 05.00am, 13 October

central

 
13 Oct - Tuesday
Water and sewerage

Unplanned - Water Interruption - Burleigh Waters

10.15am - 11.30am

Streets Affected - Wagtail Court

Cause - Water main repairs

W/O - 20625830

Notif - 1000709574

south

Water and sewerage

Unplanned - Recycled Water Interruption - Coomera

11.20am - 12.00pm

Streets Affected - Prewett Street, Greg Link

Cause - Recycled water main repairs 

W/O - 20624802

 

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 422 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 107 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 81 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 79 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 79 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 72 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 69 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 67 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 65 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 60 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 54 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 54 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 54 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 44 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 44 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 39 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 37 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Hollywell

Day 30 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 30 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 30 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 29 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 25 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 25 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 22 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 20 of 20

Streets affected: Hinterland Drive (full road closure local traffic access only) between Gold Coast Springbrook Road and Cobai Drive

Show more

Start date: 24 September 2020

End date: 13 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repair, road profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Southport

Day 15 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 13 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 13 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 13 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 12 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 12 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 12 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 12 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 12 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 12 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 11 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 9 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 9 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 8 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 8 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 8 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 8

Streets affected: Garfield Terrace (half road closure with traffic control – expect delays) between Thornton Street and Aubrey Street

Show more

Start date: 6 October 2020

End date: 13 October 2020

Duration: 7am – 5pm

Reason: To facilitate conduit repairs for the NBN

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 8 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 7 of 9

Streets affected: Second Avenue (full road closure local traffic access only) between Gold Coast Highway and Surf Parade

Show more

Start date: 7 October 2020

End date: 15 October 2020

Duration: 6am – 9pm

Reason: To safely accommodate a large concrete pour for the development

south

Road closures

Planned - Temporary Road Closure - Miami

Day 7 of 8

Streets affected: Schuster Avenue (full road closure local traffic access only) between Redondo Avenue and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate garden maintenance

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 7 of 8

Streets affected: Havana Key (half road closure with traffic control – expect delays) between T E Peters Drive and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: Cleaning and relining of stormwater pipe

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 7 of 21

Streets affected: Boomerang Crescent (half road closure with traffic control – expect delays) between Bundall Road and Wombat Court

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 7 of 21

Streets affected: Monaco Street (half road closure with traffic control – expect delays) between bridge (West of) and bridge (East of) Pacific Boulevard

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 7 of 21

Streets affected: Ron Penhaligon Way (half road closure with traffic control – expect delays) between Cottesloe Drive and Manly Drive

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Boreholing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 21

Streets affected: Tarcoola Crescent (Reduced lanes) between Stanhill Drive (North) and Stanhill Drive (South)

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 7 of 21

Streets affected: Rio Vista Boulevard (half road closure with traffic control – expect delays) between Meredith Drive and Monaco Street

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 9am – 3pm

Reason: Boreholing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 7 of 10

Streets affected: Cheltenham Drive and Killarney Avenue intersection (Reduced lanes) between Tullamarine Drive and Glenferrie Drive

Show more

Start date: 7 October 2020

End date: 16 October 2020

Duration: 9am – 2pm

Reason: Damaged traffic signals requiring repair after burst water main

south

Road closures

Planned - Temporary Road Closure - Molendinar

Day 6 of 22

Streets affected: Trade Court (full road closure local traffic access only) between Activity Crescent and End of road

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalt work

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 6 of 22

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between 30 Old Coach Road and 160 Seal Change (College Entry)

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate profiling and resealing the road

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 5 of 13

Streets affected: Petrie Street (half road closure with detour - traffic control on site) between Eden Avenue and Marine Parade

Show more

Start date: 9 October 2020

End date: 21 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate location of services

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 5 of 22

Streets affected: Yawalpah Road (Reduced lanes) between Attenborough Boulevard and Wallaby Way

Show more

Start date: 9 October 2020

End date: 30 October 2020

Duration: 9am – 2:30pm

Reason: Closures will be in place to allow workers to undertake investigation of conduit run

north

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 21

Streets affected: Wardoo Street (Reduced lanes) between Johnston Street and Southport Nerang Road

Show more

Also affected: Kumbari Street, Terrigal Crescent, Sungold Avenue, Baratta Street and Queen Street

Start date: 11 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: To facilitate road re-construction and sealing

north

Road closures

Planned - Temporary Road Closure - Robina

Day 2 of 13

Streets affected: East Lane (full road closure local traffic access only) between Stadium Drive and End of road

Show more

Start date: 12 October 2020

End date: 24 October 2020

Duration: Midnight – 11:59pm

Reason: Installation of a stormwater drainage system for a new 10 lot subdivision

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 2 of 32

Streets affected: Dorset Street (full road closure local traffic access only) between Fountain Street and Woodrow Street

Show more

Start date: 12 October 2020

End date: 12 November 2020

Duration: Midnight – 11:59pm

Reason: To build a new manhole over an existing stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 2 of 15

Streets affected: Rutledge Street (full road closure local traffic access only) between Tweed Street and Gordon Lane

Show more

Start date: 12 October 2020

End date: 26 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate remedial repairs

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 2 of 19

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Date 1: 12 October 2020 to 16 October 2020 (maximum 2 days only)

Date 2: 19 October 2020 to 23 October 2020 (maximum 2 days only)

Date 3: 26 October 2020 to 30 October 2020 (maximum 2 days only)

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries and concrete pours for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 2 of 15

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Hedges Avenue and Gold Coast Highway

Show more

Start date: 12 October 2020

End date: 26 October 2020

Duration: 7am – 3:30pm

Reason: Installation of water main

south

Road closures

Planned - Temporary Road Closure - Benowa

Day 1 of 23

Streets affected: Benowa Road (half road closure with traffic control – expect delays) between Kilbreck Street and Lunar Court

Show more

Also affected: Collins Crescent, Lambros Drive, Mediterranean Drive, St Kevins Avenue, Ashmore Road, Dunkeith Avenue and Marbella Drive

Start date: 12 October 2020

End date: 4 November 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 4

Streets affected: Cavill Avenue (full road closure local traffic access only) between Ferny Avenue and Surfers Paradise Boulevard

Show more

Start date: 12 October 2020

End date: 15 October 2020

Duration: 9pm – 5am

Reason: Crane lift of air-conditioning unit onto the roof of 50 Cavill Avenue

north

Water and sewerage

Planned - Sewer night works - Main Beach

Day 2 of 2

Streets affected: Waterways Drive, Rankin Pde, Lennie Ave, Hughes Ave, Peak Ave, Woodroffe Ave,Tedder ave, Breaker Street, Cronin Ave, Mount Batten and Montgomery Ave,Main Beach SPS A39 Tanker discharge area -SPS A2 Marine PDe, Nind St, Welch Street, Marshall Lane Southport

Cause:  Sewer works (noise) - Construction of sewer infrastructure

W/O: 60008467

Notif: 1000708550

Ispot/Pathway: 77818871

 

Show more

Start time and date: 10.00pm, 12 October
End time and date: 05.00am, 13 October

central

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 2.00pm

Streets affected: Auk Ave, Whistle Drv, Razorbill Street and Whistler Drv Burleigh Waters

Cause:  Water Shutdown for Hydrant replacement program

W/O: 1000702710

Notif: 60008181

Ispot/Pathway: 77621834

 

south

Water and sewerage

Planned - Water Interruption - Pimpama

9.00am - 2.00pm

Streets affected: 180 Yawalpah Road Pimpama

Cause: Watermain Sutdown

W/O: 20620576

Notif: 1000702927

Ispot/Pathway: WWS/2020/424

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 1 of 2

Streets affected: Goodwin Terrace (full road closure local traffic access only) between Gold Coast Highway and Hayle Street

Show more

Start date: 13 October 2020

End date: 14 October 2020

Duration: 6:30pm – 6am

Reason: To facilitate the crane installation

south

Water and sewerage

Planned - Water Interruption - Nerang

Day 0 of 31

Streets affected: Southport Nerang Road Ferry Street Price Street Carpark Nerang

Cause: Watermain Shutdown

W/O: 60006411

Notif: 1000554243

Ispot/Pathway: 77800531

 

 

north

 
14 Oct - Wednesday
Water and sewerage

Unplanned - Water Interruption - Mermaid Waters

8.50am - 10.00am

Streets Affected - Karbunya Street

Cause - Water main repairs

W/O - 20626228

Notif - 1000710005

south

Water and sewerage

Unplanned - Water Interruption - Labrador

9.20am - 10.30am

Streets Affected - Walter Street

Cause - Water meter replacement

W/O - 60008473

Notif - 1000709682

north

Water and sewerage

Unplanned - Water Interruption - Upper Coomera

1.20pm - 2.30pm

Streets Affected - Glenshee Street, Ridgemont Street, Sandhurst Crescent

Cause - Water main repairs

W/O - 20626548

Notif - 1000710346

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 423 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 108 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 82 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 80 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 80 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 73 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 70 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 68 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 66 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 61 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 55 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 55 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 55 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 45 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 45 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 40 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 38 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Hollywell

Day 31 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 31 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 31 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 30 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 26 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 26 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 23 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Southport

Day 16 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 14 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 14 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 14 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 13 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 13 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 13 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 13 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 13 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 13 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 12 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 10 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 10 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 9 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 9 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 9 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 9 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 8 of 9

Streets affected: Second Avenue (full road closure local traffic access only) between Gold Coast Highway and Surf Parade

Show more

Start date: 7 October 2020

End date: 15 October 2020

Duration: 6am – 9pm

Reason: To safely accommodate a large concrete pour for the development

south

Road closures

Planned - Temporary Road Closure - Miami

Day 8 of 8

Streets affected: Schuster Avenue (full road closure local traffic access only) between Redondo Avenue and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate garden maintenance

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 8 of 8

Streets affected: Havana Key (half road closure with traffic control – expect delays) between T E Peters Drive and End of road

Show more

Start date: 7 October 2020

End date: 14 October 2020

Duration: 6:30am – 6:30pm

Reason: Cleaning and relining of stormwater pipe

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 8 of 21

Streets affected: Boomerang Crescent (half road closure with traffic control – expect delays) between Bundall Road and Wombat Court

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 8 of 21

Streets affected: Monaco Street (half road closure with traffic control – expect delays) between bridge (West of) and bridge (East of) Pacific Boulevard

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 8 of 21

Streets affected: Ron Penhaligon Way (half road closure with traffic control – expect delays) between Cottesloe Drive and Manly Drive

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Boreholing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 21

Streets affected: Tarcoola Crescent (Reduced lanes) between Stanhill Drive (North) and Stanhill Drive (South)

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 8 of 21

Streets affected: Rio Vista Boulevard (half road closure with traffic control – expect delays) between Meredith Drive and Monaco Street

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 9am – 3pm

Reason: Boreholing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 8 of 10

Streets affected: Cheltenham Drive and Killarney Avenue intersection (Reduced lanes) between Tullamarine Drive and Glenferrie Drive

Show more

Start date: 7 October 2020

End date: 16 October 2020

Duration: 9am – 2pm

Reason: Damaged traffic signals requiring repair after burst water main

south

Road closures

Planned - Temporary Road Closure - Molendinar

Day 7 of 22

Streets affected: Trade Court (full road closure local traffic access only) between Activity Crescent and End of road

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalt work

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 7 of 22

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between 30 Old Coach Road and 160 Seal Change (College Entry)

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate profiling and resealing the road

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 6 of 13

Streets affected: Petrie Street (half road closure with detour - traffic control on site) between Eden Avenue and Marine Parade

Show more

Start date: 9 October 2020

End date: 21 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate location of services

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 6 of 22

Streets affected: Yawalpah Road (Reduced lanes) between Attenborough Boulevard and Wallaby Way

Show more

Start date: 9 October 2020

End date: 30 October 2020

Duration: 9am – 2:30pm

Reason: Closures will be in place to allow workers to undertake investigation of conduit run

north

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 21

Streets affected: Wardoo Street (Reduced lanes) between Johnston Street and Southport Nerang Road

Show more

Also affected: Kumbari Street, Terrigal Crescent, Sungold Avenue, Baratta Street and Queen Street

Start date: 11 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: To facilitate road re-construction and sealing

north

Road closures

Planned - Temporary Road Closure - Robina

Day 3 of 13

Streets affected: East Lane (full road closure local traffic access only) between Stadium Drive and End of road

Show more

Start date: 12 October 2020

End date: 24 October 2020

Duration: Midnight – 11:59pm

Reason: Installation of a stormwater drainage system for a new 10 lot subdivision

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 3 of 32

Streets affected: Dorset Street (full road closure local traffic access only) between Fountain Street and Woodrow Street

Show more

Start date: 12 October 2020

End date: 12 November 2020

Duration: Midnight – 11:59pm

Reason: To build a new manhole over an existing stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 3 of 15

Streets affected: Rutledge Street (full road closure local traffic access only) between Tweed Street and Gordon Lane

Show more

Start date: 12 October 2020

End date: 26 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate remedial repairs

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 3 of 19

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Date 1: 12 October 2020 to 16 October 2020 (maximum 2 days only)

Date 2: 19 October 2020 to 23 October 2020 (maximum 2 days only)

Date 3: 26 October 2020 to 30 October 2020 (maximum 2 days only)

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries and concrete pours for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 3 of 15

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Hedges Avenue and Gold Coast Highway

Show more

Start date: 12 October 2020

End date: 26 October 2020

Duration: 7am – 3:30pm

Reason: Installation of water main

south

Road closures

Planned - Temporary Road Closure - Benowa

Day 2 of 23

Streets affected: Benowa Road (half road closure with traffic control – expect delays) between Kilbreck Street and Lunar Court

Show more

Also affected: Collins Crescent, Lambros Drive, Mediterranean Drive, St Kevins Avenue, Ashmore Road, Dunkeith Avenue and Marbella Drive

Start date: 12 October 2020

End date: 4 November 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 4

Streets affected: Cavill Avenue (full road closure local traffic access only) between Ferny Avenue and Surfers Paradise Boulevard

Show more

Start date: 12 October 2020

End date: 15 October 2020

Duration: 9pm – 5am

Reason: Crane lift of air-conditioning unit onto the roof of 50 Cavill Avenue

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 2 of 2

Streets affected: Goodwin Terrace (full road closure local traffic access only) between Gold Coast Highway and Hayle Street

Show more

Start date: 13 October 2020

End date: 14 October 2020

Duration: 6:30pm – 6am

Reason: To facilitate the crane installation

south

Water and sewerage

Planned - Water Interruption - Nerang

Day 1 of 31

Streets affected: Southport Nerang Road Ferry Street Price Street Carpark Nerang

Cause: Watermain Shutdown

W/O: 60006411

Notif: 1000554243

Ispot/Pathway: 77800531

 

 

north

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Ormeau, Pimpama

4.00am - 6.00am

Areas affected: Ormeau, Pimpama

 

Mosquito/biting midge spraying will be undertaken in these areas on Wednesday 14th October 2020 from 4am to 6am for control of mosquitos and biting midges (weather permitting).

all regions

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 1 of 17

Streets affected: Twenty Fifth Avenue (full road closure local traffic access only) between Esplanade and Gold Coast Highway

Show more

Start date: 14 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the concrete pour

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 1 of 15

Streets affected: Petrel Avenue (half road closure with traffic control – expect delays) between Heron Avenue and Surf Street

Show more

Start date: 14 October 2020

End date: 28 October 2020

Duration: 7am – 3:30pm

Reason: Installation of water main

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 1 of 27

Streets affected: Cayuga Street intersection with New Street (Reduced lanes) between Gilston Road and Miskin Street

Show more

Start date: 14 October 2020

End date: 9 November 2020

Duration: 8am – 3pm

Reason: To facilitate installation of new footings, pole and conduit

north

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 2.00pm

Streets affected:  Deodar Drive, Comet Drive, Omao Drv, Coleto Crescent, Burleigh Waters

Cause:  Water Shutdown for Hydrant replacement program

W/O: 1000702713

Notif: 60008181

Ispot/Pathway: 77621834

south

Water and sewerage

Planned - Water Interruption - Surfers Paradise

9.00am - 2.00pm

Streets affected: Cannes Avenue Genoa Street Monaco Street Gold Coast Highway Surfers Paradise

Cause: Watermain Shutdown

W/O: 52012804

Notif: 1000700453

Ispot/Pathway: WWS/2020/438

north

Water and sewerage

Planned - Sewerage Interruption - Coombabah

Day 1 of 2

Streets affected: Brisbane Road Coombabah

Cause: Sewer Shutdown

W/O: 60006926

Notif: 1000594884

Ispot/Pathway: 77633226

north

 
15 Oct - Thursday
Water and sewerage

Unplanned - Water Interruption - Palm Beach

10.45am - 12.00pm

Streets Affected - Twenty Eighth Avenue

Cause - Water main repairs

W/O - 20627014

Notif - 1000710908

south

Water and sewerage

Unplanned - Water Interruption - Southport

12.00pm - 1.30pm

Streets Affected - Cooleroo Crescent

Cause - Water main repairs

W/O - 20618949

Notif - 1000700870

central

Water and sewerage

Unplanned - Water Interruption - Robina

12.45pm - 3.00pm

Streets Affected - Glen Iris Place

Cause - Water hydrant repairs

W/O - 20626317

Notif - 1000710114

south

Water and sewerage

Unplanned - Water Interruption - Runaway Bay

6.20pm - 7.20pm

Streets affected: Sundance Way

Cause: Repair watermain

W/O 20627220

Notif 1000711191

north

Water and sewerage

Unplanned - Water Interruption - Nerang

Day 1 of 2

Streets affected: Lawrence Drive

Cause: Repair water main

W/O: 20626498

Notif: 1000710269

Show more

Start time and date: 10.50pm, 15 October 2020

End time and date: 2.50am, 16 October 2020

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 424 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 109 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 83 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 81 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 81 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 74 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 71 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 69 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 67 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 62 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 56 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 56 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 56 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 46 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 46 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 41 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 39 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Hollywell

Day 32 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 32 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 32 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 31 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 27 of 43

Streets affected: Michigan Drive (half road closure with traffic control – expect delays) between Hoad Court and California Drive

Show more

Also affected: Riversdale Road and Idaho Place

Date 1: 19 September 2020 to 4 October 2020 (School Holidays)

Date 2: 10 October 2020 to 31 October 2020 (Sat and Sun only)

Duration: 6:30am – 6:30pm

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Southport

Day 27 of 31

Streets affected: Olympic Circuit (half road closure with traffic control – expect delays) between Pirelli Street and Firestone Street

Show more

Start date: 19 September 2020

End date: 19 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate removal and truck loading of scaffolding

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 24 of 92

Streets affected: Woodroffe Avenue (traffic control/full road/parking lane/bay/daily verge/footpath - expect delays) between Main Beach Parade and End of Road (East)

Start date: 22 September 2020

End date: 22 December 2020
 
Duration: 5.00am to 6.30pm

Reason: Various closures to facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Southport

Day 17 of 18

Streets affected: Lilli Pilli Drive (full road closure local traffic access only) between Tongarra Street and Anne Street

Show more

Start date: 29 September 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road failure repairs, profiling and wearing course treatment

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 15 of 51

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and McVeigh Street

Show more

Also affected: Trump Street, Perger Street and McVeigh Street

Stage 1 dates: 1 October 2020 to 26 October 2020   (Southbound)

Stage 2 dates: 15 October 2020 to 26 October 2020   (Northbound)

Stage 3 dates: 26 October 2020 to 20 November 2020   (Southbound)

Stage 1 Duration: Midnight – 11:59pm

Stage 2 Duration: 6:30am – 6:30pm

Stage 3 Duration: Midnight – 11:59pm

Reason: Road work and stormwater upgrades

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 15 of 16

Streets affected: Whiting Street (full road closure local traffic access only) between Gemma Glade and Turpin Road

Show more

Also affected: Wilson Street, Curtis Street and Government Road

Start date: 1 October 2020

End date: 16 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate road profiling, failure repairs and sealing

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 15 of 51

Streets affected: Vatakoula Parade (half road closure with traffic control – expect delays) between Surfers Avenue and Verdichio Avenue

Show more

Also affected: Vevey Street

Start date: 1 October 2020

End date: 20 November 2020

Duration: 6:30am – 6:30pm

Reason: Remove and reconstruct Kerb & Channel plus driveways within nominated area

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 14 of 78

Streets affected: Eastlake Drive (half road closure with traffic control – expect delays) between Elysium Road and End of road

Show more

Start date: 2 October 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 14 of 18

Streets affected: Esplanade (half road closure with traffic control – expect delays) between Elkhorn Avenue and Hanlan Street

Show more

Also affected: Cavill Avenue (half road closure with traffic control – expect delays) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020

Duration: 6:30am – 5:30pm

Reason: Installation of static bollards within the verge/footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 14 of 18

Streets affected: The Esplanade (traffic control, partial lane, verge/footpath, half road - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 14 of 18

Streets affected: Cavill Avenue (half road - traffic control, partial lane, verge/footpath - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 6.30am - 5.30pm

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 14 of 18

Streets affected: The Esplanade (full road closure - traffic control - expect delays ) between Elkhorn Avenue and Hanlan Street

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 9.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 14 of 18

Streets affected: Cavill Avenue (full road - traffic control - expect delays ) between Orchid Avenue and Surfers Paradise Boulevard

Start date: 2 October 2020

End date: 19 October 2020      

Duration: 09.00pm - 5.00am

Reason: Installation of static bollards within the verge / footpath of both areas

south

Road closures

Planned - Temporary Road Closure - Maudsland

Day 13 of 29

Streets affected: Riverstone Crossing (half road closure with traffic control – expect delays) between Rivermill Terrace and Maudsland Road

Show more

Start date: 3 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Parkwood

Day 11 of 19

Streets affected: Henry Cotton Drive (half road closure with traffic control – expect delays) between Lakewood Court and Faldo Court

Show more

Also affected: Stanton Court, Peter Senior Court, Longcove Place and Long Reef Crescent

Start date: 5 October 2020

End date: 23 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate asphalt works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 11 of 26

Streets affected: Gawthern Drive (half road closure with detour - traffic control on site) between Yawalpah Road and Trump Street

Show more

Start date: 5 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade (signalisation of intersection)

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 10 of 32

Streets affected: Alfred Street (full road closure local traffic access only) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 6 October 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Sewer mains pipe diversion works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 10 of 22

Streets affected: Jefferson Lane (full road closure local traffic access only) between Seventh Avenue and Ninth Avenue

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate larger concrete pours

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 10 of 79

Streets affected: Karbunya Street (half road closure with detour - traffic control on site) between Sonia Street and Peter Parade

Show more

Start date: 6 October 2020

End date: 23 December 2020

Duration: 6:30am – 5:30pm

Reason: Upgrade stormwater infrastructure pipe network

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 10 of 22

Streets affected: Intersection of Foxwell Road and Oakey Creek Road (Reduced lanes) between Foreshore Street and Henry Street

Show more

Start date: 6 October 2020

End date: 27 October 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new CCTV footing and pole

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 9 of 9

Streets affected: Second Avenue (full road closure local traffic access only) between Gold Coast Highway and Surf Parade

Show more

Start date: 7 October 2020

End date: 15 October 2020

Duration: 6am – 9pm

Reason: To safely accommodate a large concrete pour for the development

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 9 of 21

Streets affected: Boomerang Crescent (half road closure with traffic control – expect delays) between Bundall Road and Wombat Court

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 9 of 21

Streets affected: Monaco Street (half road closure with traffic control – expect delays) between bridge (West of) and bridge (East of) Pacific Boulevard

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 9 of 21

Streets affected: Ron Penhaligon Way (half road closure with traffic control – expect delays) between Cottesloe Drive and Manly Drive

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Boreholing to determine pavement and asphalt depths

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 21

Streets affected: Tarcoola Crescent (Reduced lanes) between Stanhill Drive (North) and Stanhill Drive (South)

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 7:30am – 3pm

Reason: Bore-holing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 9 of 21

Streets affected: Rio Vista Boulevard (half road closure with traffic control – expect delays) between Meredith Drive and Monaco Street

Show more

Start date: 7 October 2020

End date: 27 October 2020

Duration: 9am – 3pm

Reason: Boreholing to determine pavement depths

south

Road closures

Planned - Temporary Road Closure - Robina

Day 9 of 10

Streets affected: Cheltenham Drive and Killarney Avenue intersection (Reduced lanes) between Tullamarine Drive and Glenferrie Drive

Show more

Start date: 7 October 2020

End date: 16 October 2020

Duration: 9am – 2pm

Reason: Damaged traffic signals requiring repair after burst water main

south

Road closures

Planned - Temporary Road Closure - Molendinar

Day 8 of 22

Streets affected: Trade Court (full road closure local traffic access only) between Activity Crescent and End of road

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6pm – 6am

Reason: Road profiling and asphalt work

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 8 of 22

Streets affected: Bridgman Drive (half road closure with traffic control – expect delays) between 30 Old Coach Road and 160 Seal Change (College Entry)

Show more

Start date: 8 October 2020

End date: 29 October 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate profiling and resealing the road

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 7 of 13

Streets affected: Petrie Street (half road closure with detour - traffic control on site) between Eden Avenue and Marine Parade

Show more

Start date: 9 October 2020

End date: 21 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate location of services

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 7 of 22

Streets affected: Yawalpah Road (Reduced lanes) between Attenborough Boulevard and Wallaby Way

Show more

Start date: 9 October 2020

End date: 30 October 2020

Duration: 9am – 2:30pm

Reason: Closures will be in place to allow workers to undertake investigation of conduit run

north

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 21

Streets affected: Wardoo Street (Reduced lanes) between Johnston Street and Southport Nerang Road

Show more

Also affected: Kumbari Street, Terrigal Crescent, Sungold Avenue, Baratta Street and Queen Street

Start date: 11 October 2020

End date: 31 October 2020

Duration: 6pm – 6am

Reason: To facilitate road re-construction and sealing

north

Road closures

Planned - Temporary Road Closure - Robina

Day 4 of 13

Streets affected: East Lane (full road closure local traffic access only) between Stadium Drive and End of road

Show more

Start date: 12 October 2020

End date: 24 October 2020

Duration: Midnight – 11:59pm

Reason: Installation of a stormwater drainage system for a new 10 lot subdivision

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 4 of 32

Streets affected: Dorset Street (full road closure local traffic access only) between Fountain Street and Woodrow Street

Show more

Start date: 12 October 2020

End date: 12 November 2020

Duration: Midnight – 11:59pm

Reason: To build a new manhole over an existing stormwater pipe

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 4 of 15

Streets affected: Rutledge Street (full road closure local traffic access only) between Tweed Street and Gordon Lane

Show more

Start date: 12 October 2020

End date: 26 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate remedial repairs

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 4 of 19

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Show more

Date 1: 12 October 2020 to 16 October 2020 (maximum 2 days only)

Date 2: 19 October 2020 to 23 October 2020 (maximum 2 days only)

Date 3: 26 October 2020 to 30 October 2020 (maximum 2 days only)

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries and concrete pours for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 4 of 15

Streets affected: Peerless Avenue (half road closure with traffic control – expect delays) between Hedges Avenue and Gold Coast Highway

Show more

Start date: 12 October 2020

End date: 26 October 2020

Duration: 7am – 3:30pm

Reason: Installation of water main

south

Road closures

Planned - Temporary Road Closure - Benowa

Day 3 of 23

Streets affected: Benowa Road (half road closure with traffic control – expect delays) between Kilbreck Street and Lunar Court

Show more

Also affected: Collins Crescent, Lambros Drive, Mediterranean Drive, St Kevins Avenue, Ashmore Road, Dunkeith Avenue and Marbella Drive

Start date: 12 October 2020

End date: 4 November 2020

Duration: 6:30pm – 6:30am

Reason: To facilitate road profiling and asphalting

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 4

Streets affected: Cavill Avenue (full road closure local traffic access only) between Ferny Avenue and Surfers Paradise Boulevard

Show more

Start date: 12 October 2020

End date: 15 October 2020

Duration: 9pm – 5am

Reason: Crane lift of air-conditioning unit onto the roof of 50 Cavill Avenue

north

Water and sewerage

Planned - Water Interruption - Nerang

Day 2 of 31

Streets affected: Southport Nerang Road Ferry Street Price Street Carpark Nerang

Cause: Watermain Shutdown

W/O: 60006411

Notif: 1000554243

Ispot/Pathway: 77800531

 

 

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 2 of 17

Streets affected: Twenty Fifth Avenue (full road closure local traffic access only) between Esplanade and Gold Coast Highway

Show more

Start date: 14 October 2020

End date: 30 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate the concrete pour

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 2 of 15

Streets affected: Petrel Avenue (half road closure with traffic control – expect delays) between Heron Avenue and Surf Street

Show more

Start date: 14 October 2020

End date: 28 October 2020

Duration: 7am – 3:30pm

Reason: Installation of water main

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 2 of 27

Streets affected: Cayuga Street intersection with New Street (Reduced lanes) between Gilston Road and Miskin Street

Show more

Start date: 14 October 2020

End date: 9 November 2020

Duration: 8am – 3pm

Reason: To facilitate installation of new footings, pole and conduit

north

Water and sewerage

Planned - Sewerage Interruption - Coombabah

Day 2 of 2

Streets affected: Brisbane Road Coombabah

Cause: Sewer Shutdown

W/O: 60006926

Notif: 1000594884

Ispot/Pathway: 77633226

north

Road closures

Planned - Temporary Road Closure - Broadbeach

6.30am - 6.30pm

Streets affected: Surf Parade (half road closure with detour - traffic control on site) between Charles Avenue and Elizabeth Avenue

Show more

Start date: 15 October 2020

End date: 15 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate hoisting of roofing sheets

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 1 of 93

Streets affected: Sickle Avenue (half road closure with traffic control – expect delays) between Grant Avenue and Park Cove Boulevard

Show more

Also affected: Osmium Lane

Date 1: 15 October 2020 to 23 December 2020

Date 2: 4 January 2021 to 15 January 2021

Duration: 6:30am – 6:30pm

Reason: Construction of new car park (Park Cove Boulevard), re-construction of car park (Sickle Avenue), road widening and concrete footpath

north

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 2.00pm

Streets affected:  Burleigh Street, Carwell Drive, Condodr Court, Penguin Parade, Burleigh Waters

Cause:  Water Shutdown for Hydrant replacement program

W/O: 1000702715

Notif: 60008181

Ispot/Pathway: 77621834

south

Water and sewerage

Planned - Water Interruption - Southport

1.50pm - 3.00pm

Streets Affected - Fisher Avenue

Cause - Water hydrant repairs

W/O - 20626526

Notif - 1000710309

all regions

 
16 Oct - Friday
Water and sewerage

Unplanned - Water Interruption - Nerang

Day 2 of 2

Streets affected: Lawrence Drive

Cause: Repair water main

W/O: 20626498

Notif: 1000710269

Show more

Start time and date: 10.50pm, 15 October 2020

End time and date: 2.50am, 16 October 2020

south

Water and sewerage

Unplanned - Water Interruption - Burleigh Heads

9.30am - 10.30am

Streets Affected - Diana Avenue

Cause - Water main repairs

W/O - 20626193

Notif - 1000709939

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 425 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 110 of 125

Streets affected: Ward Street (half road closure with traffic control – expect delays) between Boundary Street and Eden Avenue

Show more

Start date: 29 June 2020

End date: 31 October 2020

Duration: 6:30am – 4pm

Reason: Kerb and channel replacement / footpath reconstruction

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 84 of 93

Streets affected: Pacific Street (half road closure with traffic control – expect delays) between Breaker Street and Main Beach Parade

Show more

Start date: 25 July 2020

End date: 25 October 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate construction of a new development

north

Road closures

Planned - Temporary Road Closure - Tugun

Day 82 of 127

Streets affected: Wagawn Street (traffic control on site – expect delays) between Teemangum Street and Pacific Parade

Show more

Start date: 27 July 2020

End date: 30 November 2020

Duration: 6:30am – 4:30pm

Reason: City project to install a new seawall, ocean way footpath and associated works

south

Road closures

Planned - Temporary Road Closure - Southport / Main Beach

Day 82 of 142

Streets affected: Gold Coast Highway (Reduced lanes) between Nerang Street and Admiralty Drive

Show more

Also affected: Ada Bell Way, Queen Street, Waterways Drive, Tedder Avenue and Main Beach Parade

Start date: 27 July 2020

End date: 15 December 2020

Duration 1: 6:30am – 5pm   (verge/footpath)

Duration 2: 9am - 2:30pm   (Gold Coast Highway and any closures with high impact)

Duration 3: 7pm - 5am   (night works)

Reason: To facilitate intersection upgrade at Waterways Drive; Sundale Bridge works and Medium Island upgrades - both sides of bridge

south

Road closures

Planned - Temporary Road Closure - Southport

Day 75 of 89

Streets affected: Kindra Avenue (half road closure with traffic control – expect delays) between Dandar Drive and End of road

Show more

Also affected: Warana Avenue and Cooleroo Crescent

Start date: 3 August 2020

End date: 30 October 2020

Duration 1: 6:30am – 6:30pm

Duration 2: 6:30pm - 6:30am (after care)

Reason: To facilitate stormwater drainage works and reinstatement of asphalt pavement

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 72 of 101

Streets affected: Old Pacific Highway (half road closure with traffic control – expect delays) between Ozkleen Place and Stapylton Jacobs Well Road

Show more

Also affected: Kaycee Place

Start date: 6 August 2020

End date: 14 November 2020

Duration: 6:30am – 5pm   (9am - 2:30pm at the Southern end)

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 70 of 93

Streets affected: Chelsea Avenue (half road closure with traffic control – expect delays) between Old Burleigh Road and Surf Parade

Show more

Start date: 8 August 2020

End date: 8 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 68 of 83

Streets affected: Surfers Avenue (half road closure with traffic control – expect delays) between Vatakoula Parade and Orvieto Avenue

Show more

Also affected: Le Mans Drive and Vatakoula Parade

Start date: 10 August 2020

End date: 31 October 2020

Duration: 6:30am – 5pm

Reason: To upgrade kerb and channel, footpaths, driveways and bridge guardrail

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 63 of 78

Streets affected: Peachey Road (full road closure local traffic access only) between Stanmore Road and Stephens Way

Show more

Also affected: Stanmore Road and Darlington Drive

Start date: 15 August 2020

End date: 31 October 2020

Duration: Midnight – 11:59pm

Reason: Intersection construction, stormwater connections for development

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 57 of 124

Streets affected: Woodroffe Avenue (full road closure local traffic access only) between Main Beach Parade and End of road

Show more

Start date: 21 August 2020

End date: 22 December 2020

Duration: 5am – 6:30pm

Reason: To facilitate safe environment for all road users during major deliveries utilising a mobile crane and concrete pours

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 57 of 120

Streets affected: Hinkler Drive (Reduced lanes) between M1 on Ramp (Exit 77) and Barrine Drive

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 57 of 120

Streets affected: Mudgeeraba Road (half road closure with traffic control – expect delays) between Hinkler Drive and Worongary Road

Show more

Start date: 21 August 2020

End date: 18 December 2020

Duration: 9am – 2:30pm

Reason: To facilitate installation of new communication pits and conduit network

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 47 of 93

Streets affected: Boundary Street (full road closure local traffic access only) between Ward Street and Tweed Terrace

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 4pm

Reason: Full road reconstruction / renew water main

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 47 of 93

Streets affected: Petrie Street (full road closure local traffic access only) between Boundary Street and Eden Avenue

Show more

Start date: 31 August 2020

End date: 1 December 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate reconstruction of pavement and renewal of water main

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 42 of 63

Streets affected: Mirinae Circuit (full road closure local traffic access only) between Lee Street and Soldier Bird Avenue

Show more

Start date: 5 September 2020

End date: 6 November 2020

Duration: Midnight – 11:59pm

Reason: Removal and relaying asphalt to rectify works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 40 of 56

Streets affected: Fairbourne Terrace (full road closure local traffic access only) between Chisolm Way and Coldstream Street

Show more

Also affected: Howard Street and Village Boulevard

Start date: 7 September 2020

End date: 1 November 2020

Duration: Midnight – 11:59pm

Reason: Asphalt works

north

Road closures

Planned - Temporary Road Closure - Hollywell

Day 33 of 98

Streets affected: Jacaranda Avenue (half road closure with detour - traffic control on site) between Bluegum Avenue and Poinsettia Avenue

Show more

Also affected: Salvia Street

Date 1: 14 September 2020 to 14 October 2020 (half road continuous closure)

Date 2: 15 October 2020 to 20 December 2020 (day closure only)

Duration: 6am – 5pm and 5pm - 6am (after care)

Reason: To facilitate Stage 2 of stormwater, kerb and channel, and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 33 of 49

Streets affected: Seaworld Drive (half road closure with traffic control – expect delays) between Muriel Henchman Drive and Waterways Drive

Show more

Start date: 14 September 2020

End date: 1 November 2020

Duration: 6:30am – 6:30pm

Reason: To facilitate tree clearing, construction of footpath and rock wall

south

Road closures

Planned - Temporary Road Closure - Hollywell

Day 33 of 98

Streets affected: Salvia Street (full road closure local traffic access only) between Jacaranda Avenue and Hyacinth Avenue; Jacaranda Avenue (half road closure with traffic control – expect delays) between Bluegum Avenue and Poinsettia Avenue

Show more

Date 1: 14 September 2020 to 20 September 2020   (Jacaranda Avenue)

Date 2: 25 September 2020 to 23 October 2020   (Salvia Street - Full Road)

Date 3: 3 October 2020 to 20 December 2020   (Salvia Street - Half Road)

Duration 1: 6:30am – 5pm

Duration 2: 5pm - 6:30am (after care only)

Reason: To facilitate Stage 2 of stormwater, kerb and channel and road reinstatement works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 32 of 164

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

Start date: 15 September 2020

End date: 25 February 2021 
 
Duration: 12.00am - 11.59pm

Reason: Construction Fencing / Compound

south

Road closures